INSTRUCTIONS
ABOUT THE ACTIONS OF EMPLOYEES IN THE PREMISES,
EQUIPPED WITH AUTOMATIC UNITS
POWDER (GAS) FIRE EXTINGUISHING

1 Before starting work, the employee must:

1.1 Approaching the door, pay attention to the presence or absence of above front door light signal "Powder (Gas) - do not enter!".

1.1.1 No signal - switch the unit from automatic mode to automatic mode disabled (see the unit operating instructions).
1.1.2 Enter the premises and start work.

1.2 The signal is on - without entering the room, immediately inform the security personnel, the person in charge or the duty officer for the operation of engineering systems, personally or by phone.

2 During operation.

2.1 The first person who detects a fire or signs of combustion (flame, burning, burning smell) is obliged.
2.1.1 Immediately inform the security officer on duty on the internal phone and the city phone number "01" or "112" for the fire guard, indicate the address of the facility, the place where the fire occurred and give your name.
2.1.2 Proceed (if possible) to extinguish the fire with a portable fire extinguisher.
2.1.3 If it is impossible to extinguish the fire with a portable fire extinguisher, immediately leave the premises.
2.2 If the sound and light signaling“Powder (Gas) - go away!”, The employee is obliged to close windows, doors and leave the premises within no more than 30 seconds.
2.2.1 Make sure that all workers have left the premises.
2.2.2 Close the front door tightly.

2.2.3 Break the seal on the PDP (Remote start). Activate the fire extinguishing system by launching the "START" button.

3 At the end of the working day, the employee who closes the premises is obliged:

3.1 Check if the windows are closed; turn off the lights; leave the room and close the front door tightly.
3.2 Transfer the installation to "automatic mode".
3.3 Make sure that the unit is in "automatic mode".

4 Procedure for switching on the unit with a manual call point or with a PDP (Remote start panel).

4.1 The first person who detects a fire or signs of combustion (flame, burning, burning smell) is obliged.
4.2 Check if the windows are closed and if all workers have left the premises.
4.3 Leave the room and close the front door tightly.

4.4 Pull the lever of the manual call point protective glass and press the button) or RAP. After 30 seconds, a gas (powder) fire extinguishing composition will be released into the room.

5 Safety requirements.

5.1 It is allowed to enter the protected area after the release of the extinguishing agent into it and the extinguishing of the fire until the end of ventilation is allowed only in insulating respiratory protection.
5.2 Entering the room without insulating respiratory protection is allowed only after the combustion products have been removed and the gas extinguishing agent has decomposed or the powder dust has settled to a safe level.
5.3 ATTENTION! All signals and actions of the operational duty officer (security service) must be recorded in the technical condition log of the installation. fire automatics with indication of time, date, full name and signature. In the event of a fire detection, actuation of fire automatics or detection of any malfunction of fire automatics, the duty personnel (security services, dispatcher) must immediately report:
- responsible for the operation of engineering equipment and fire-fighting systems.

RUSSIAN JOINT STOCKSOCIETYENERGY
AND
ELECTRIFICATIONS « EECRUSSIA»

DEPARTMENTSCIENCESANDTECHNIQUES

TYPICALINSTRUCTIONS
ON
OPERATIONAUTOMATIC
INSTALLATIONS
WATERFIRE FIGHTING

RD 34.49.501-95

ORGRES

Moscow 1996

Designed by Joint-stock company "Firm for adjustment, improvement of technology and operation of power plants and networks" ORGRES ".

Performers YES. A. N. ZAMYSLOV Ivanov, A.S. V. M. KOZLOV STARIKOV

Agreed with the Department of the General Inspection for the Operation of Power Plants and Grids of RAO "UES of Russia" on December 28, 1995

Head N.F. Gorev

Head A.P. BERSENEV

STANDARD OPERATING INSTRUCTIONS FOR AUTOMATIC WATER EXTINGUISHING UNITS

RD 34.49.501-95

Expiration date set

from 01.01.97

In the present Typical instructions the basic requirements for the operation of the technological equipment of water fire extinguishing installations used at energy enterprises are given, and the procedure for flushing and pressure testing of pipelines of fire extinguishing installations is also outlined. The scope and sequence of monitoring the state of technological equipment, the timing of the audit of all equipment of fire extinguishing installations are indicated, and basic recommendations for troubleshooting are given.

Responsibility for the operation of fire extinguishing installations has been established, the necessary working documentation and requirements for personnel training have been provided.

The main safety requirements for the operation of fire extinguishing installations are indicated.

The forms of acts of flushing and pressure testing of pipelines and conducting fire tests are given.

With the release of this Model Instruction, the “Typical instruction for the operation of automatic fire extinguishing installations: TI 34-00-046-85” (Moscow: SPO Soyuztekhenergo, 1985) is no longer valid.

1. INTRODUCTION

1.1. The standard instruction establishes the requirements for the operation of technological equipment for water fire extinguishing installations and is mandatory for managers of power companies, shop managers and persons appointed responsible for the operation of fire extinguishing installations.

1.2. Technical requirements for the operation of technological equipment of installations foam fire extinguishing are set out in the "Instructions for the operation of fire extinguishing installations using air-mechanical foam" (Moscow: SPO ORGRES, 1997).

1.3. When operating a fire alarm of an automatic fire extinguishing system (AUP), one should be guided by the "Standard instruction for the operation of automatic fire alarm systems at power enterprises" (Moscow: SPO ORGRES, 1996).

The following abbreviations are adopted in this Model Instructions.

UVP - installation of water fire extinguishing,

AUP - automatic fire extinguishing installation,

AUVP - automatic water fire extinguishing installation,

PPS - fire alarm panel,

PUEZ - control panel for electric valves,

PUPN - fire pump control panel,

PI - fire detector,

PN - fire pump,

OK - check valve,

DV - water drencher,

DVM - modernized water drencher,

OPDR - foam-drencher sprinkler.

2. GENERAL INSTRUCTIONS

2.1. Based on this Model Instruction, the organization that performed the adjustment of the AUP technological equipment, together with the power company where this equipment is installed, must develop a local operating manual for the technological equipment and AUP devices. If the adjustment was carried out by an energy enterprise, then the instructions are developed by the personnel of this enterprise. The local instruction must be developed at least one month before the AUP is put into operation.

2.2. The local instructions must take into account the requirements of this Model instruction and the requirements of factory passports and instructions for the operation of equipment, instruments and apparatus that are part of the AUVP. Reduction of the requirements set forth in these documents is not allowed.

2.3. The local instruction must be revised at least once every three years and every time after the reconstruction of the AUP or in case of a change in operating conditions.

2.4. Acceptance of AUP into operation should be carried out by representatives of:

energy companies (chairman);

design, installation and commissioning organizations;

state fire supervision.

The commission's work program and acceptance certificate must be approved by the chief technical manager of the enterprise.

3. SAFETY MEASURES

3.1. When operating the technological equipment of water fire extinguishing installations, the personnel of power companies must comply with the relevant safety requirements specified in the PTE, PTB, as well as in the factory passports and operating instructions for specific equipment.

3.2. During the maintenance and repair of the AUP, when visiting the premises protected by the AUP, the automatic control of a particular distribution pipeline in this direction should be switched to manual (remote) until the last person leaves the room.

3.3. Pressure testing of pipelines with water should be carried out only according to an approved program, which should include measures to ensure the protection of personnel from a possible rupture of pipelines. It is necessary to provide complete removal air from pipelines. It is prohibited to combine crimping work with other work in the same room. If the pressure testing is carried out by contractors, then the work is carried out according to the permit. The performance of these works by the operational or repair personnel of the power company is documented in a written order.

3.4. Before starting work, personnel involved in pressure testing must be instructed in workplace safety.

3.5. During crimping, no unauthorized persons should be in the room. Pressure testing must be carried out under the supervision of a responsible person.

3.6. Repair work on the technological equipment should be carried out after the pressure is removed from this equipment and the preparation of the necessary organizational and technical measures established by the existing PTB.

4. PREPARATION FOR WORK AND CHECKING THE TECHNICAL CONDITION OF THE FIRE EXTINGUISHING UNIT

4.1. The water fire extinguishing installation consists of:

source of water supply (reservoir, reservoir, city water supply, etc.);

fire pumps (designed for the intake and supply of water to pressure pipelines);

suction pipelines (connecting the water source with fire pumps);

pressure pipelines (from the pump to the control unit);

distribution pipelines (laid within the protected premises);

control units installed at the end of pressure pipelines;

sprinklers.

In addition to the above, based on design solutions, the following can be included in the fire extinguishing installations scheme:

water tank for filling fire pumps;

pneumatic tank for maintaining constant pressure in the network of the fire extinguishing installation;

a compressor for feeding the pneumatic tank with air;

drain taps;

check valves;

dosage washers;

pressure switch;

manometers;

vacuum gauges;

level gauges for measuring the level in tanks and a pneumatic tank;

other signaling, control and automation devices.

The schematic diagram of the water fire extinguishing installation is shown in the figure.

4.2. After the completion of the installation work, the suction, pressure and distribution pipelines must be flushed and subjected to hydraulic tests. The results of flushing and pressure testing must be documented in acts (attachments and).

If possible, the effectiveness of the fire extinguishing installation should be checked by organizing the extinguishing of an artificial fire source (appendix).

4.3. When flushing pipelines, water should be supplied from their ends towards the control units (in order to prevent clogging of pipes with a smaller diameter) at a speed 15 - 20% higher than the speed of water in a fire (determined by calculation or recommendations of design organizations). Flushing should be continued until clean water is consistently produced.

If it is impossible to flush individual sections of pipelines, it is allowed to blow them with dry, clean, compressed air or inert gas.

