Brief instruction on the operation of the object's APP settings. Typical operating instructions for automatic water fire extinguishing installations Typical malfunctions and methods for their elimination

The buildings 17.06.2019

General provisions

The procedure for the operation and maintenance of automatic fire extinguishing systems (installations) (AUP) is regulated by GOST, SNiP, PPB, departmental norms and rules, and technical operational documentation for installations.
Responsibility for the organization of the operation of the AFS is assigned to the managers of facilities that are protected by fire automatics.
For each AUP, an order or order for the enterprise (organization) should be issued, appointing:
— the person responsible for the operation of the facility;
— operational (on-duty) personnel for round-the-clock monitoring of the operational state of the installations.

For each AMS for persons responsible for the operation of the installation, and for the personnel servicing this installation, operating instructions should be developed taking into account the specifics of the protected premises, approved by the management of the enterprise and agreed with the organization performing maintenance and R AUP.
The person responsible for the operation of the AFS must promptly inform the local authorities of the State Fire Service about failures and operation of the installations.
Operational (on-duty) personnel must have and fill out the “Installation Fault Log”.
An enterprise that carries out maintenance and repair of automatic fire protection systems must have a license for installation, adjustment, repair and maintenance of equipment and fire protection systems.
It is allowed to carry out maintenance and repair by specialists of the facility who have the appropriate qualifications. At the same time, the procedure for carrying out maintenance and repair work must comply with the VNIIPO Methodological Recommendations.

Restoration of the operability of the AFS or ASPS after its operation or failure should not exceed:
- for Moscow, St. Petersburg, administrative centers of autonomous entities as part of Russian Federation— 6 h;
for other cities and settlements— 18 o'clock

Between the operating organization and the enterprise carrying out maintenance and repair, an "Agreement for the maintenance and repair of automatic fire extinguishing installations" must be concluded and valid.
In the control room there should be an instruction on the procedure for the dispatcher on duty when receiving alarm signals.
The adoption of AUP for maintenance and repair should be preceded by an initial inspection of the installation in order to determine its technical condition.
The primary examination of the AMS should be carried out by a commission, which includes a representative of the GPN bodies.
Based on the results of the inspection of the automatic fire extinguishing system, an “Act of the initial inspection of automatic fire extinguishing installations” and an “Act for the work performed on the initial inspection of automatic fire extinguishing installations” should be drawn up.

For an installation accepted for maintenance and repair, after the conclusion of the contract, the following must be completed:
- passport of automatic fire extinguishing installation;
- a log of registration of maintenance and repair of automatic fire extinguishing installations. It should record all maintenance and repair work, including quality control. One copy of this log should be kept by the person responsible for the operation of the installation, the second - in the organization performing maintenance and repair. The log should also indicate the safety briefing of the personnel carrying out maintenance and repair, responsible for the operation of the installation. The pages of the magazine must be numbered, laced and sealed with the seals of organizations serving the AUP and carrying out maintenance and repair;
— Maintenance and repair schedule. The procedure for maintenance and repair of AUP, as well as the deadline for eliminating failures, installations must comply with the VNIIPO Methodological Recommendations. The list and frequency of maintenance work must comply with the standard regulations for the maintenance of AUP;

- technical requirements that determine the performance parameters of the AUP.

The following technical documentation must be available at the enterprise:
- act of primary inspection of AUP;
- an act on the work performed on the initial examination of the AUP;
— contract for maintenance and repair;
- schedule for maintenance and repair;
- technical requirements that determine the performance parameters of the AUP;
- list technical means included in the AUP and subject to maintenance and repair;
— call log;
— certificate of technical examination of AUP;
— project for AUP;
— passports, certificates for equipment and devices;
- a list of installed equipment, assemblies, instruments and automation equipment;
- passports for charging cylinders of gas fire extinguishing installations;
— instruction manual for the installation;
— journal of registration of works on maintenance and repair;
- duty schedule of operational (duty) personnel;
- log of acceptance of duty by operational personnel;
- a log of weighing (control) of cylinders with a fire extinguishing composition of gas fire extinguishing installations.

All necessary documentation for the AFS (or photocopies) must be kept by the person responsible for the operation of the AFS.
During an external inspection of the AFS and the premises protected by it, it is necessary to check compliance with the project:
— characteristics of the protected space and its combustible load;
- modifications of sprinklers of fire extinguishing installations, the method of their installation and placement;
- cleanliness of sprinklers;
- pipelines of installations (it is not allowed to use pipelines of fire extinguishing installations for suspension, attachment, connection of equipment that is not related to AUP);
- light and sound alarm located in the control room;
- telephone communication of the control center with the fire department of the enterprise or settlement.

Features of checking fire extinguishing installations

Checking the water and foam fire extinguishing

When conducting a survey of the technical condition of water and foam fire extinguishing installations, it is necessary to be guided by GOST R 50680, GOST R 50800, NPB 88-2001 and the requirements of the VNIIPO Methodological Recommendations.
During the inspection of water and foam fire extinguishing installations, the following should be checked:
1. Condition of sprinklers (in places where there is a risk of mechanical damage, sprinklers must be protected by reliable fences that do not affect the irrigation map and the distribution of heat flows).
2. Standard sizes of sprinklers (within each distribution pipeline (one section), sprinklers with outlets of the same diameter should be installed).
3. Maintenance of sprinklers (should be kept clean at all times; during the period and in the protected area repair work Sprinklers must be protected from getting plaster on them. paints and whitewash; after the repair of the premises, the protective devices must be removed).
4. Availability of a supply of sprinklers (should be at least 10% for each type of sprinklers from among those mounted on distribution pipelines, for their timely replacement during operation).
5. Protective covering pipelines (in rooms with a chemically active or aggressive environment, they must be protected with acid-resistant paint).
6. The presence of a functional diagram for tying control nodes (each node must have a functional diagram piping, and in each direction - a plate indicating the operating pressures, protected premises, mud and the number of sprinklers in each section of the system, the position (state) of the locking elements in standby mode).
7. Availability of emergency water storage tanks for firefighting purposes with devices that exclude water consumption for other needs.
8. Availability of reserve stock of foam concentrate (100% reserve stock of foam concentrate must be provided).
9. Provision of premises pumping station telephone communication with the control room.
10. The presence at the entrance to the premises of the pumping station of the sign "Fire extinguishing station" and a constantly functioning light panel with a similar inscription.
11. The presence of clearly and accurately executed schemes of piping of the pumping station and a concept diagram of the fire extinguishing installation posted in the premises of the pumping station. All indicating measuring instruments must have inscriptions on working pressures and the permissible limits of their measurements.
12. Installation test period (testing of water and foam fire extinguishing installations during their operation should be carried out at least once every 5 years).

During the operation of the AUP, it is prohibited:
- install plugs and plugs instead of opened or faulty sprinklers, as well as install sprinklers with other than the prescribed project documentation, the melting point of the castle;
- store materials at a distance of less than 0.6 m from sprinklers;
- use pipelines of fire extinguishing installations for suspension or fastening of any equipment;
— connect production or plumbing equipment to the supply pipelines of the fire extinguishing installation;
- install shut-off valves and flange connections on supply and distribution pipelines;
- use internal fire hydrants installed on the sprinkler network for other purposes than extinguishing a fire;
— use compressors for purposes other than ensuring the operability of the installation.