Schematic diagram of a water fire extinguishing installation:

1 - water storage tank; 2 - fire pump (PN) with electric drive; 3 - pressure pipeline; 4 - suction pipeline; 5 - distribution pipeline; 6 - fire detector (PI); 7 - control unit; 8 - manometer; 9 - check valve (OK)

Note. The standby fire pump with fittings is not shown.

4.4. Hydraulic testing of pipelines must be carried out under a pressure equal to 1.25 working pressure (P), but not less than P + 0.3 MPa, for 10 minutes.

To disconnect the tested section from the rest of the network, it is necessary to install blind flanges or plugs. It is not allowed to use existing control units, repair valves, etc. for this purpose.

After 10 minutes of testing, the pressure should be gradually reduced to working pressure and a thorough inspection of all welded joints and adjacent areas should be performed.

The pipeline network is considered to have passed the hydraulic test if no signs of rupture, leaks and drops in welded joints and on the base metal, visible permanent deformations are found.

The pressure should be measured with two pressure gauges.

4.5. Flushing and hydraulic testing of pipelines should be carried out under conditions that exclude their freezing.

It is prohibited to backfill open trenches with pipelines exposed to severe frosts, or backfill such trenches with frozen soil.

4.6. Automatic water fire extinguishing installations must operate in the automatic start mode. For the period when personnel are in cable facilities (bypass, repair work, etc.), the start-up of installations should be switched to manual (remote) switching (p.).

5. MAINTENANCE OF FIRE EXTINGUISHING UNITS

5.1 ... Organizational activities

5.1.1. Persons responsible for the operation, overhaul and current repairs of the technological equipment of the fire extinguishing installation are appointed by the head of the energy company, who also approves the schedules for technical supervision and equipment repair.

5.1.2. The person responsible for the constant readiness of the technological equipment of the fire extinguishing installation must know well the principle of the device and the procedure for the operation of this equipment, and also have the following documentation:

project with changes made during the installation and commissioning of the fire extinguishing installation;

factory passports and operating instructions for equipment and devices;

this Model Instruction and local operating instructions for process equipment;

acts and protocols of installation and commissioning works, as well as testing of technological equipment;

schedules of maintenance and repair of technological equipment;

"Log book for the maintenance and repair of the fire extinguishing installation."

5.1.3. Any deviations from the scheme adopted by the project, replacement of equipment, additional installation sprinklers or their replacement by sprinklers with a large nozzle diameter must be previously agreed with the design institute - the author of the project.

5.1.4. To monitor the technical condition of the technological equipment of the fire extinguishing installation, a "Register of maintenance and repair of the fire extinguishing installation" should be kept, which should record the date and time of the inspection, who carried out the inspection, the detected faults, their nature and time of their elimination, the time of forced shutdown and activation fire extinguishing installations, carried out by testing the operation of the entire installation or individual equipment. The approximate form of the journal is given in the appendix.

At least once a quarter, the chief technical manager of the enterprise must familiarize himself with the contents of the journal on receipt.

5.1.5. To check the readiness and efficiency of the AUVP, a complete audit of the technological equipment of this installation should be carried out once every three years.

During the audit, in addition to the main work, pressure testing of the pressure pipeline is carried out and flushing (or purging) and pressure testing of distribution pipelines (pp. -) are carried out in two or three directions, which are in the most aggressive environment (dampness, gas pollution, dust).

If deficiencies are found, it is necessary to develop measures to ensure their complete elimination in a short time.

5.1.6. An automatic fire extinguishing installation in accordance with the schedule approved by the head of the relevant workshop, but at least once every three years, must be tested (tested) according to a specially developed program with the actual start-up of them, provided that this does not entail a shutdown of the technological equipment or all the production process. During testing on the first and last sprinklers, the water pressure and irrigation intensity should be checked.

Testing should be carried out for 1.5 - 2 minutes with the inclusion of serviceable drainage devices.

Based on the results of testing, an act or protocol must be drawn up, and the fact of testing itself must be registered in the "Journal of maintenance and repair of the fire extinguishing installation".

5.1.7. Checking the operation of AUVP or certain types of equipment should be carried out during the withdrawal for repair, maintenance of the protected premises and the technological unit.

5.1.8. For storage of spare equipment, equipment parts, as well as fixtures, tools, materials, devices necessary for the control and organization of repair work of AUVP, a special room should be allocated.

5.1.9. The technical capabilities of AUVP should be included in the operational plan for extinguishing a fire at a given power plant. During firefighting trainings, it is necessary to expand the circle of personnel who know the purpose and device of the AUVP, as well as the procedure for activating it.

5.1.10. The personnel servicing the AUVP compressors and pneumatic tanks must be trained and certified in accordance with the requirements of the Gosgortekhnadzor rules.

5.1.11. The person responsible for the operation of the technological equipment of the fire extinguishing installation must organize training with personnel assigned to control the operation and maintenance of this equipment.

5.1.12. In room pumping station AUVP should be posted: instructions on how to turn on the pumps and open valves, as well as conceptual and technological diagrams.

5.2 ... Technical requirements for AUVP

5.2.1. The entrances to the building (room) of the pumping station and the fire extinguishing installation, as well as the approaches to the pumps, pneumatic tank, compressor, control units, pressure gauges and other equipment of the fire extinguishing installation, must always be free.

5.2.2. On an operating fire extinguishing installation, the following must be sealed in working position:

hatches of reservoirs and tanks for storing water supplies;

control units, gate valves and manual cranes;

pressure switch;

drain taps.

5.2.3. After the fire extinguishing installation has been triggered, its operability must be fully restored no later than 24 hours later.

5.3 ... Water storage tanks

5.3.1. Checking the water level in the tank should be carried out daily with registration in the "Log book of maintenance and repair of the fire extinguishing installation".

If the water level drops due to vapors, it is necessary to add water, if there are leaks, locate the damage to the reservoir and repair the leaks.

5.3.2. The correct operation of the automatic level gauge in the tank should be checked at least once every three months at positive temperatures, monthly - at negative temperatures and immediately in case of doubts about the correct operation of the level gauge.

5.3.3. The tanks must be closed for unauthorized access and sealed, the integrity of the seal is checked during the inspection of the equipment, but at least once a quarter.

5.3.4. The water in the tank should not contain mechanical impurities that could clog pipelines, metering washers and sprinklers.

5.3.5. To prevent decay and blooming of water, it is recommended to disinfect it with bleach at the rate of 100 g of lime per 1 m3 of water.

5.3.6. It is necessary to change the water in the tank annually in the fall. When changing the water, the bottom and inner walls of the tank are cleaned of dirt and build-up, the damaged paint is restored or completely renewed.

5.3.7. Before the onset of frost near buried tanks, the gap between the upper and lower hatch covers must be filled with insulating material.

5.4 ... Suction pipeline

5.4.1. Once a quarter, the condition of the bushings, shut-off valves, measuring instruments and the water intake well is checked.

5.4.2. Before the onset of frost, the fittings in the water intake well must be inspected, repaired if necessary, and the well must be insulated.

5.5 ... Pumping station

5.5.1. Before testing the pumps it is necessary to check: the tightening of the oil seals; the level of lubrication in the bearing tubs; correct tightening of foundation bolts, pump cover nuts and bearings; suction-side piping connections and the pumps themselves.

5.5.2. Once a month, pumps and other equipment of the pumping station should be inspected, cleaned of dust and dirt.

5.5.3. Each fire pump must be turned on at least twice a month to create the required pressure, which is recorded in the operational log.

5.5.4. At least once a month, the reliability of the transfer of all fire pumps to the main and reserve power supply should be checked with the registration of the results in the operational log.

5.5.5. If there is a special tank for filling the pumps with water, the latter must be inspected and painted annually.

5.5.6. Once every three years, pumps and motors according to p. of this Model Instruction must undergo an audit, during which all existing deficiencies are eliminated.

Repair and replacement of worn out parts, check of oil seals are carried out as needed.

5.5.7. The pumping station must be kept clean. In the absence of duty, it must be locked. One of the spare keys must be kept on the control panel, which must be indicated on the door.

5.6 ... Pressure and distribution pipelines

5.6.1. Once a quarter, it is necessary to check:

absence of leaks and deflections of pipelines;

the presence of a constant slope (not less than 0.01 for pipes with a diameter of up to 50 mm and 0.005 for pipes with a diameter of 50 mm and more);

condition of pipeline fasteners;

lack of contact with electric wires and cables;

condition of painting, absence of dirt and dust.

Discovered deficiencies that could affect the reliability of the installation should be eliminated immediately.

5.6.2. The pressure pipeline must be always ready for action, i.e. filled with water and under operating pressure.

5.7 ... Control units and valves

5.7.1. For AUVP transformers and cable structures in locking and starting devices, steel reinforcement electrified gate valves with automatic start of grade 30s 941nzh should be used; 30s 986nzh; 30s 996nzh with a working pressure of 1.6 MPa, repair valves with a manual drive brand 30s 41nzh with a working pressure of 1.6 MPa.

5.7.2. The state of the control units and valves, the presence of a seal, the pressure values ​​before and after the control units must be monitored at least once a month.

5.7.3. An inspection should be carried out once every six months electrical circuit actuation of the control unit with its automatic activation from the fire detector when the valve is closed.

5.7.4. The installation site of the control unit should be well lit, inscriptions on pipelines or special stencils (unit number, protected area, type of sprinklers and their number) should be made with indelible bright paint and clearly visible.

5.7.5. Any damage to valves, valves and non-return valves that could affect the reliability of the fire extinguishing installation must be repaired immediately.

5.8 ... Sprinklers

5.8.1. As water sprinklers for automatic fire extinguishing of transformers, sprinklers OPDR-15 are used with a working water pressure in front of the sprinklers in the range of 0.2 - 0.6 MPa; for automatic fire extinguishing of cable structures, sprinklers DV, DVM with a working pressure of 0.2 - 0.4 MPa are used.

5.8.2. When inspecting switchgear equipment, but at least once a month, the sprinklers must be inspected and cleaned of dust and dirt. If a malfunction or corrosion is detected, measures must be taken to eliminate them.

5.8.3. During repair work, sprinklers must be protected from plaster and paint (for example, plastic or paper caps, etc.). Traces of paint and mortar found after repair must be removed.

5.8.5. To replace faulty or damaged sprinklers, a reserve of 10-15% of the total number of installed sprinklers must be created.

5.9 ... Pneumatic tank and compressor

5.9.1. The inclusion of the pneumatic tank in operation should be carried out in the following sequence:

fill the pneumatic tank with water to about 50% of its volume (control the level on the water gauge glass);

turn on the compressor or open the valve on the compressed air line;

raise the pressure in the pneumatic tank to the working pressure (controlled by the pressure gauge), then connect the pneumatic tank to the pressure pipeline, creating a working pressure in it.

5.9.2. An external inspection of the pneumatic tank should be carried out daily, check the water level and air pressure in the pneumatic tank. When the air pressure drops by 0.05 MPa (in relation to the working one), it is pumped up.

The compressor is tested at idle speed once a week.

5.9.3. Maintenance of the pneumatic tank and compressor, carried out once a year, includes:

emptying, inspecting and cleaning the pneumatic tank:

removal and check at the stand safety valve(in case of malfunction, replace with a new one);

painting of the surface of the pneumatic tank (indicate the date of repair on the surface);

detailed inspection of the compressor (replace worn parts and fittings);

fulfillment of all other technical requirements stipulated by the factory passports and operating instructions for the pneumatic tank and compressor.

5.9.4. It is prohibited to turn off the pneumatic tank from the fire extinguishing installation diagram.

5.9.5. The inspection of the pneumatic tank is carried out by a special commission with the participation of representatives of the Gosgortekhnadzor, local authorities of the State Fire Supervision and this energy company.

Note. The compressor should only be started up manually. In this case, it is necessary to monitor the level in the pneumatic tank, since when automatic switching on compressor, it is possible for air to squeeze out water from the pneumatic tank and even from the network.

5.10 ... Pressure gauges

5.10.1. The correctness of the readings of the pressure gauges installed on the pneumatic tanks should be checked once a month, installed on the pipelines - once every six months.

5.10.2. Full check at the fire extinguishing installation, all pressure gauges with their sealing or stamping must be carried out annually in accordance with the current regulation.

6. ORGANIZATION AND REQUIREMENTS FOR REPAIR WORKS

6.1. During the repair of the technological equipment of the fire extinguishing installation, one should, first of all, be guided by the requirements of the passport, the instructions of the plant for the operation of specific equipment, the requirements of the relevant standards and technical conditions, as well as the requirements of this Model Instruction.

6.2. When replacing a section of a pipeline on a bend, the minimum radius of the inner bend curve steel pipes when bending them in a cold state, it should be at least four outer diameters, in a hot state - at least three.

The bent part of the pipe must be free of folds, cracks or other defects. Ovality at bending points is allowed no more than 10% (determined by the ratio of the difference between the largest and smallest outer diameters of the bent pipe to the outer diameter of the pipe before the bend).

6.3. The difference in wall thickness and displacement of the edges of abutting pipes and pipeline parts should not exceed 10% of the wall thickness and should not be more than 3 mm.

6.4. Before welding, the edges of the pipe ends to be welded and the surfaces adjacent to them must be cleaned of rust and dirt to a width of at least 20 mm.

6.5. Welding of each joint must be performed without interruption until the entire joint is fully welded.

6.6. The welded joint of pipes should be rejected if the following defects are found:

cracks emerging on the surface of the seam or base metal in the welding zone;

sagging or undercuts in the zone of transition from base metal to deposited metal;

burn-throughs;

unevenness of the weld in width and height, as well as its deviations from the axis.

6.7. In especially damp rooms with a chemically active environment, the pipe fastening structures must be made of steel profiles with a thickness of at least 4 mm. Pipelines and fastening structures must be coated with protective varnish or paint.

6.8. Pipeline connections for open installation should be located outside walls, partitions, ceilings and other building structures of buildings.

6.9. Fastening of pipelines to building structures of buildings should be carried out with normalized supports and hangers. Welding of pipelines directly to metal structures buildings and structures, as well as elements of technological equipment are not allowed.

6.10. Welding of supports and hangers to building structures should be carried out without weakening their mechanical strength.

6.11. Sagging and bending of pipelines are not allowed.

6.12. Each pipe bend over 0.5 m in length must be secured. The distance from the hangers to the welded and threaded pipe joints must be at least 100 mm.

6.13. Newly installed sprinklers must be cleaned of preservative grease and checked with a hydraulic pressure of 1.25 MPa (12.5 kgf / cm2) for 1 minute.

The average service life of sprinklers is determined at least 10 years.

6.14. The performance of the sprinklers DV, DVM and OPDR-15 is given in table. ...

Table 1

Outlet diameter, mm

Sprinkler capacity, l / s, at pressure MPa

DV-10 and DVM-10

table 2

Probable causes

Water does not come out of the sprinklers, the pressure gauge shows normal pressure

Valve closed

Open the latch

Check valve stuck

Open the non-return valve

Clogged pipeline

Clean pipeline

Sprinklers are clogged

Eliminate clogging

Water does not come out of the sprinklers, the pressure gauge does not show pressure

The fire pump did not start working

Turn on the fire pump

The valve on the pipeline on the suction side of the fire pump is closed

Open the latch

Air is leaking on the suction side of the fire pump

Troubleshoot connection problems

Wrong direction of rotation of the rotor

Switch motor phases

The valve in the other direction is accidentally open

Close the valve in the other direction

Leakage of water through welded seams, at the points of connection of control units and sprinklers

Poor welding

Check the quality of welds

Gasket worn out

Replace the gasket

Tightening bolts loosened

Tighten the bolts

_________________________________________________________________________

and _______________________________________________________________________

_________________________________________________________________________

made this act in that the pipelines _____________________________

_________________________________________________________________________

(unit name, section no.)

Special Notes: ___________: ____________________________________________

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________

Commission members:

(surname) (signature)

Mounting

(surname) (signature)

Fire department

(power plant, substation)

We, the undersigned members of the Commission, composed of:

1. From the customer _____________________________________________________________

(representative from the customer, full name, position)

2. From the installation (commissioning) organization _____________________________________

___________________________________________________________________________

(representative from the installation organization, full name, position)

3. From the fire department ______________________________________________________

___________________________________________________________________________

(representative from the fire department, full name, position)

4. _________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

drew up this act in that fire tests were carried out in

___________________________________________________________________________

(name of the tested area)

Artificial fires with a size of ____________________________ m2 with combustible material ________________________________________________________________

As a result of the test, the time was established:

setting fire to the fire ___________________________________________ (h, min)

operation of the installation _________________________________________ (h, min)

appearance of water from the foam generator ________________________________ (h, min)

During the firing tests, the installation worked, the room is full

foam for _______________ min

Commission members:

Customer _________________________ _____________________

(surname) (signature)

Mounting

organization _________________________ _____________________

(surname) (signature)

Fire department

security _________________________ _____________________

(surname, position) (signature)

The main governing document when developing measures for the operation of APPZ installations are: PPB RB 1.02-94 "Industrial safety rules for the operation of technical means of fire protection".

The list of organizational measures, first of all, includes the development of documentation at the protected object that determines the procedure for the operation of APPS facilities, functional responsibilities maintenance and operational personnel, as well as the organization of control over their implementation. The complex of organizational measures also includes the development and maintenance of operational documentation for the funds of the APPZ.

The facility must have the following documentation:

design documentation and as-built drawings for the installation;

certificate of acceptance and commissioning of the installation;

passports for equipment and devices;

list of mounted equipment, assemblies, instruments and automation equipment;

installation operating instructions;

a list of regulated works on the maintenance of installations;

maintenance schedule;

register of works on maintenance and repair of installations;

duty schedule of operational (duty) personnel;

a log of the delivery and acceptance of duty by operational personnel;

plant malfunction log;

job descriptions.

By order of the head of the facility, the following must be appointed:

the person responsible for the operation of the UPA;

service personnel for the maintenance of the UPA;

operational (duty personnel)

The person responsible for the operation of the UPA is obliged to ensure:

maintaining the UPA in working order - performing maintenance daily, weekly, monthly, once every 3 months, once every six months, once a year, once every 3.5 years;

control over timely and high-quality service and scheduled preventive maintenance;

training of service and operational personnel and systematic control over the development, maintenance of operational documentation;

informing about cases of triggering;

General rules for technical content

The operating conditions of automatic water and foam fire extinguishing installations must meet the requirements of GOST 12.4.009-83, PPB of the Republic of Belarus when operating technical means of fire protection, technical specifications equipment. During the operation of the installations, the presence of the required water pressure in the systems of the main water supply is monitored. as well as for the presence of a standard reserve of a foaming agent or a foaming agent solution in spare tanks of foam fire extinguishing installations.

In the premises of the oil storage, the air temperature must be at least 5 ° C and not more than 20 ° C.

The floors, stairs and platforms of the station premises of fire extinguishing installations should be kept clean and serviceable. The keys to the station room must be kept by the personnel on duty.

When caring for automatic water feeders, it is necessary to monitor the level and purity of the water in the water tank or hydraulic tank.

In areas with a harsh climate, the presence and condition of heating of water-pressure and hydropneumatic tanks is monitored.

In hydropneumatic installations, the air pressure in the system and the water level are monitored. When starting the compressor, you must first make sure that it is working properly. During trial tests of the compressor Special attention refers to the temperature of the lubricating oil, bearings and other rubbing joints.