Features of checking gas fire extinguishing installations

In the process of control of the UGP during operation, it is necessary to:
- conduct an external inspection constituent parts installation for the absence of mechanical damage, dirt, fastening strength, the presence of seals;
— control working position shut-off valves in the incentive network and starting cylinders;
- check the main and backup power supply, check the automatic switching of power from the working input to the backup one;
- control the amount of fire extinguishers by weighing or controlling pressure (for centralized gas fired units - the main and reserve quantity of fire extinguishing agents, for modular gas fired units - the amount of fire extinguishing agents and the presence of its stock);
- check the operability of the components of the installation (technological part, electrical part);
- check the operability of the installation in manual (remote) and automatic modes;
- check the availability of metrological verification of instrumentation;
- measure the resistance of protective and working grounding;
- measure the insulation resistance electrical circuits;
- check the availability and validity of the technical examination of the components of the UGP, working under pressure.

The control and testing of the UGP should be carried out without the release of a fire extinguishing composition according to the methods set forth in GOST R 50969.
The control of the mass (pressure) of the GOS, the control of gas pressure in the incentive cylinders must be carried out within the time limits established by the TD for the UGP, with a note in the log. The requirements for GOS and propellant gas used for refueling (pumping) UGP should be the same as for the initial refueling.
Fire extinguishing stations must be equipped and maintained in a condition consistent with design decisions.
If during the operation of the UGP there was its operation or failure, the operability of the UGP should be restored (filling the GOS with propellant gas, replacing modules, squibs in launch cylinders, switchgears ah, etc.) within the established time limits and the corresponding entries in the journal were made.
In the case of using the GOS from the stock of the UGP, it must be restored simultaneously with the restoration of the efficiency of the UGP.

Features of checking aerosol fire extinguishing installations

When examining objects protected by AFS, it is necessary to control compliance with a number of regulatory requirements.
The requirements of the maintenance schedule for the examined AAP must not be lower than the requirements of the "Typical maintenance schedule for aerosol fire extinguishing installations".
If mechanical damage is possible at the installation site of the GOA, then they must be protected.
GOA installation sites and their orientation in space must comply with the project.
GOA must have seals or other devices confirming their integrity.
The combustible load of the room protected by the AAP, its leakage and geometric dimensions must match the design.
Combustible materials should not be located on the surface of the GOA and in the zone of influence of a high-temperature aerosol jet.
Electric wires intended for supplying an electrical impulse to the GOA launcher must be laid and protected from thermal and other influences in accordance with the project.
The stock of GOA must correspond to the project.
Light and sound alarms must be in good working order in the protected room and in the room on duty.
There should be instructions for the maintenance personnel located in the protected room on the actions to be taken when the aerosol fire extinguishing installation is triggered.

Features of checking modular installations of powder fire extinguishing.

The list and frequency of maintenance work is determined in accordance with the regulations drawn up by the MAUPT developer on the basis of the technical documentation for the components. The requirements of the maintenance schedule for a specific MAUPT should not be lower than the requirements of the standard maintenance schedule.


List of works

Frequency of service by the enterprise operation service

Periodicity of service by specialized enterprises

Visual inspection of the system components (pipelines, sprayers, powder modules, compressed gas cylinders, pressure gauges, etc.; electrical part of electrical cabinets, etc.; signaling part reception and control devices, detectors, etc.) for mechanical damage, dirt, fastening strength, etc.

Daily

Monthly

Pressure control in modules and launch cylinders

Control of the main and backup power supplies, checking the automatic switching of power from the working input to the reserve one

Weekly

Quality control of fire extinguishing powder

In accordance with the TD for the module

In accordance with the TD for the module

Checking the performance of the components of the system (technological part, electrical part, signaling)

Monthly

Monthly

Preventive work

System performance check in manual (local, remote) and automatic modes

At least twice a year

At least twice a year

Metrological verification of instrumentation

Annually

Annually

Measuring the resistance of protective and working earth

The State Fire Service bodies check the availability of entries in the register of maintenance and current repairs of the MAUPT in accordance with the regulations and check the maintenance of the pressure vessel passport (if necessary, in accordance with PB 10-115).

Additionally, representatives of the State Border Service conduct an external inspection of the MAUPT:
- the presence of factory seals;
— the presence of a displacing gas;
- Availability safety devices, according to the documentation for the module;
- the presence of the module marking, as well as the compliance of the fire extinguishing powder brand with the fire classes in the room;
- the presence of devices from the spontaneous launch of the MAUPT;
- the state of the linear part of the signaling loop;
- compliance with the laid electrical wiring, installed detectors. appliances, boxes, etc. project documentation.

Maintenance AUP after commissioning, should be carried out in the amount and terms established by special schedules, in accordance with technical documentation on its elements, but at least once a quarter.

The fire extinguishing installation after the replacement of equipment, repair must undergo 72 hours of control in the operating mode (measures should be provided to exclude the supply of fire extinguishing agents).

It is necessary to observe the rules for storage, transportation and disposal of the plant elements specified in the operational documents for these elements.

In the protected premises, there should be instructions on the actions of the people working in them in the event of the installation being triggered.

During the period of repair work in the protected premises sprinklers (sprayers, nozzles, thermal locks, fire detectors, elements of a cable incentive system) must be protected from getting plaster, paint, whitewash, etc. on them. After the renovation of the premises, the devices that provided protection must be removed.

Faulty sprinklers and nozzles should be replaced with similar products (for example, from the spare parts kit), while maintaining their orientation in space in accordance with the project for the installation. It is not allowed to install plugs or plugs to replace faulty sprinklers or nozzles. It is not allowed to clutter up the space in front of sprinklers (nozzles) with equipment, lighting fixtures etc. During maintenance, it is necessary to periodically flush (purge) pipelines to remove dirt and rust, as well as test pipelines for strength and tightness.

It is forbidden:

    - use the pipelines of the installation for suspension or fastening of any equipment;

    - connect production equipment and sanitary appliances to the supply (distribution) pipelines of the installation, install shut-off valves on them (except for those provided for by the project);

    - use internal fire hydrants for other purposes than extinguishing fires.

When performing restoration work coatings elements of the installation must comply with the identification colors established by the project.

During the operation of the installation volumetric fire extinguishing, the type of fire load, the size and placement of open openings in the protected premises must comply with the project. Measures should be taken to eliminate technologically unjustified openings, control the performance of door closers, etc. The premises, if necessary, must have serviceable devices (or permanently open openings) to relieve pressure. Changes in the characteristics of the premises that were used as initial data in the design of the AFS (changes in the type of fire load, the size and placement of permanently open openings, etc.) should be agreed with the organization-developer of the AFS.

fire station must be provided with a direct telephone connection with the premises of the pumping station (gas fire extinguishing station), as well as city telephone communications, serviceable electric lights.