Due to the high corrosiveness of some types of foaming agents, additional monitoring of the good condition requires devices for preparing a foaming solution.

After testing the functionality, or after extinguishing the fire, the metering devices of the foam fire extinguishing installations are thoroughly rinsed with clean water.

During operation, the control panel is constantly inspected (the state of the relay, input starters, buttons, switches). Unarmoured cables. inserted into small-sized shields, from below are protected from mechanical damage. Monitoring of the serviceability of the light and sound signaling about the presence of voltage on the feeders and about the disappearance of voltage on the control and signaling circuit boards is carried out.

Fire extinguishing installations start devices are sealed and protected from accidental start-up and mechanical damage.

At each control unit, signs are posted indicating the name of the protected premises, the type and number of sprinklers in the section.

In air systems, the air pressure should be 25% of the water pressure. In water systems, the pressure above the control and signal valve (KSK) should not exceed the pressure under the KSK in the presence of an automatic pump by 0.05 MPa (0.5 kgf / cm "), in other cases - by 0.03 MPa (0.3 kgf / cm2) The main gate valve in front of KSK, KGD, taps on the stimulating pipeline, taps to pressure gauges, valves of the dosing device (foam installations) are constantly kept open.

Not allowed: use of pipes of fire extinguishing installations for suspension or fastening of any equipment; connection of production equipment and sanitary devices to feed pipelines; installation of shut-off valves and flange connections on supply and distribution pipelines, as well as the use of internal fire hydrants installed on the sprinkler network for other purposes, except for extinguishing fires. Sprinklers for fire extinguishing installations must be kept clean.

As the main water supply, water pipelines are used, which provide the water flow and pressure necessary for fire extinguishing, as well as booster pumps. If there is insufficient pressure in the water supply system used to power the sprinkler installation, then booster pumps are provided. At least two pumps are installed in the pumping station - a working one and a standby one.

The power supply of the pump motors is provided from two independent sources. If there is only one power source, then the backup pump is driven by an internal combustion engine. manually activated. The electric control of the pumping station is carried out in such a way that it is possible to manually turn on the pump motors from the pumping station premises. Remote start is allowed by means of buttons installed in the premises of the fire station and near the internal fire hydrants.

The pumping station room is provided with telephone communication with the dispatch center and emergency lighting. At the entrance to the pumping station premises, a sign is posted and a light board "Fire extinguishing station" is installed. In the room of the pumping station, a piping diagram of the pumping station and a schematic diagram of the installation are posted. The room is kept permanently locked, the keys are kept by the staff on duty.

Automatic volumetric fire extinguishing installations with an electrical part and designed to protect premises with people staying in them are allowed for commissioning if they include: devices for switching automatic start-up to manual with the issuance of a corresponding signal to the premises of the personnel on duty; sound and light fire alarms.

A light warning signal in the form of an inscription on the light boards "Foam - go away" and an audible warning signal must be issued simultaneously within the protected premises.

In this case, a light signal "Foam - do not enter" should appear at the entrance to the protected room, and in the room of the duty personnel - a corresponding signal with information about the supply extinguishing agent.

Automatic fire extinguishing installations, the design of which provides for the presence of a duplicate manual start, must be operated in automatic mode.

Devices for manual start-up of volumetric (except for local) fire extinguishing installations should be located outside the protected area near emergency exits with free access to them.

Manual start devices for local fire extinguishing installations should be located outside the possible combustion zone at a safe distance from it. In this case, it should be possible to remotely switch on the unit outside the protected room.

Maintenance of water and foam fire extinguishing installations

The efficiency of installations depends on the quality of their operation, especially on the correct maintenance (MOT). Maintenance of water installations includes a number of activities carried out daily, weekly, monthly, once every 3 months, once every 6 months, annually, once every 3 years and once every 3.5 years.

Daily maintenance includes the following operations: a) checking the cleanliness and order in the premises of the fire extinguishing station; b) control of the water level in the tank using control and measuring devices; c) external examination pulse device or pneumatic tank and control of the water level and air pressure (when the pressure drops by 0.05 MPa (0.5 kgf / cm "), air should be pumped); d) checking the voltage at the power supply inputs; e) external inspection of control units and control of pressure above and below valve (according to pressure gauges); f) control of access to control units and manual cranes, as well as control over the observance of the minimum distances from the sprinklers to the stored materials (which must be at least 0.9 m).

Weekly maintenance includes all daily maintenance work and the following operations:

a) control of pumps of fire extinguishing stations: starting pumps at 10, checking the serviceability of instrumentation (gearbox) and the tightness of fittings and connections, renewing the supply of lubricant in the lubricators, testing the compressor at idle, checking the automatic pump activation with switching the power supply from the working input to the reserve one ;

b) check of control units (cleaning of taps with a small hole, check of operation of control units);

c) checking the presence of spare sprinklers in the control cabinet:

d) control of the pipeline system (inspection for the purpose of detecting and eliminating leaks, checking the condition of fasteners and painting of pipelines, tightness of stop valves, testing of manual valves);

e) cleaning of sprinklers and stimulators from dust in dusty rooms.

Monthly maintenance includes the following works:

a) carrying out activities for weekly maintenance:

b) cleaning the surface of pipelines from dust and dirt:

c) replenishment of reservoirs with water when the level drops below the design mark:

d) tightening of nuts on flange connections of pump nozzles with pipelines and foundation bolts and other preventive work:

e) checking the serviceability of the pressure gauges of the pneumatic tank by comparison with the control pressure gauge;

f) checking the operation of the installation in manual and automatic modes (if there are no specially trained personnel at the facilities).

THAT, carried out every 3 months. includes:

a) carrying out activities for monthly maintenance;

b) checking the internal fire hydrants located on the sprinkler network (by opening them);

c) change of pump oil seal packings:

d) flushing and lubricating pump bearings:

e) replacement of the stuffing box seals of the compressor;

f) checking the operation of the installation in manual and automatic modes (if the facility has specially trained personnel).

Annual maintenance includes the following works: a) metrological check of the checkpoint; b) control of the equipment of the fire extinguishing station (inspection and cleaning of the pneumatic tank at the stand; painting the outer surface of the impulse device of the pneumatic tank; cleaning, inspecting and repairing the compressor and fittings; cleaning, repairing and painting the inner and outer surfaces of the pump priming tank: testing the tightness of check valves and gate valves); c) measurement of working resistance and cleaning and repair of control units with replacement of faulty parts, rubber diaphragms and gaskets; d) bulkhead seals of all valves: e) flushing pipelines and changing water in the installation and the tank. Insulation resistance electrical circuits measured every 3

goals during the next annual maintenance.

Maintenance, carried out once every 3.5 years, includes the following works: a) disassembly, cleaning of pumps and their fittings, detailed inspection of all parts, repair and replacement of faulty ones: b) hydraulic and pneumatic tests of the pipeline network; c) cleaning of tanks, repair of the waterproofing layer and inlet valves: d) flushing and cleaning of pipelines from dirt and rust with replacement of faulty fasteners; e) painting of pipelines after flushing and cleaning.

The specificity of the operation of foam fire extinguishing installations (SCP) is determined by the presence of a foam concentrate or a foam-forming solution in the tanks of the installation, the design of the dosing device and the foam generator (sprinkler). The quality of foaming agents and foaming solutions filled in the UPP is checked at least once a quarter in accordance with the "Instructions for use, storage, transportation and quality control of foaming agents"). Foaming agents are considered unsuitable if the values ​​of their indicators are 20% lower than the normative ones. Defective foaming agents are written off and used either for educational purposes or as wetting additives to water. If the foaming solution or foaming agent is stored in a reinforced concrete tank, then at least once every 3 years the waterproofing layer of the tank is checked and, if necessary, repaired in order to avoid leakage of the extinguishing agent. During the operation of the soft starter, special attention should be paid to the state of foam generators (in particular, mesh), containers with a foam concentrate and communications for its supply, due to the fact that some constituent parts of foam concentrates tend to crystallize, as a result of which the flow cross-sections of pipes, branch pipes, taps may be clogged. During the operation of equipment for protecting tanks with flammable liquids, the condition of the sensors for detecting fire (sprinklers or TRV-2 detectors) installed in the upper part of the tank and the foam chamber (especially its sealing gate) is also checked.

After the operation of the UPP of its communication, the elements are washed with water. Periodic maintenance of foam fire extinguishing installations is performed in the same sequence as for water fire extinguishing installations. With the exception of the following work performed monthly: in containers where the foam concentrate or its solution is stored, the safety of the seals on the inspection hatches is checked: if the seals are torn off, the frother or solution is sent for analysis, and the hatches are sealed again; include on a short time dosing devices (for flushing with clean water); the pumps are stirred with a foaming solution or a foaming agent. Once every 3 years, the performance of the soft starter is selectively checked.

The procedure for accepting duty

An interceding employee from among the personnel on duty must arrive 15 minutes before the start of duty to the person responsible for the operation of the APPZ facilities for briefing.

The changing staff on duty is obliged to: put in order workplace: fill out the register of reception and delivery of duty, conduct a review of the equipment together with the intervening duty officer.

During the acceptance of duty, an employee from among the operational personnel is obliged to accept service and technical documentation.

Check the operability of telephone communication with the Ministry of Emergency Situations, other services of the facility.

In case of any malfunctions, make a note in the fault log and inform the person in charge of the operation to take corrective measures.

Report the change of duty and malfunctions to the person in charge of the operation of the SPS.

Actions of operating personnel when the control equipment is triggered.

While on duty, the operating personnel is obliged to monitor the technical condition of the UPA.

In cases of AUPT triggering, record it in the triggering log.

At each trigger, inspect the room together with the instructors of the safety department and give an opinion on a false alarm.

leaving on official matters, leave the power engineer on duty for himself, indicating his location.

In the event of a fire, operating personnel must:

Call the units of the Ministry of Emergency Situations;

Notify people in the building about the fire;

Inform the management of the organization about the fire;

Start extinguishing the fire using primary fire extinguishing equipment.

(in the presence of AUPT - check the inclusion of AUPT, if necessary, turn it on manually).

Instructions for service personnel.

Service personnel are obliged to:

check the cleanliness and order of the PT station;

conduct an external examination of the incentive system;

conduct an external inspection of the UU and control the pressure above and below the valve (not a pressure gauge);

control access to the control device and manual cranes, compliance with the minimum distances from the sprinklers to the stored materials;

control the serviceability of the pumps of the PT station;

check the serviceability of the control unit.

I APPROVE:
General manager
______________
________________
"___" ____________ 2012

INSTRUCTIONS
FOR OPERATING THE FIRE AUTOMATION
____________

_________________

1. AUTOMATION OF FIRE EXTINGUISHING.

For fire extinguishing are provided:
-automatic installation of sprinkler water fire extinguishing with water mist with installation of internal fire extinguishing valves on the supply pipelines to protect the premises;
-internal fire-fighting water supply system for protection of service and auxiliary premises;
-equipment of the fire extinguishing pumping station.
To protect the premises of the TOC there is a sprinkler water-filled installation for automatic fire extinguishing with water mist (water mist) using water mist sprinklers CBS0-PHo (d) 0.07-R1 / 2 / P57.B3 "Aquamaster".
Automatic installation of water sprinkler fire extinguishing consists of:
- supply pipelines;
- fire extinguishing station NS 70-65-3 / 100, which consists of
- pumping station module (MNS 70-65);
- module of two sprinkler control units MUU-ZS (MUU-3/100);
- a module for connecting mobile fire fighting equipment.
Fire extinguishing installation technical data:
The "Potok-3n control device" manufactured by Bolid is used as a control device for the pumping station.
The S2000M console provides reception of signals, through addressable devices, from standard automatic addressable and manual detectors, as well as technological sensors of fire extinguishing systems.
The system has an interface line, which is a two-wire communication line of the backbone structure with visual and sound indication of alarm and malfunction on the system devices. Possibility of programming devices for signaling about the state of the fire extinguishing installation.
Additional installed modules allow you to protect technical rooms discrete smoke detectors used for automatic control of engineering systems; issuing information to light and sound annunciators, issuing sound alert and documenting events. An indication module "S2000 BI isp.01" is installed in the premises of the personnel on duty, which makes it possible to obtain a visual control of the operation of the equipment of the automatic fire extinguishing pumping station.
A fire tank is used as a source of water supply.
To supply water to the pipelines of the sprinkler installation, booster fire pumps of the GRUNDFOS NB 50-257 type with a 30 kW electric motor (main and standby) are provided. Delivery - 75 m3 / h, with a head - 81 m.
The principle of operation of the installation of water fire extinguishing.
In standby mode, the supply pipeline (to the control units), the supply and distribution pipelines are filled with water and are under a pressure of P = 0.5 MPa (50 m) created by a jockey pump.
Automation elements are in standby mode.
In the event of a fire source in the protected premises, the temperature rises. An increase in temperature to 570C leads to the destruction of the glass tube of the sprinkler.
Opening the sprinkler leads to a drop in pressure in the supply and distribution pipelines.
The water pressure in the supply pipeline raises the gate of the KS water-filled sprinkler valve of the "Bage" type.
When the control unit valve is opened from the pressure alarms installed on the control unit, an impulse is issued to turn on the working booster pump for water supply, as well as a fire alarm (in case of failure smoke detectors earlier) and the start of the installation.
If the working pump does not create the design pressure Pcalc = 0.70 MPa, the reserve pump is switched on, and the worker is switched off. Water flows through the open control unit through the supply and distribution pipelines to the fire site. The jockey pump is turned off.
Automatic start-up is carried out using the contacts of the "Potok 3N" device, which provide activation of the pumps of the fire-fighting booster pumping station. Remote start of automatic smoke protection and warning people about a fire is carried out from manual fire detectors installed on the escape routes. Manual start-up of booster pumps is carried out at the location of the equipment on the pump control cabinets.
After extinguishing the fire, it is necessary;
- check the sprinklers and pipelines that were in the combustion zone, which are out of order - replace them;
- fill the distribution, supply and supply pipelines with water;
- bring the opened control unit into working condition;
- bring the elements of automation into a state of control.
When operating the units, the following rules must be observed:
1) repair work associated with the installation and dismantling of equipment, carry out in the absence of pressure in the repaired unit;
2) cleaning and painting of pipelines located close to current-carrying elements is allowed to be carried out only when voltage is removed from them with the issuance of a permit;
3) the persons involved in the performance of hydraulic tests, at the time of testing, must be in safe places or behind a specially provided screen;
4) hydraulic and pneumatic testing of pipelines must be carried out in accordance with the approved instructions for testing pipelines;
5) lubrication of engines on the move, tightening the bolts on the moving parts of the mechanisms is not allowed;
6) instructions and posters on safety precautions must be displayed in the control room and in the fire extinguishing station;
7) perform repair work on electrical equipment after disconnecting the power supply;
8) when carrying out commissioning, repair and preventive work, it is necessary to take into account that the installation of automatic fire extinguishing when voltage is removed from any control cabinet (box) on electrical devices, terminal blocks of this device may have a voltage of 220V, 50 Hz, since the automation control circuits are interconnected , and the rest of the sources are not de-energized, therefore, before carrying out the specified work, it is necessary to carefully study the power supply circuit of the installation consumers, then disconnect the necessary devices;
9) when performing work with electrical equipment, it is necessary to have dielectric rugs and gloves;
10) when carrying out repair work, portable luminaires with a voltage not higher than 42 V must be used;
11) all non-current-carrying parts of electrical equipment that may be energized as a result of insulation failure must be grounded (neutralized);
12) all work should be performed only with a serviceable tool, it is prohibited to use wrenches with extended handles, instrument handles must be made of insulating material.
Operation by a fire extinguishing pumping station.
1 To turn off the fire pumps, make sure the fire is contained;
2 If the fire is extinguished or it turns out that a false alarm has occurred
the pump mode knobs on the pump control cabinets (main standby and jockey) to the "0" position;
3 Call the service organization by phone .___________________;
To put the fire pumping station into standby mode, it is necessary to perform the following actions:
1 All valves must be in the open position;
2 Turn off the automatic power supply of the pumping station for 30 seconds;
3 Switch on the automatic power supply of the pumping station;
4 Switch on all the automatic power supplies in the electrical panel of the pumping station;
5 Move the pump mode knobs on the pump control cabinets (main standby and jockey) to the "remote" position;
To check the operation of the pumps in manual mode (main standby and jockey), move to the position "seats." and briefly press the pump start button (green) on the control cabinet and after making sure (1-2 sec) the pumps are operating, briefly press the pump stop button (red) on the control cabinet.

2. AUTOMATIC FIRE ALARMS AND SOUE
The automatic fire alarm system (APS) is designed to detect the early stages of fire and smoke in retail and office premises ____________, turn on the voice notification system to organize the evacuation of people and turn on active fire protection (APZ).
The number of sound annunciators (sirens), their arrangement and power provide the necessary audibility in all places of permanent or temporary stay of people.
The warning system automatically turns on when a fire is detected in the building by a signal from AUPT or AUPS.
The APS exit point is located on the ground floor in the security room. The fire department is equipped with a telephone connection. The security personnel work round-the-clock. On floors four to seven there are office rooms.
To organize the APS system of the office part of the building, the following equipment is used:
- analogue addressable smoke detector Z-051, according to NPB 88-2001 * at least two detectors in one room (reacts to smoke in protected rooms);
- manual addressable fire detector Z-041 (installed on escape routes);
- fire alarm control device "Z-101" (designed for connection and control of fire alarm loops, for control and management of input and output units (Z-011. Z-022);
- addressable output block "Z-011" (designed to start the fire warning system, turn off ventilation and air conditioning systems in case of fire, start the smoke exhaust system).
- Linear fire smoke detector 6500R (reacts to smoke in protected rooms);
-in the warning system, the equipment of the company "JEDIA" is used, which has all the necessary certificates.
Fire alarm station Z-101.
The fire alarm station is designed to receive signals from detectors, address devices and control technological equipment.
The output of information about the state of the fire alarm system is carried out on the display located on the front panel, which makes it possible to display information about the state of the system in real time.
It has 2 loops with 250 addresses each.
Has an RS-485 output for connecting remote keyboards (up to 5 pcs.).
Z-101 is a complete fire alarm station with a full range of required functions.
The station receives and processes information from peripheral devices.
Each station has 5 programmable outputs, as well as a Fire relay and a Fault relay. There is also a 24V output and an external siren output.
Each station has a built-in printer with the ability to filter printed events.
999 events log.
Analog addressable smoke detector Z-051.
The Z-051 detector is designed to work with the Z-line series equipment. From-broadcaster is connected to an addressable loop (up to 250 addresses). Designed for opto-electronic detection of combustion products. Has a built-in indicator (LED). For internal use. The detector is programmed using the Z-511 address programmer.
The principle of operation is photoelectric, working on the principle of light scattering.
Manual addressable fire detector Z -041.
The Z-041 module is designed to work with the Z-line series equipment. Manual call point is installed on escape routes, staircases. When you press on the glass, a microswitch is triggered. Restoration of the detector to an operable state is carried out using a key.
Short circuit insulator Z -011
The Z-011 module is designed to work with the Z-line series equipment. The module is connected to an addressable loop (up to 250 addresses).
Purpose:
When a short circuit occurs in the loop, the short-circuited part of the loop between the two nearest short circuit modules is disconnected.
Has a built-in indicator (LED).
The number of modules in the loop is not limited.
Has no address.
Input module Z -021
The Z-021 module is designed to work with the Z-line series equipment.
The module is connected to an addressable loop (up to 250 addresses).
Purpose:
- Designed to receive a signal from external alarm sources.
- Contains an input with a 2 kΩ EOL resistor.
- Monitors the signal line for short circuit and open circuit.
- Has a built-in indicator (LED). The module is programmed using the Z-511 address programmer.
Application:
-Start buttons.
- Flame detectors with relay outputs.
-Flow relay, etc.
Output module Z -022
The Z-022 module is designed to work with the Z-line series equipment.
The module is connected to an addressable loop (up to 250 addresses).
Purpose:
Designed to control external equipment.
Contains a feedback input.
Receiving a "Fault" signal when the feedback circuit is closed without a "Fire" signal
Group of contacts for switching normally closed and normally open (N0-C-NC)
Has 2 built-in indicators (LED) Operation and Activation.
The module is programmed using the Z-511 address programmer.
Application:
Monitoring and / or control of various technological equipment
- fire retardant valves,
- smoke hatches,
- pump boosters,
- ventilation systems, etc.