Periodically, the operability of the light and sound signaling of the operation of the fire extinguishing installation and its malfunction should be checked. At the fire station, round-the-clock and constant duty of personnel should be organized. The actions of the duty personnel upon receipt of signals are specified in the instructions.

Appendix: Forms of operational documents automatic systems(installations) fire extinguishing

Download Word App >>> Please or to access this content

Instruction

on the operation of the automatic system station

water fire extinguishing

1. The procedure for determining the operability of the installation and external signaling technological equipment with automatic and manual start.

2. Modes of operation of technological equipment in standby mode.

3. The procedure for the duty personnel when taking up duty.

4. Actions of duty personnel in case of fire.

5. The procedure for the on-duty personnel when a signal about a malfunction of the installation is received.

1. Procedure for determining health

installations and external alarms.

1.1. Auto mode

The fire extinguishing installation must operate in automatic mode, while the lamps “Voltage at input No. 1”, “Voltage at input No. 2” should be lit on the YS switchboard located in the fire station, and all other lamps should not light. In the control unit (pump station) on the switchboard, all lamps are off, the keys for controlling the operation mode of the main (No. 1) and backup (No. 2) pumps (on the switchboard of the ShN) must be in the “Automatic” position

1.2. Manual mode

During routine maintenance or at the request of the operation service, the unit can be switched to manual mode, while the lamps "Input voltage No. 1", "Input voltage No. “Disabling the automatics of the backup pump”, in the control unit (pumping room) on the switchboard of the SHN, the keys for controlling the operating mode of the main (No. 1) and backup (No. 2) pumps must be in the “Manual” position and the lights “Disable automatic start-up of the working pump” are on, “Disabling the automatic start of the backup pump”, all other lights on the switchboard are off.

2. Operating modes of technological equipment

in standby mode.

Control unit (pumping station):

Above front door the lamp "Fire extinguishing station" is on

The pressure above the VS-100 valve according to the pressure gauge MP No. 1 is not less than ___ atm.

The pressure in the pneumatic tank is not lower than ___ atm. according to EKM-2

The water level in the pneumatic tank is at the level of 1/2 control glass

Valves No. 1,2,3,4,5,6,7,8 – open

Gate valves No. 9,10 - closed

Valves No. 1,2 - open

Valves No. No. 3.4,5,6,7 - closed

Leaks from the valve, valves should not be

Gate valves, valves and mode control keys must be sealed with seal No. 2 "Frontier"

3. The procedure for the duty officer when

taking up duty.

The attendant must:

1. Make a detour and perform an external inspection of the equipment and check the readings of the devices - "Fire station" (duty personnel), "Control unit (pumping room)", "Protected premises" (duty electrician).

2. Make sure that the light and sound signaling according to clause 1.1 and clause 1.2.

3. Make sure that the operating modes of the process equipment are consistent. (duty electrician)

4. Check the operation of the light and sound alarm: (staff on duty)

A) press the "Light signal test" button - all the lamps on the YaS shield will light up, except for the reserve.

B) press the "Fire signal test" button - the "Fire" lamp will light up and the howler will work.

B) press the "Failure signal test" button - the "Fault" lamp will light up and the bell will ring.

5. Make entries in the "Journal for monitoring the technical condition of the fire extinguishing installation" readings of pressure gauge No. 1 and EKM No. 2. (electrician on duty) Perform rounds at 6.00, 12.00, 18.00, 24.00 hours.

4. The procedure for the duty personnel in case of fire

Automatic sharp

In the event of a fire in the protected premises (damage, destruction of the sprinkler), automatic equipment is activated and irrigates the fire. Yas works on the shield light signaling: "Fire", and the howler turns on. With a further drop in pressure, ECM No. 2 is triggered and the lamps on the YS shield light up: “Pressure drop in impulse device” and “Malfunction”, “Start the working pump” and the howler and bell ring. If the working pump has not created pressure (faulty), the backup pump (No. 2) is automatically started and the lamp “Start the backup pump” lights up on the shield. It is necessary to turn off the sound signals on the YaS shield by switching the toggle switches.

Manual sharp.

In the event of a fire in the protected premises (damage, destruction of the sprinkler), automatic equipment is activated and irrigates the fire. A light alarm is triggered on the YaS shield: “Fire”, and the howler turns on. It is necessary to turn off the sound signals on the YaS shield by switching the toggle switches (personnel on duty) to call the electrician on duty.

The pumps are started from the “Control Unit” (pump room) when the keys for controlling the pump modes (primary and backup) on the switchboard are switched to the “Manual” position. Open gate valve No. 1 under the BC-100 valve. The pump is started by pressing the "Start" button of one of the pumps. (duty electrician)

After the fire was extinguished.

Switch the keys for controlling the operating modes of the pumps in the “Control Unit” (pump room) on the SHN board to the “Manual” position, if they were in the “Automatic” position, press the “Stop” buttons of both pumps. Close gate valve No. 1 under the BC-100 valve. (duty electrician).

Restore the system should be representatives of a specialized organization.

5. The procedure for the duty person when

receiving a "fault" signal.

The "Fault" signal appears in the following cases:

No voltage on one of the inputs;

Disabling automation;

Breakage of SDU circuits;

Decrease or lack of pressure in the impulse tank, while on the shield of the YaS

the light signaling "Fault" is activated and the bell rings.

Necessary:

1. Turn off the sound alarm and call the electrician on duty (personnel on duty)

2. Notify the person responsible for the operation of the water fire extinguishing installation, (duty electrician)

3. Make an entry in the "Journal of malfunctions and fire extinguishing operations and fire alarm", (duty electrician)

4. Call representatives of the service organization by phone.

RUSSIAN JOINT STOCK COMPANY
ENERGY AND ELECTRIFICATION "UES OF RUSSIA"

DEPARTMENT OF SCIENCE AND TECHNOLOGY

STANDARD INSTRUCTIONS
FOR THE OPERATION OF AUTOMATIC WATER EXTINGUISHING INSTALLATIONS

RD 34.49.501-95

SERVICE OF EXCELLENCE ORGRES

MOSCOW 1996

DEVELOPED Joint-stock company "Firm for adjustment, improvement of technology
and operation of power plants and networks "ORGRES".

AGREED with the Department of General Inspection for the Operation of Power Plants
and networks of RAO "UES of Russia" December 28, 1995

IN REPLACEMENT TI 34-00-046-85.

VALIDITY installed from 01.01.97

This Standard Instruction contains the basic requirements for the operation of technological equipment of water fire extinguishing installations used at energy enterprises, as well as the procedure for flushing and pressure testing pipelines of fire extinguishing installations. The volume and sequence of control of the state of technological equipment, the timing of the revision of all equipment of fire extinguishing installations are indicated, and basic recommendations for troubleshooting are given.

Responsibility for the operation of fire extinguishing installations has been established, the necessary working documentation and training requirements.

The main safety requirements for the operation of fire extinguishing installations are indicated.