Instructions for the actions of the personnel on duty when a fire alarm or malfunction is triggered
Upon receipt of the "FIRE" signal (turning on the audible signal smoothly changing in tone and the red "Fire" LED indicator on the front panel of the "Z-101" device):
1. Report the incident to the fire department (PCh-12) by phone 01 or _____________; inform the address of the object where it is burning (place of fire), what it threatens (information about the fire is displayed on the LCD display - displaying the fact of a fire alarm and detailed information about the place of the fire).
2. Report the incident to the fire safety officer __________________ by phone. __________________, to the head of DPD _________________ by phone. ________________, General Director __________________, tel. ______________.
3. Check the switching on of the smoke exhaust system, fire extinguishing, warning in case of fire. If the warning system does not work in automatic mode, use manual call points, as well as to notify the service personnel and visitors by voice through radio broadcasting for the fastest and most timely evacuation of people or transmission additional functions.
4. Open all door locks at the main and emergency evacuation exits from the building, the chief power engineer (electrician) de-energize the floor / building.
5. Send the guard on duty or a member of the traffic police to meet the firefighters and escort them to the place of the fire.
The fire alarm condition can only be cleared by a manual restart (by pressing the "RESET" button on the front of the Z-101 control panel).

Upon receipt of the "FAILURE" signal on the "Z-101" fire alarm panel (an intermittent fault signal is sent to the built-in sounder and turns on the LED indicators on the front panel of the device):
1. Look at the display for detailed information about the malfunction (also information about the malfunction is printed on the built-in printer, namely the cause of the malfunction and the time the malfunction occurred). Try to switch the device by manual restart (by pressing the "RESET" button).
2. If the normal operation of the device has not been restored, it is necessary to reversibly remove from the equipment at the facility some addressable devices of the loop without reprogramming the entire system. For example, it may be a situation when it is necessary to turn off a faulty detector before the arrival of service personnel. To do this, in standby mode, press the "menu" key and enter the password 111111. After entering the correct password, the operator menu will appear. Press "1" to enter the device shutdown mode. The following devices can be disabled: detectors, input and output modules, sirens. If at least one of these devices is disabled, the "Disabled" LED on the Product lights up. Disconnection information will be shown on the display.
3. Call a specialized organization to rectify the malfunction. Tel .__________________.
Mute (notifications):
The built-in siren is switched off manually by pressing the "Mute" key. At the same time, the "Sound off" LED on the front panel lights up. If "Z-101" is in a sounding state or in a non-alarm monitoring state, the "Sound off" LED is displayed. on the front panel will go out.
Delete alarm or fault information, restart:
To delete information about a fire alarm, supervision or a fault (faults in the main or backup power supply are indicated by LEDs, this is not shown on the display), press the "Reset" key by restarting "Z-101". The information about the disconnection of the device will be deleted from the display after canceling the disconnection of the device (i.e. turning it on); information about the malfunction will be deleted after the malfunction is eliminated.
System testing:
Press the "Test" (self-test) key on the information interface to test on the LCD screen, the front panel LEDs light up and the sirens are activated. After self-testing, the request pending state is automatically returned.
Key lock:
On the front side of the "Z-101" there is a lock with a key for locking and unlocking the keys. By turning the key to the left, the keyboard is locked. In this state, the operator can only turn off the notification by pressing the "Mute" button. When the key is turned to the right, all keyboard functions are available.
Automatic and manual modes:
To switch between manual / automatic modes, press the "manual / auto" key and then enter the correct password 111111. If the Device is in automatic mode, the "automatic / manual" LED will light up. When the device (Z-101) is in manual mode, the LED is off. The instrument (Z-101) in manual mode will not automatically send any control signal. In this case, the control is carried out manually.
Entering a textual description of the location of the addressable device (descriptor):
To enter location information in the administrator menu, press key 4 to exit to the descriptor entry screen. By entering the device address and pressing the "Enter" key, the display shows the available text information. To select the input mode, press the "Test" keys. After selecting the input mode, enter the address (location) of the device.
More detailed information is given in the Operation Manual of the network analogue addressable fire alarm panels of the Z-line series, which is attached to this manual.

3. SMOKE EXHAUST SYSTEM
Fire safety ventilation systems are provided:
- equipment with separate ventilation systems for premises of various functional purposes;
- installation of fire-retardant valves with standardized fire-resistance limits at the points of intersection of fire barriers by air ducts (walls and ceilings);
- automatic shutdown general ventilation in case of fire and switching on the system smoke ventilation;
- thermal insulation made of non-combustible materials.
- air ducts of smoke exhaust systems and transit air ducts of ventilation systems are covered fire retardant.
The smoke exhaust system turns on automatically when the warning system is started in the event of a fire and the general ventilation is turned off (if the warning system did not work automatically, it must be started from manual call points).

The instruction was made by ____________________

ANNEX 1.
Duties of service and operating personnel.
1.3.1. At the facilities, all types of maintenance and repair work, as well as the maintenance of fire automation installations must be carried out by the facility's own specialists who have undergone appropriate training, or, under a contract, by organizations that have a license from the GPN control bodies for the right to perform installation, commissioning and technical maintenance of fire control systems.
1.3.2. At each facility, the following personnel must be assigned to operate and maintain in a technically sound condition of fire automation installations by order of the head:
- the person responsible for the operation of fire control systems;
- specialists who have been trained to perform maintenance and repair work on fire-fighting automatics installations (in the absence of an agreement with a specialized organization);
- operational (duty) personnel to monitor the state of installations, as well as call the fire department in the event of a fire.
1.3.3. Control over compliance with the maintenance and repair regulations, the timeliness and quality of work performed by a specialized organization should be entrusted to the person responsible for the operation of fire automation installations.
1.3.4. The person responsible for the operation of fire automation installations is obliged to ensure:
- compliance with the requirements of these rules;
- acceptance of maintenance and repair work in accordance with the schedule and work schedule under the contract;
- maintenance of fire control systems in good working order and working order by carrying out timely maintenance and repairs;
- training of service and duty personnel, as well as instructing persons working in the protected premises, actions when the fire automatics are triggered;
- information to the relevant control bodies of the GPN about all cases of failures and operation of installations;
- timely submission of complaints: to manufacturers - upon delivery of incomplete, low-quality or not corresponding to the normative-technical documentation of devices and equipment of fire-fighting automatics installations; to installation organizations - in case of detection of poor-quality installation or deviations from the design documentation during installation, not agreed with the project developer and the state fire supervision authority; service organizations - for untimely and poor-quality maintenance and repair of installations and fire automation equipment.
1.3.5. Facility maintenance personnel or a representative of a specialized
organizations are obliged to know the device and the principle of operation of the installation of automatic fire-fighting equipment at the facility, to know and comply with the requirements of these Rules, Instructions for the operation of this installation.
1.3.6. Persons who have discovered a malfunction of the installations are obliged to immediately report this to the personnel on duty, and the latter to the person responsible for the operation of the system, who is obliged to take measures to eliminate the identified malfunctions.
1.3.7. The service personnel of the facility or a representative of the service organization carrying out maintenance and repair of fire automation installations must carry out routine maintenance in a timely manner and maintain the appropriate operating documentation given in the annexes to these Rules.
1.3.8. It is forbidden to turn off the fire alarm systems during operation, as well as to introduce changes to the adopted protection scheme without correcting the design and estimate documentation, not coordinated with the territorial management body of the GPN.
1.3.9. The administration of the facilities is obliged to ensure, during the period of maintenance and repair work, the implementation of which is associated with the shutdown of installations, the fire safety of the premises protected by the installations by compensating measures, the supply of information about this to the control bodies of the GPN and, if necessary, non-departmental security.
1.3.10. Operational (duty) personnel should know:
- Instructions for the operational (duty personnel);
- tactical and technical characteristics of devices and equipment of fire-fighting automation installations mounted at the enterprise, and the principle of their operation;
- the name, purpose and location of the protected (controlled) facilities of the premises;
- the procedure for starting up the installation of fire automatics in manual mode;
- the procedure for maintaining operational documentation;
- the procedure for monitoring the operational state of the fire automation installation at the facility;
- the procedure for calling the fire department.