Forms of acts of flushing and pressure testing of pipelines and fire tests are given.

With the release of this Standard Instruction, the Standard Instruction for the Operation of Automatic Fire-Extinguishing Installations: TI 34-00-046-85 (M.: SPO Soyuztekhenergo, 1985) becomes invalid.

1. INTRODUCTION

1.1. The standard instruction establishes the requirements for the operation of technological equipment of water fire extinguishing installations and is mandatory for managers of energy enterprises, heads of workshops and persons appointed responsible for the operation of fire extinguishing installations.

1.2. Technical requirements for the operation of technological equipment of foam fire extinguishing installations are set out in the “Instructions for the operation of fire extinguishing installations using air-mechanical foam” (M .: SPO ORGRES, 1997).

1.3. When operating a fire alarm of an automatic fire extinguishing installation (AUP), one should be guided by the "Standard Instructions for the Operation of Automatic Fire Alarm Installations at Power Plants" (M.: SPO ORGRES, 1996).

The following abbreviations have been adopted in this Model Instruction.

UVP - water fire extinguishing installation,

AUP - automatic fire extinguishing installation,

AUVP - automatic water fire extinguishing installation,

PPS - fire alarm panel,

PUEZ - control panel for electric valves,

PUPN - fire pump control panel,

PI - fire detector,

PN - fire pump,

OK - check valve,

DV - water drencher,

DVM - modernized water drencher,

OPDR - foam-drencher sprinkler.

2. GENERAL INSTRUCTIONS

2.1. On the basis of this Standard Instruction, the organization that adjusted the process equipment of the AUP, together with the power company where this equipment is installed, must develop a local instruction for the operation of the process equipment.
and AUP devices. If the adjustment was carried out by a power company, then the instructions are developed by the personnel of this enterprise. Local instruction must be developed at least one month in advance
before the acceptance of the AUP into operation.

2.2. Local instructions must take into account the requirements of this Model Instruction.
and the requirements of factory passports and instructions for the operation of equipment, instruments and apparatus that are part of the AUVP. Reducing the requirements set forth in these documents is not allowed.

2.3. The local instruction must be reviewed at least once every three years and each time after the reconstruction of the AUP or in the event of a change in operating conditions.

2.4. Acceptance of the AUP for operation should be carried out in the composition of representatives:

energy companies (chairman);

design, installation and commissioning organizations;

state fire control.

The work program of the commission and the acceptance certificate must be approved by the chief technical
the head of the enterprise.

3. SAFETY PRECAUTIONS

3.1. During the operation of technological equipment of water fire extinguishing installations
the personnel of power enterprises must comply with the relevant safety requirements specified in the PTE, PTB, as well as in the factory passports and operating instructions for a specific
equipment.

3.2. During the maintenance and repair of the AFS, when visiting the premises protected by the AFS, the automatic control of a specific distribution pipeline in this direction must be switched to manual (remote) before the last person leaves the premises.

3.3. Pressure testing of pipelines with water should be carried out only according to an approved program,
which should include measures to ensure the protection of personnel from a possible rupture of pipelines. Need to ensure complete removal air from pipelines. Combining work on pressure testing with other work in the same room is prohibited. If pressure testing is carried out by contractors, then the work is carried out according to the work permit. The performance of these works by the operational or maintenance personnel of the power enterprise is documented in a written order.

3.4. Before starting work, the personnel involved in pressure testing must be instructed in safety at the workplace.

3.5. Unauthorized persons must not be in the room during the pressure test. Pressurization must be carried out under the supervision of a responsible person.

3.6. Repair work on process equipment should be carried out after depressurizing this equipment and preparing the necessary organizational and technical measures established by the current PTB.

4. PREPARATION FOR WORK AND CHECK
TECHNICAL CONDITION OF THE FIRE EXTINGUISHING INSTALLATION

4.1. Water fire extinguishing installation consists of:

source of water supply (reservoir, pond, city water supply, etc.);

fire pumps (designed for the intake and supply of water to pressure pipelines);

suction pipelines (connecting the water source to fire pumps);

pressure pipelines (from the pump to the control unit);

distribution pipelines (laid within the protected premises);

control units installed at the end of pressure pipelines;

sprinklers.

In addition to the above, based on the design solutions, the scheme of fire extinguishing installations can include:

water tank for filling fire pumps;

pneumatic tank for maintaining constant pressure in the network of the fire extinguishing installation;

compressor for feeding the pneumatic tank with air;

drain taps;

check valves;

dosing washers;

pressure switch;

manometers;

vacuum gauges;

level gauges for level measurement in tanks and pneumatic tank;

other signaling, control and automation devices.

The schematic diagram of the water fire extinguishing installation is shown in the figure.

4.2. After graduation installation work suction, pressure and distribution pipelines must be flushed and subjected to hydraulic tests. The results of washing and pressing should be documented in acts (Appendices 1 and 2).

If possible, the effectiveness of the fire extinguishing installation should be checked by organizing the extinguishing of an artificial fire source (Appendix 3).

Schematic diagram of a water fire extinguishing installation:

1 - water storage tank; 2 - fire pump (PN) with electric drive; 3 - pressure pipeline;
4 - suction pipeline; 5 - distribution pipeline; 6 - fire detector (PI);
7 - control unit; 8 - manometer; 9 - check valve (OK)

Notese. Standby fire pump with fittings not shown..

4.3. When flushing pipelines, water should be supplied from their ends towards the control units (in order to prevent clogging of pipes with a smaller diameter) at a speed of 15–20% more than the water speed during a fire (determined by calculation or recommendations of design organizations). Flushing should be continued until a stable appearance of clean water.

If it is impossible to flush individual sections of pipelines, it is allowed to purge them
dry, clean, compressed air or inert gas.

4.4. Hydraulic testing of pipelines must be carried out under a pressure equal to 1.25 working (P), but not less than P + 0.3 MPa, for 10 minutes.

To isolate the test section from the rest of the network, blind flanges or plugs must be installed. It is not allowed to use existing control units, repair valves, etc. for this purpose.

After 10 minutes of testing, the pressure should be gradually reduced to working pressure and a thorough inspection of all welded joints and adjacent areas should be carried out.

The pipeline network is considered to have passed the hydraulic test if there are no signs of rupture, leakage and drops in the welded joints and on the base metal, visible residual
deformations.

The pressure should be measured with two manometers.

4.5. Flushing and hydraulic testing of pipelines should be carried out under conditions
preventing them from freezing.

It is forbidden to backfill open trenches with pipelines that have been exposed to severe frosts, or to backfill such trenches with frozen soil.

4.6. Automatic water fire extinguishing installations must operate in automatic start mode. For the period of stay in cable facilities of personnel (bypass, repair work
etc.), the start-up of the installations must be switched to manual (remote) switching on (clause 3.2).

5. MAINTENANCE OF FIRE EXTINGUISHING INSTALLATIONS

5.1. Organizational events

5.1.1. Persons responsible for the operation, implementation of capital and current repairs technological equipment of the fire extinguishing installation are appointed by the head of the power company, who also approves the schedules for technical supervision and equipment repair.