APPENDIX 2.
Operation log
Fire control systems
(Form)
1.The name and departmental affiliation (form of ownership) of the facility equipped with a fire automation system
(type of system, starting method)
The address_________________________________________________________________
Date of installation of the system, name of the installer
______________________________________________________________________
Fire control system type
______________________________________________________________________
The name of the organization (service) serving the system
______________________________________________________________________
Telephone_______________________________________________________________
2.Characteristics of the fire automation system
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
(name of technical means, date of issue, date of commencement of operation, next period of certification)
3. Fundamental wiring diagram fire control systems.
4.Results of hydraulic and electrical test.
Date of test Results of tests Conclusion Signature

5. Acceptance-handover of duty and technical condition of the system:
Date of acceptance and delivery The state of the systems for the period of duty The name of the protected objects and the type of systems from which the signals came

6.Accounting for failures and malfunctions of fire automation systems
Item number Date and time of receipt of the message Name
controlled
premises Character
of malfunction Name and position of the person who accepted the date and time of elimination of the malfunction Note

7. Accounting for technical maintenance and scheduled preventive maintenance of fire automation systems.
Item number Date System type Monitored object Nature of work performed List of work performed Position, surname and signature of the person who performed the maintenance Note

8. Testing the knowledge of personnel serving fire automation systems

full name, position, work experience of the auditee Date of verification Assessment of knowledge Signature of the auditor Signature of the auditee

9.Accounting the operation (shutdown) of fire automation systems and information from the GPN bodies

p / n Name of the controlled object Type and type of fire automation system Date of actuation (off) Reason of actuation (off) Damage from fire Amount of saved values ​​Reason of actuation Date of information GPN

10. Briefing of technical and operational personnel on safety measures when working with fire automation systems.

p / n Surname of instructed person Position held of instructed Date of instruction Instructed signature Signature of instructor

APPENDIX 3.
Message
on the actuation (failure) of the fire automation system (sent to the territorial body of the GPN)
1.The name of the company and its address
______________________________________________________________________
______________________________________________________________________
(type of ownership)
2.Date of trip or trip ______________________________________
3.Characteristics of the controlled premises ____________________________
______________________________________________________________________
4. Reason for tripping or tripping ___________________________________
______________________________________________________________________
______________________________________________________________________
5.Type of control panel or fire extinguishing system
______________________________________________________________________
______________________________________________________________________
6.Number of triggered sprinklers, detectors
______________________________________________________________________
7.Efficiency in detecting or extinguishing a fire of system fire-fighting automatics ____________________________________________________________________
______________________________________________________________________
(worked in a timely manner, with a delay, etc.)
8 Estimated fire damage
______________________________________________________________________

9.Saved material assets due to the presence and timely operation of the fire automation system _____________________________________________
(amount, thousand rubles)
10.In case of system failure, indicate the reasons for the failure
______________________________________________________________________

______________________________________________________________________ ((name, signature of the official)

"_________" _________________________ 20_____

APPENDIX 4.
Work regulations
for the maintenance of fire extinguishing systems, fire and
security and fire alarm.
Regulations
maintenance of water fire extinguishing systems
List of works Periodicity of maintenance by the enterprise operation service Periodicity of servicing by specialized organizations under a contract 1 option Frequency of servicing by specialized organizations under a contract 2 option
External examination of the system components (technological part - pipelines, sprinklers, check valves, metering devices, shut-off valves, pressure gauges, pneumatic tank, pumps, etc .; electrical part - electrical control cabinets, electric motors, etc.) .), for damage, corrosion, dirt, leaks; the strength of fasteners, the presence of seals, etc. Daily Monthly Quarterly
Control of pressure, water level, operating position of shut-off valves, etc. Daily Monthly Quarterly
Control of the main and standby power supplies and check of automatic switching of power supply from the operating input to the standby and vice versa The same The same The same
Functional check of the system components (technological part, electrical part and signaling part) The same The same The same
Preventive work Monthly Quarterly Quarterly
Checking the system performance in
manual (local, remote) and automatic modes The same The same The same
Flushing pipelines and changing water in the system and reservoirs Annually Annually Annually

Measurement of insulation resistance of electrical circuits Once every 3 years Once every 3 years Once every 3 years
Hydraulic and pneumatic testing of pipelines for tightness and strength Once every 3.5 years Once every 3.5 years Once every 3.5 years
Technical inspection of system components operating under pressure In accordance with the standards of the Gosgortekhnadzor In accordance with the standards of the Gosgortekhnadzor In accordance with the standards of the Gosgortechnadzor

Regulations
maintenance of fire alarm systems
External examination of the system components (alarm control panel, detectors, annunciators, alarm loop) for mechanical damage, corrosion, dirt, fastening strength, etc. Daily Monthly Quarterly
Monitoring the working position of switches and switches, the serviceability of the light indication, the presence of seals on the receiving - control device The same The same The same
Monitoring the main and backup power supplies and checking the automatic switching of power from the operating input to
standby Weekly The same The same
Checking the performance of the system components (control panel, detectors, sirens,
measurement of signaling loop parameters, etc.) The same The same The same
Preventive works The same The same The same
System operability check The same The same The same
Metrological check of instrumentation Annually Annually Annually
Measurement of resistance of protective and functional grounding Annually Annually Annually

Regulations
maintenance of smoke protection systems
List of works Periodicity of maintenance by the facility operation service Periodicity of servicing by specialized organizations under the contract 1 option Frequency of servicing by specialized organizations under the contract 2 option
External examination of the components of the system (electrical part of the remote control panel, electrical panel of the floor valve of the local control panel, actuators, fans, pumps, etc .;
signaling part - control devices, alarm loop, detectors, annunciators, etc.) for the absence of damage. Corrosion, dirt, fastening strength, seals, etc. Daily Monthly Quarterly
Monitoring of the operating position of switches and switches, light indication, etc. The same The same The same
Control of the main and backup power supplies and automatic power switching from the operating input to
standby and back Weekly The same The same
Checking the performance of the components of the system (electrical part,
signaling part) The same The same The same
System operability check in manual (local, remote) and automatic modes The same The same The same
Metrological check of instrumentation Annually Annually Annually
Resistance measurements of protective and working grounding The same The same The same
Measurement of insulation resistance of electrical circuits 1 time in 3 years 1 time in 3 years 1 time in 3 years

Download the operating instructions for the fire automatics

General Provisions

The procedure for the operation and maintenance of automatic fire extinguishing systems (installations) is regulated by GOST, SNiP, PPB, departmental norms and rules, technical operational documentation for installations.
Responsibility for organizing the operation of the AUP is assigned to the managers of the facilities, which are protected by fire automation equipment.
For each AUP, an order or order for the enterprise (organization) must be issued, appointing:
- the person responsible for the operation of the installation;
- operational (duty) personnel for round-the-clock monitoring of the operational state of installations.

For each AFS for the persons responsible for the operation of the installation, and for the personnel serving this installation, operating instructions should be developed taking into account the specifics of the protected premises, approved by the management of the enterprise and agreed with the organization that carries out maintenance and R AUP.
The person responsible for the operation of the AFS must promptly inform the local authorities of the GPS about failures and operation of installations.
Operational (duty) personnel must have and fill out the "Installation fault log".
An enterprise that carries out maintenance and repair of AUP must have a license for installation, commissioning, repair and maintenance of equipment and fire protection systems.
It is allowed to carry out maintenance and repair by specialists of the facility with the appropriate qualifications. In this case, the procedure for carrying out maintenance and repair work must comply with the Methodological Recommendations of VNIIPO.

The restoration of the operability of the AUP or APSS after all operation or failure should not exceed:
- for Moscow, St. Petersburg, administrative centers of autonomous entities as part of Russian Federation- 6 hours;
- for other cities and settlements- 18 hours

Between the operating organization and the enterprise that carries out maintenance and repair, a "Agreement for the maintenance and repair of automatic fire extinguishing installations" must be concluded and valid.
The control room should contain instructions on the procedure for the dispatcher on duty when receiving alarms.
Acceptance of AUP for maintenance and repair should be preceded by an initial inspection of the installation in order to determine its technical condition.
The initial examination of the AUP should be carried out by a commission, which includes a representative of the GPN authorities.
Based on the results of the inspection of the AUP, the "Act of the primary survey of automatic fire extinguishing installations" and the "Act on the work performed on the initial examination of the automatic fire extinguishing installations" should be drawn up.

For the installation accepted at TO and R, after the conclusion of the contract, the following must be filled in:
- passport of an automatic fire extinguishing installation;
- logbook of registration of works on maintenance and repair of automatic fire extinguishing installations. It should record all maintenance and repair work, including quality control. One copy of this log should be kept by the person responsible for the operation of the installation, the second - in the organization performing maintenance and repair. The pages of the magazine should be numbered, laced and sealed with the seals of organizations serving the AUP and carrying out maintenance;
- maintenance and repair schedule. The procedure for the maintenance and repair of the AUP, as well as the period for eliminating the failure, installations must comply with the Methodological Recommendations of VNIIPO. The list and frequency of maintenance work must comply with the standard maintenance regulations of the AUP;

- technical requirements that determine the parameters of the AUP operability.

The enterprise must have the following technical documentation:
- act of primary examination by AUP;
- act for the work performed on the primary examination of the AUP;
- contract for maintenance and repair;
- schedule of maintenance and repair;
- technical requirements that determine the parameters of the AUP performance;
- a list of technical means included in the AUP and subject to maintenance and repair;
- call log;
- AUP technical inspection act;
- project for AUP;
- passports, certificates for equipment and devices;
- list of mounted equipment, units, instruments and automation equipment;
- passports for charging cylinders of gas fire extinguishing installations;
- operating instructions for the installation;
- register of works on maintenance and repair;
- duty schedule of operational (duty) personnel;
- a log of the acceptance of duty by operational personnel;
- log of weighing (control) of cylinders with fire extinguishing composition of gas fire extinguishing installations.

All the necessary documentation for the AUP (or photocopies) must be kept by the person responsible for the operation of the AUP.
During an external examination of the AUP and the premises protected by it, it is necessary to check the compliance with the project:
- characteristics of the protected premises and its combustible load;
- modification of sprinklers for fire extinguishing installations, method of their installation and placement;
- cleanliness of sprinklers;
- pipelines of installations (it is not allowed to use pipelines of fire extinguishing installations for suspension, attachment, connection of equipment not related to AUP);
- light and sound signaling located in the control room;
- telephone communication of the dispatch center with the fire brigade of the enterprise or settlement.