5.1.2. The person responsible for the constant readiness of the technological equipment of the fire extinguishing installation must be well aware of the principle of the device and the operation of this equipment,
and also have the following documentation:

a project with changes made during the installation and commissioning of the fire extinguishing installation;

factory passports and operating instructions for equipment and devices;

this Standard Instruction and the local operating instructions for the process equipment;

acts and protocols for conducting installation and adjustment work, as well as testing the operation of process equipment;

schedules for maintenance and repair of process equipment;

"Journal of accounting for the maintenance and repair of a fire extinguishing installation."

5.1.3. Any deviations from the scheme adopted by the project, replacement of equipment, additional
installation of sprinklers or their replacement by sprinklers with a large nozzle diameter must be preliminarily agreed with the design institute - the author of the project.

5.1.4. To monitor the technical condition of the technological equipment of the fire extinguishing installation, a “Journal of accounting for the maintenance and repair of the fire extinguishing installation” should be maintained, which should record the date and time of the check, who carried out the check, the detected malfunctions, their nature and time of their elimination, the time of forced shutdown and on fire-extinguishing installations, ongoing testing of the operation of the entire installation or individual equipment. Approximate form the journal is given in Appendix 4.

At least once a quarter, the content of the magazine should be reviewed against receipt by the chief technical manager of the enterprise.

5.1.5. To check the readiness and effectiveness of the AUVP, once every three years, a complete revision of the technological equipment of this installation should be carried out.

During the audit, in addition to the main work, pressure testing of the pressure pipeline is carried out and flushing (or purging) and pressure testing of distribution pipelines (clauses 4.2–4.5) in the most aggressive environment (dampness, gas contamination, dust) are carried out in two or three directions.

If deficiencies are found, it is necessary to develop measures to ensure full
their elimination in a short time.

5.1.6. Automatic fire extinguishing installation in accordance with the approved schedule
by the head of the relevant department, but at least once every three years they must be tested (tested) according to a specially developed program with a real start-up of them, provided that this
will not entail a shutdown of technological equipment or the entire production process. During testing on the first and last sprinklers, the water pressure and irrigation intensity should be checked.

Testing should be carried out for 1.5-2 minutes with the inclusion of serviceable drainage devices.

Based on the results of testing, an act or protocol must be drawn up, and the fact of testing itself is recorded in the "Journal of maintenance and repair of the fire extinguishing installation".

5.1.7. Checking the operation of the AUVP or certain types of equipment should be carried out during the withdrawal for repair, maintenance of the protected premises and the technological installation.

5.1.8. For storing spare equipment, equipment parts, as well as fixtures,
tools, materials, devices necessary for the control and organization of repair work of the AUVP, a special room should be allocated.

5.1.9. The technical capabilities of the AUWP should be included in the fire extinguishing operational plan
at this power plant. During fire drills, it is necessary to expand the circle of personnel who know the purpose and device of the AUVP, as well as the procedure for bringing it into action.

5.1.10. Personnel servicing AUVP compressors and pneumatic tanks must be trained and certified in accordance with the requirements of the Gosgortekhnadzor rules.

5.1.11. The person responsible for the operation of the technological equipment of the fire extinguishing installation must organize training sessions with the personnel assigned to control the operation and maintenance of this equipment.

5.1.12. In the premises of the AUVP pumping station, the following must be posted: instructions on how to turn on the pumps and open valves, as well as schematic and technological diagrams.

5.2. Technical requirements for AUVP

5.2.1. Entrances to the building (premises) of the pumping station and fire extinguishing installation, as well as approaches to pumps, pneumatic tank, compressor, control units, pressure gauges and other equipment of the fire extinguishing installation, must always be free.

5.2.2. At the existing fire extinguishing installation, they must be sealed in the working
position:

hatches of reservoirs and containers for storing water supplies;

control units, gate valves and manual actuation valves;

pressure switch;

drain valves.

5.2.3. After the fire extinguishing installation is activated, its performance should be fully restored not after 24 hours.

Operating instructions for automatic water fire extinguishing installations from Stroy-Universal.

Company "Stroy-Universal" hopes that given material It will be useful to everyone who is interested in security and fire extinguishing systems.

1. Introduction

1.1. The standard instruction establishes the requirements for the operation of technological equipment of water fire extinguishing installations and is mandatory for managers of energy enterprises, heads of workshops and persons appointed responsible for the operation of fire extinguishing installations.

1.2. Technical requirements for the operation of technological equipment of foam fire extinguishing installations are set out in the "Instructions for the operation of fire extinguishing installations using air-mechanical foam" (M.: SPO ORGRES, 1997).

1.3. When operating a fire alarm automatic fire extinguishing installation (AUP), one should be guided by the "Typical instructions for the operation of automatic fire alarm installations at power enterprises" (M .: SPO ORGRES, 1996).

The following abbreviations have been adopted in this Model Instruction.

UVP - water fire extinguishing installation
AUP - automatic fire extinguishing installation
AUVP - automatic water fire extinguishing installation
PPS - fire alarm panel
PUEZ - control panel for electric valves
PUPN - fire pump control panel
PI - fire detector
PN - fire pump OK - check valve
DV - water drencher
DVM - modernized water drencher
OPDR - foam-drencher sprinkler.

2.GENERAL INSTRUCTIONS FOR THE USE OF AUTOMATIC WATER EXTINGUISHING INSTALLATIONS

2.1. Based on this Standard Instruction, the organization that adjusted the technological equipment of an automatic fire extinguishing installation, together with the power plant where this equipment is installed, must develop local instructions for the operation of technological equipment and automatic water fire extinguishing devices. If the adjustment was carried out by a power company, then the instructions are developed by the personnel of this enterprise. Local instructions must be developed at least one month before the acceptance of the automatic fire extinguishing installation into operation.

2.2. The local instructions must take into account the requirements of this Standard Instruction and the requirements of factory passports and operating instructions for equipment, instruments and apparatus that are part of the automatic water fire extinguishing installation. Reducing the requirements set forth in these documents is not allowed.

2.3. The local instruction must be reviewed at least once every three years and every time after the reconstruction of the automatic fire extinguishing installation or in the event of a change in operating conditions.

2.4. Acceptance of an automatic fire extinguishing installation into operation should be carried out as part of representatives:

energy companies (chairman);

design, installation and commissioning organizations;

state fire control.

The work program of the commission and the act of acceptance must be approved by the chief technical officer of the enterprise.

3. SAFETY PRECAUTIONS FOR THE OPERATION OF AUTOMATIC WATER EXTINGUISHING INSTALLATIONS

3.1. When operating the technological equipment of water fire extinguishing installations, the personnel of power enterprises must comply with the relevant safety requirements specified in the PTE, PTB, as well as in the factory passports and operating instructions for specific equipment.

3.2. During maintenance and repair of an automatic fire extinguishing installation, when visiting a room protected by an automatic fire extinguishing installation, the automatic control of a specific distribution pipeline in this direction must be switched to manual (remote) before the last person leaves the premises.

3.3. Pressure testing of pipelines with water should be carried out only according to an approved program, which should include measures to ensure the protection of personnel from a possible rupture of pipelines. It is necessary to ensure complete removal of air from the pipelines. Combining work on pressure testing with other work in the same room is prohibited. If pressure testing is carried out by contractors, then the work is carried out according to the work permit. The performance of these works by the operational or maintenance personnel of the power enterprise is documented in a written order.

3.4. Before starting work, the personnel involved in pressure testing must be instructed in safety at the workplace.

3.5. Unauthorized persons must not be in the room during the pressure test. Pressurization must be carried out under the supervision of a responsible person.

3.6. Repair work on process equipment should be carried out after depressurizing this equipment and preparing the necessary organizational and technical measures established by the current PTB.

4. PREPARATION FOR WORK AND CHECK THE TECHNICAL CONDITION OF THE WATER FIRE EXTINGUISHING INSTALLATION

4.1. Water fire extinguishing installation consists of:

Source of water supply (reservoir, pond, city water supply, etc.);
- fire pumps (designed for the intake and supply of water to pressure pipelines);
- suction pipelines (connecting the water source with fire pumps);
- pressure pipelines (from the pump to the control unit);
- distribution pipelines (laid within the protected premises);
- control units installed at the end of pressure pipelines;
- sprinklers.

In addition to the above, based on the design solutions, the scheme of fire extinguishing installations can include:

Water tank for filling fire pumps;
- pneumatic tank to maintain constant pressure in the network of the fire extinguishing installation;
- compressor for feeding the pneumatic tank with air;
- drain cocks;
- check valves;
- dosing washers;
- pressure switch;
- manometers;
- vacuum gauges;
- level gauges for level measurement in tanks and pneumatic tank;
- other signaling, control and automation devices.

The schematic diagram of the water fire extinguishing installation is shown in the figure.

4.2. After completion of installation work, suction, pressure and distribution pipelines must be flushed and subjected to hydraulic tests. The results of flushing and pressure testing must be documented in acts (Appendices 1 and 2).

If possible, the effectiveness of the fire extinguishing installation should be checked by organizing the extinguishing of an artificial fire source (Appendix 3).

4.3. When flushing pipelines, water should be supplied from their ends towards control units (in order to prevent clogging of pipes with a smaller diameter) at a speed of 15-20% more than the speed of water during a fire (determined by calculation or recommendations of design organizations). Flushing should be continued until a stable appearance of clean water.

If it is impossible to flush individual sections of pipelines, it is allowed to purge them with dry, clean, compressed air or inert gas.

4.4. Hydraulic testing of pipelines must be carried out under a pressure equal to 1.25 working (P), but not less than P + 0.3 MPa, for 10 minutes.

To isolate the test section from the rest of the network, blind flanges or plugs must be installed. It is not allowed to use existing control units, repair valves, etc. for this purpose.

After 10 minutes of testing, the pressure should be gradually reduced to working pressure and a thorough inspection of all welded joints and adjacent areas should be carried out.

The pipeline network is considered to have passed the hydraulic test if there are no signs of rupture, leakage and drops in the welded joints and on the base metal, visible residual deformations.

The pressure should be measured with two manometers.

4.5. Flushing and hydraulic testing of pipelines must be carried out under conditions that exclude their freezing.

It is forbidden to backfill open trenches with pipelines that have been exposed to severe frosts, or to backfill such trenches with frozen soil.

4.6. Automatic water fire extinguishing installations must operate in automatic start mode. For the period of stay in the cable facilities of personnel (bypass, repair work, etc.), the start-up of the installations should be transferred to manual (remote) switching on (clause 3.2).

5. MAINTENANCE OF WATER EXTINGUISHING INSTALLATIONS

5.1. Organizational events

5.1.1. The persons responsible for the operation, overhaul and current repairs of the technological equipment of the fire extinguishing installation are appointed by the head of the energy enterprise, who also approves the schedules for technical supervision and equipment repair.

5.1.2. The person responsible for the constant readiness of the technological equipment of the fire extinguishing installation must be well aware of the principle of the device and the operation of this equipment, and also have the following documentation:

Project with changes made during the installation and commissioning of the fire extinguishing installation;
- factory passports and operating instructions for equipment and devices;
- this Standard Instruction and the local operating instructions for the process equipment;
- acts and protocols for conducting installation and adjustment works, as well as testing the operation of process equipment;
- schedules for maintenance and repair of process equipment;

"Journal of maintenance and repair of fire extinguishing installations".

5.1.3. Any deviations from the scheme adopted by the project, replacement of equipment, additional installation sprinklers or their replacement by sprinklers with a large nozzle diameter must be preliminarily agreed with the design institute - the author of the project.

5.1.4. To monitor the technical condition of the technological equipment of the fire extinguishing installation, a "Journal of accounting for the maintenance and repair of the fire extinguishing installation" should be maintained, which should record the date and time of the check, who carried out the check, the faults found, their nature and time of their elimination, the time of forced shutdown and turn on fire-extinguishing installations, ongoing testing of the operation of the entire installation or individual equipment. An approximate form of the journal is given in Appendix 4.

At least once a quarter, the content of the magazine should be reviewed against receipt by the chief technical manager of the enterprise.

5.1.5. To check the readiness and effectiveness of an automatic water fire extinguishing installation, a complete revision of the technological equipment of this installation should be carried out once every three years.

During the audit, in addition to the main work, pressure testing of the pressure pipeline is carried out and flushing (or purging) and pressure testing of distribution pipelines (clauses 4.2-4.5) in the most aggressive environment (dampness, gas contamination, dust) are carried out in two or three directions.
- If deficiencies are found, it is necessary to develop measures to ensure their complete elimination in a short time.
- It is recommended to end the revision with the submission extinguishing agent in one of the directions and, preferably, with the organization of an artificial fire.

5.1.6. Automatic fire extinguishing installation in accordance with the schedule approved by the head of the relevant department, but at least once every three years, must be tested (tested) according to a specially developed program with their actual start-up, provided that this does not entail a shutdown of process equipment or all production process. During testing on the first and last sprinklers, the water pressure and irrigation intensity should be checked.

Testing should be carried out for 1.5-2 minutes with the inclusion of serviceable drainage devices.

Based on the results of testing, an act or protocol should be drawn up, and the fact of testing itself should be recorded in the "Journal of maintenance and repair of the fire extinguishing installation".

5.1.7. Checking the operation of an automatic water fire extinguishing installation or certain types of equipment should be carried out during the withdrawal for repair, maintenance of the protected premises and the technological installation.

5.1.8. A special room must be allocated for the storage of spare equipment, equipment parts, as well as fixtures, tools, materials, devices necessary for monitoring and organizing repair work.

5.1.9. The technical capabilities of AUTOMATIC WATER FIRE EXTINGUISHING INSTALLATION should be included in the operational plan for extinguishing a fire at a given power enterprise. During firefighting exercises, it is necessary to expand the circle of personnel who know the purpose and device of the AUTOMATIC INSTALLATION OF WATER FIRE EXTINGUISHING, as well as the procedure for bringing it into action.