Features of checking fire extinguishing installations

Checking water and foam fire extinguishing installations

When inspecting the technical condition of water and foam fire extinguishing installations, it is necessary to be guided by GOST R 50680, GOST R 50800, NPB 88-2001 and the requirements of the VNIIPO Methodological Recommendations.
During the inspection of water and foam fire extinguishing installations, the following should be checked:
1. Condition of sprinklers (in places where there is a danger of mechanical damage, sprinklers must be protected by reliable fences that do not affect the irrigation map and the spread of heat flows).
2. Standard sizes of sprinklers (sprinklers with outlets of the same diameter must be installed within each distribution pipeline (one section)).
3. Maintenance of sprinklers (must be kept clean at all times; during the period of repair work and the protected area, sprinklers must be protected from plaster, paint and whitewash; after the repair of the room, protective devices must be removed).
4. Availability of a stock of sprinklers (must be at least 10% for each type of sprinklers from among those mounted on distribution pipelines, for their timely replacement during operation).
5. Protective coating of pipelines (in rooms with a chemically active or aggressive environment, they must be protected with acid-resistant paint).
6. Availability of a functional piping diagram of control units (each unit should have a functional piping diagram, and on each direction - a plate indicating the operating pressures, protected rooms, mud and the number of sprinklers in each section of the system, the position (state) of locking elements in the duty mode).
7. Availability on storage tanks of an emergency supply of water for fire extinguishing purposes with devices that exclude water consumption for other needs.
8. Availability of a reserve stock of the foaming agent (a 100% reserve stock of the foaming agent must be provided).
9. Providing the premises of the pumping station with telephone communication with the dispatch center.
10. At the entrance to the pumping station, there is a sign "Fire extinguishing station" and a permanently functioning light board with a similar inscription.
11. Presence of clearly and neatly executed piping schemes of the pumping station and a schematic diagram of a fire extinguishing installation posted in the pumping station. All indicating measuring instruments must have inscriptions about working pressures and permissible limits of their measurements.
12. Installation testing period (testing of water and foam fire extinguishing installations during their operation should be carried out at least once every 5 years).

When operating the AUP, it is prohibited:
- to install plugs and plugs instead of opened or faulty sprinklers, as well as to install sprinklers with a melting temperature of the castle, other than the one provided by the design documentation;
- store materials at a distance of less than 0.6 m from the sprinklers;
- use pipelines of fire extinguishing installations for suspension or fastening of any equipment;
- connect production or plumbing equipment to the feed pipelines of the fire extinguishing installation;
- install shut-off valves and flange connections on supply and distribution pipelines;
- use internal fire hydrants installed on the sprinkler network for purposes other than fire extinguishing;
- use compressors for purposes not related to ensuring the operability of the installation.

Features of checking gas fire extinguishing installations

In the process of controlling the UGP during operation, it is necessary:
- conduct an external examination of the unit's components for mechanical damage, dirt, fastening strength, presence of seals;
- check the working position of the shut-off valves in the stimulating network and starting cylinders;
- check the main and backup power supply, check the automatic switching of power supply from the working input to the reserve one;
- control the amount of OTV by weighing or monitoring pressure (for centralized UGPs - the main and reserve amount of OTUs, for modular UGPs - the number of OTUs and the availability of its stock);
- check the operability of the components of the installation (technological part, electrical part);
- check the operation of the installation in manual (remote) and automatic modes;
- check the availability of metrological verification of instrumentation;
- measure the resistance of the protective and working grounding;
- measure the insulation resistance of electrical circuits;
- check the availability and validity of the technical examination of the UGP components operating under pressure.

The control and testing of the UGP should be carried out without the release of the fire extinguishing agent according to the methods set forth in GOST R 50969.
The control of the mass (pressure) of the GOS, the control of the gas pressure in the incentive cylinders must be carried out within the terms established by the TD at the UGP, with a note in the journal. Requirements for UGP and propellant gas used when refueling (pumping) UGP should be the same as during the initial refueling.
Fire extinguishing stations must be equipped and maintained in a condition consistent with design solutions.
If during the operation of the UGP its operation or failure occurred, the UGP must be restored (refueling the UGP, with propellant gas, replacing modules, pyrocartridges in starting cylinders, switchgears, etc.) within the established time frame and making appropriate entries in the log ...
In the case of using the UGP from the stock of the UGP, it must be restored simultaneously with the restoration of the operability of the UGP.

Features of checking aerosol fire extinguishing installations

When examining objects protected by AUP, it is necessary to monitor compliance with a number of regulatory requirements.
The requirements of the maintenance regulations for the inspected AAP must not be lower than the requirements of the "Standard regulations for the maintenance of aerosol fire extinguishing installations".
If mechanical damage is possible at the installation site of GOA, then they must be fenced.
Places of installation of GOA and their orientation in space must correspond to the project.
GOA must have seals or other devices confirming their integrity.
The combustible load of the room protected by the UAP, its leakage and geometric dimensions must fit the project.
There should be no combustible materials on the surface of the GOA and in the zone of exposure to the high-temperature aerosol jet.
Electric wires designed to supply an electrical impulse to the GOA starting device must be laid and protected from thermal and other influences in accordance with the project.
The GOA stock must be appropriate for the project.
There must be a working light and sound alarm in the protected room and in the room of the duty post.
There must be an instruction for the service personnel in the protected area on the actions to be taken when the aerosol fire extinguishing system is triggered.

Features of testing modular powder fire extinguishing installations.

The list and frequency of maintenance work is determined in accordance with the regulations drawn up by the MAUPT developer on the basis of the technical documentation for the component parts. The requirements of the maintenance regulations for a specific IAPMT must not be lower than the requirements of the standard maintenance regulations.


List of works

Frequency of maintenance by the maintenance service of the enterprise

Frequency of maintenance by specialized enterprises

External examination of the system components (pipelines, sprayers, powder modules, compressed gas cylinders, pressure gauges, etc.); electrical part of electrical cabinets, etc.; signaling part of control panels, detectors, etc. ) for the absence of mechanical damage, dirt, strength of fasteners, etc.

Daily

Monthly

Pressure control in modules and starting cylinders

Control of the main and backup sources power supply, check of automatic switching of power supply from working input to standby

Weekly

Quality control of fire extinguishing powder

In accordance with TD per module

In accordance with TD per module

Checking the performance of the system components (technological part, electrical part, signaling)

Monthly

Monthly

Preventive work

System operability check in manual (local, remote) and automatic modes

At least twice a year

At least twice a year

Metrological check of instrumentation

Annually

Annually

Resistance measurement of protective and working ground

Bodies of the State Border Service check for the presence of entries in the register of maintenance work and maintenance MAUPT in accordance with the regulations and checking the maintenance of the passport of the vessel operating under pressure (if necessary, its presence, according to PB 10-115).

Additionally, representatives of the State Border Service conduct an external examination of the IAPM:
- availability of factory seals;
- the presence of a displacing gas;
- availability of safety devices, according to the documentation for the module;
- the presence of the module marking, as well as the correspondence of the brand of the extinguishing powder to the fire classes in the room;
- the presence of devices from the spontaneous start of MAUPT;
- the state of the linear part of the signaling loop;
- compliance of the laid electrical wiring, installed detectors. devices, boxes, etc. project documentation.

Maintenance of AUP after commissioning should be carried out in the amount and terms established by special schedules, in accordance with technical documentation on its elements, but at least once a quarter.

The fire extinguishing installation after replacing the equipment, repairs must undergo 72 hours of control in the operating mode (measures should be taken to exclude the supply of OTS).

It is necessary to observe the rules of storage, transportation and disposal of the installation elements specified in the operating documents for these elements.

In the protected premises there must be instructions on the actions of the people working in them in the event of the installation being triggered.

During the period of repair work in the protected premises sprinklers (sprinklers, nozzles, thermal locks, fire detectors, elements of a cable stimulating system) must be protected from plaster, paint, whitewash, etc. After finishing the repair of the room, the devices that provided protection must be removed.

Defective sprinklers and nozzles should be replaced with similar products (for example, from the spare parts kit), while maintaining their orientation in space in accordance with the installation project. It is not allowed to install plugs or plugs instead of faulty sprinklers or nozzles. It is not allowed to clutter up the space in front of the sprinklers (nozzles) with equipment, lighting fixtures, etc. During maintenance, it is necessary to periodically flush (purge) pipelines to remove dirt and rust, as well as test pipelines for strength and tightness.

It is prohibited:

    - use pipelines of the installation for suspension or fastening of any equipment;

    - connect production equipment and sanitary appliances to the feed (distribution) pipelines of the installation, install shut-off valves on them (except as provided for by the project);

    - use internal fire hydrants for other purposes than extinguishing fires.

When carrying out restoration work paints and varnishes of the installation elements, the identifying colors established by the project should be observed.

During the operation of the installation volumetric fire extinguishing type of fire load, dimensions and placement of openings in the protected premises must correspond to the project. Measures should be taken to eliminate technologically unjustified openings, to monitor the performance of door closers, etc. Premises, if necessary, should have serviceable devices (or permanently open openings) to relieve pressure. Changes in the characteristics of the premises that were used as initial data in the design of the AFS (changing the type of fire load, the size and location of permanently open openings, etc.) should be agreed with the AFS developer organization.

Fire post must be provided with direct telephone communication with the pumping station (gas fire extinguishing station), as well as city telephone communication, serviceable electric lights.

Periodically, the operability of the light and sound signaling about the actuation of the fire extinguishing system and its malfunction should be checked. A round-the-clock and constant duty of personnel should be organized at the fire post. The actions of the personnel on duty upon receipt of signals are stipulated by the instructions.