5.1.10. Personnel servicing compressors and pneumatic tanks AUTOMATIC INSTALLATION OF WATER FIRE EXTINGUISHING must be trained and certified in accordance with the requirements of the rules of Gosgortekhnadzor.

5.1.11. The person responsible for the operation of the technological equipment of the fire extinguishing installation must organize training sessions with the personnel assigned to control the operation and maintenance of this equipment.

5.1.12. In the premises of the pumping station, the AUTOMATIC INSTALLATION OF WATER FIRE EXTINGUISHING should be posted: instructions on how to turn on the pumps and open the shut-off valves, as well as the circuit and process diagrams.

5.2. Technical requirements for automatic water fire extinguishing installation

5.2.1. Entrances to the building (premises) of the pumping station and fire extinguishing installation, as well as approaches to pumps, pneumatic tank, compressor, control units, pressure gauges and other equipment of the fire extinguishing installation, must always be free.

5.2.2. At the operating fire extinguishing installation, the following shall be sealed in the working position: hatches of tanks and containers for storing water supplies;

control units, gate valves and manual actuation valves;

pressure switch; drain valves.

5.2.3. After the fire extinguishing installation is activated, its performance should be fully restored not after 24 hours.

5.3. Water storage tanks

5.3.1. Checking the water level in the tank should be carried out daily with registration in the "Journal of accounting for the maintenance and repair of the fire extinguishing installation."

If the water level decreases due to evaporation, it is necessary to add water, if there are leaks, determine the location of the damage to the tank and eliminate the leaks.

5.3.2. The correct operation of the automatic level gauge in the tank should be checked at least once every three months at positive temperatures, monthly - at negative temperature and immediately in case of doubt about the correct operation of the level gauge.

5.3.3. The tanks must be closed to access by unauthorized persons and sealed, the integrity of the seal is checked during the inspection of the equipment, but at least once a quarter.

5.3.4. The water in the tank must not contain mechanical impurities that could clog pipelines, dosing washers and sprinklers.

5.3.5. To prevent decay and flowering of water, it is recommended to disinfect it with bleach at the rate of 100 g of lime per 1 m of water.

5.3.6. It is necessary to replace the water in the reservoir annually in the autumn. When replacing water, the bottom and inner walls of the tank are cleaned of dirt and growths, the damaged color is restored or completely renewed.

5.3.7. Before the onset of frost in buried tanks, the gap between the lower and upper manhole covers must be filled with insulating material.

5.4. Suction pipeline

5.4.1. Once a quarter, the condition of the inputs, stop valves, measuring instruments and water well.

5.4.2. Before the onset of frost, the fittings in the intake well must be inspected, repaired if necessary, and the well insulated.

5.5. Pumping station

5.5.1. Before testing the pumps, it is necessary to check: tightness of glands; the level of lubrication in the bearing baths; correct tightening of foundation bolts, pump cover nuts and bearings; connection of the pipeline on the suction side and the pumps themselves.

5.5.2. Once a month, pumps and other equipment of the pumping station should be inspected, cleaned of dust and dirt.

5.5.3. Each fire pump must be turned on at least twice a month to create the required pressure, which is recorded in the operational log.

5.5.4. At least once a month, the reliability of the transfer of all fire pumps to the main and backup power supply should be checked, with the results recorded in the operational log.

5.5.5. If there is a special tank for filling the pumps with water, the latter should be inspected and painted annually.

5.5.6: Once every three years, pumps and motors according to 5.1.5. of this Standard Instruction must undergo an audit, during which all existing shortcomings are eliminated.

Repair and replacement of used parts, checking of oil seals are carried out as necessary.

5.5.7. The pumping station must be kept clean. In the absence of duty, it must be locked. One of the spare keys must be kept in the control box, which must be indicated on the door.

5.6. Pressure and distribution pipelines

5.6.1. Once a quarter you need to check:

absence of leaks and deflections of pipelines;

the presence of a constant slope (at least 0.01 for pipes with a diameter of up to 50 mm and 0.005 for pipes with a diameter of 50 mm or more);

condition of pipeline fastenings;

no touching of electrical wires and cables;

condition of painting, absence of dirt and dust.

Deficiencies found that could affect the reliability of the installation must be eliminated immediately.

5.6.2. The pressure pipeline must be in constant readiness for action, i.e. filled with water and under operating pressure.

5.7. Control units and valves

5.7.1. For automatic installation of water fire extinguishing of transformers and cable structures in shut-off and starting devices, steel fittings, electrified valves with automatic start, grade 30s 941nzh, should be used; 30s 986nzh; 30s 996nzh with a working pressure of 1.6 MPa, repair gate valves with a manual drive of the brand 30s 41nzh with a working pressure of 1.6 MPa.

5.7.2. The condition of the control units and shut-off valves, the presence of a seal, the pressure values ​​before and after the control units, must be monitored at least once a month.

5.7.3. An inspection should be carried out once every six months. electrical circuit operation of the control unit with its automatic activation from a fire detector when the valve is closed.

5.7.4. The installation site of the control unit must be well lit, the inscriptions on pipelines or special stencils (node ​​number, protected area, type of sprinklers and their number) must be made with indelible bright paint and be clearly visible.

5.7.5. All damage to valves, valves and check valves, which may affect the reliability of the fire extinguishing installation, must be eliminated immediately.

5.8. Sprinklers

5.8.1. As water sprinklers for automatic fire extinguishing transformers, sprinklers OPDR-15 are used with a working water pressure in front of the sprinklers in the range of 0.2-0.6 MPa; for automatic fire extinguishing of cable structures, sprinklers DV, DVM with a working pressure of 0.2-0.4 MPa are used.

5.8.2. When inspecting switchgear equipment, but at least once a month, sprinklers should be inspected and cleaned of dust and dirt. If a defect or corrosion is found, corrective action must be taken.

5.8.3. When carrying out repair work, sprinklers must be protected from getting plaster and paint on them (for example, with polyethylene or paper caps, etc.). Traces of paint and mortar found after repair must be removed.

5.8.5. To replace faulty or damaged sprinklers, a reserve of 10-15% of the total number of installed sprinklers should be created.

5.9. Pneumatic tank and compressor

5.9.1. The inclusion of a pneumatic tank in operation should be carried out in the following sequence:

fill the pneumatic tank with water to about 50% of its volume (control the level on the water gauge glass);

turn on the compressor or open the valve on the compressed air pipeline;

raise the pressure in the air tank to the working one (controlled by a pressure gauge), after which the air tank is connected to the pressure pipeline, creating a working pressure in it.

5.9.2. Every day, an external inspection of the air tank should be carried out, the water level and air pressure in the air tank should be checked. When the air pressure drops by 0.05 MPa (relative to the working one), it is pumped up.

Once a week, the compressor is tested at idle.

5.9.3. Maintenance of the air tank and compressor, carried out once a year, includes:

Emptying, inspecting and cleaning the air tank;
- removal and testing on the stand safety valve(in case of malfunction, replace with a new one);
- painting of the surface of the air tank (indicate the date of repair on the surface);
- detailed inspection of the compressor (replace worn parts and fittings);
- fulfillment of all other technical requirements provided by factory passports and operating instructions for the air tank and compressor.

5.9.4. Switching off the pneumatic tank from the fire extinguishing installation circuit is prohibited.

5.9.5. The inspection of the pneumatic tank is carried out by a special commission with the participation of representatives of the State Gortekhnadzor, local authorities of the State Fire Supervision and this energy company.

Note. The compressor must only be started manually. In this case, it is necessary to monitor the level in the pneumatic tank, since when automatic switching on compressor, it is possible to squeeze out water from the pneumatic tank and even from the network with air.

5.10. Pressure gauges

5.10.1. The correctness of the indications of the operation of pressure gauges installed on pneumatic tanks should be checked once a month, installed on pipelines - once every six months.

5.10.2. Full check at the fire extinguishing installation, all pressure gauges with their sealing or branding must be carried out annually in accordance with the current regulation.

6. ORGANIZATION AND REQUIREMENTS FOR REPAIR WORK ON OPERATION OF AUTOMATIC WATER FIRE EXTINGUISHING INSTALLATIONS

6.1. During the repair of the technological equipment of the fire extinguishing installation, one should, first of all, be guided by the requirements of the passport, the instructions of the plant for the operation of specific equipment, the requirements of the relevant standards and specifications, as well as the requirements of this Model Instruction.

6.2. When replacing a pipeline section at a bend, the minimum radius of the internal bend curve steel pipes should be at least four outer diameters when bent in a cold state, and at least three in a hot state.

There should be no folds, cracks or other defects on the bent part of the pipe. Ovality in the places of bending is allowed no more than 10% (determined by the ratio of the difference between the largest and smallest outer diameters of the bent pipe to the outer diameter of the pipe before bending).

6.3. The difference in wall thickness and displacement of the edges of the joined pipes and pipeline parts should not exceed 10% of the wall thickness and should not exceed 3 mm. .

6.4. The edges of the pipe ends to be welded and the surfaces adjacent to them must be cleaned of rust and dirt to a width of at least 20 mm before welding.

6.5. Welding of each joint must be carried out without interruption until the entire joint is completely welded.

6.6. A welded pipe joint should be rejected if the following defects are found:

cracks emerging on the surface of the seam or the base metal in the welding zone;

sags or undercuts in the transition zone from the base metal to the deposited;

burns;

unevenness of the weld in width and height, as well as its deviations from the axis.

6.7. In particular damp rooms with a chemically active environment, the pipeline fastening structures must be made of steel profiles with a thickness of at least 4 mm. Piping and fastening structures must be covered protective varnish or paint.

6.8. Pipeline connections for open laying should be located outside walls, partitions, ceilings and other building structures of buildings.

6.9. Fastening pipelines to building structures buildings should be made with normalized supports and hangers. Welding pipelines directly to metal structures buildings and structures, as well as elements of technological equipment is not allowed.

6.10. Welding of supports and hangers to building structures should be carried out without weakening their mechanical strength.

6.11. Sag and bending of pipelines are not allowed.

6.12. Each bend of the pipeline with a length of more than 0.5 m must be fastened. The distance from hangers to welded and threaded pipe joints must be at least 100 mm.

6.13. Newly installed sprinklers must be cleaned of preservative grease and tested with a hydraulic pressure of 1.25 MPa (12.5 kgf/cm2) for 1 min.

The average service life of sprinklers is determined to be at least 10 years.

Operating instructions for fire extinguishing systems, APS, SOUE based on PPKOP "Korund 1I"

I approve

______________________________________________________

INSTRUCTIONS

for the operation of fire extinguishing systems, fire alarms and warning people about a fire at: _______________________________________________________________

PPKOP "Korund 1I"

  1. 1. A common part.
  2. 2. The fire alarm system is designed to detect and alert about the occurrence of a fire.

2.1. The system must be in standby mode around the clock.

3. Responsibilities of the shift supervisor to maintain the substation installation in working condition.

3.1. The shift supervisor is obliged to conduct an external inspection of all protected premises for damage. installed equipment and appliances.

3.2. Monitor all malfunctions and operation of the system, report them to the head of the unit and the guard on duty at the checkpoint.

4. System operation during a fire.

Actions of the shift supervisor when the control panel "Korund 1 I" is triggered

On the front panel of the device there are light (red and yellow color) status indicators of alarm loops from 1 to 4 are not glowing LEDs correspond to the on state of the alarm loops, the power indicator " NET» backup power indicator « RESERVE» red 1 to 4 states « FIRE» plume.

Control buttons: " NET» switching on the 220 V power supply and the backup power supply direct current 24 V, toggle switches for disabling alarm loops from 1 to 4 button " CONTROL» to check the instrument in the « SELF CONTROL", button " SOUND» to turn off the sound signal, buttons, button « RESET» to restore the state of the loops after triggering. Toggle switches for turning off (turning on loops) and toggle switches for turning off (turning on) ASPT systems are closed with a protective casing.

When the devices are working properly and the fire alarm loops are working properly, LEDs 1 to 4 on the linear blocks and on the device panel are in the off state, the LED is on in green, the reserve LED is on.

In the event of a fault in the loop (or several loops), the yellow LED " MALFUNCTION» on the relevant linear unit and on the instrument panel. The instrument generates a characteristic intermittent fault signal on the instrument panel.

AT this case disable the button SOUND”, open the protective casing of the linear units, turn off the toggle switch of the corresponding loop, press the button “ RESET» to restore the “standby” state of the device, make a record of the time of the malfunction and record the number of the faulty loop in the operational log, report to the management and call the representatives of the organization providing maintenance of the alarm system.

If the device is triggered by fire detectors in the " FIRE”, the red LED “ FIRE» of the corresponding loop(s), a characteristic continuous sound signal sounds on the device, a remote sound annunciator in the corridor turns on. In this case, turn off the sound signal of the device (the button on the panel " SOUND”) to check the premises of the corresponding loop for the absence of signs of burning, in case of confirmation of the event “ FIRE» call the fire brigade on tel. 01 and, as far as possible, take measures to extinguish the fire with the available fire extinguishing equipment.

At the same time, report to the head of the unit and call the checkpoint, inform the security guard on duty about the fire.

When false positive: open the protective cover of the linear units, turn off the toggle switch of the corresponding loop, press the button " RESET» to restore the "standby" state of the device, make a record of the time of the malfunction and record the number of the faulty loop in the operational log, report to the head of the unit and call the representatives of the organization providing maintenance of the alarm system.

In case of disconnection of the main power supply of the device, the backup power of the device remains on, which will be signaled by the red LED " RESERVE". After restoring the main power to the device, call a representative of the service organization to check and recharge, if necessary, the battery.

About the serviceability of the backup power supply and acc. batteries are signaled by LEDs " NET» red and « ACC. BAT." green on backup source nutrition.