INSTRUCTIONS AND PROPHECIES OF THE Blessed MOTHER ALIPIA GOLOSEEVSKY, Kyiv...
![Instructions and prophecies of the blessed mother Alipia Goloseevskaya, the Kyiv old woman, the holy fool for Christ's sake](https://i1.wp.com/megapoisk.com/uploads/7013271468409176.jpg)
1. Register of executive documentation
2. General work log and special work:
3.
4. Acts, acceptance and test protocols, other documents:
5.
6. , , fire certificates, sanitary and hygienic conclusions for building materials, products and structures. For all building materials, products, structures and equipment arriving at the construction site, an incoming control report must be drawn up, followed by signing by responsible persons
7. A set of working drawings for the construction of an object presented for acceptance, developed by design organizations, with inscriptions on the compliance of the work performed in kind with these drawings or changes made to them, made by persons responsible for the construction and installation work, agreed with the authors of the project.
8. Documents on the approval of deviations from the project during construction
The set of acceptance documentation includes a package of permits:
*The presented composition of the executive documentation is approximate. Specify the exact composition of the executive documentation with the customer.
ACT OF ACCEPTANCE OF AUTOMATIC INSTALLATION OF FIRE ALARM
__________________________________________________________________ (name of installation) mounted in _________________________________________________ (name of building, premises, structure) included in ________________________________________________ (name of power enterprise, its line, start-up complex) Gor. _____________________________ "__" __________________ 199_ The commission appointed by ____________________________________________ __________________________________________________________________ (name of the customer organization that appointed the commission) by Order dated "__" _______ 199_ N _______ consisting of: Chairman _____________________________________________________ (full name, position) members of the commission _________________________________________________ (full name, position) of representatives of involved organizations ________________________________ __________________________________________________________________ (full name, position, organization) inspected the installation and checked the installation, adjustment work performed by _______________________________________________ (name of the installation, adjustment organization) and drew up this act about the following: 1. The installation completed by installation and commissioning was presented for acceptance: _____________________________________________ _____________________ (list of installed equipment and its brief _________________________________________________________________ technical characteristics) 2. Installation, adjustment work was carried out according to the project _________ __________________________________________________________________ (name of the design organization, drawing numbers __________________________________________________________________ and the date of their preparation) 3. Date of commencement of installation, adjustment work ___________________ 4. Date of completion of installation , commissioning works ________________ 5. The commission carried out the following additional tests and trials of the installation (except for tests and trials recorded in the executive documentation submitted by the general contractor): __________________________________________________________________ listed in Annex N __________________________________ 7. List of acceptance documentation attached to the act: __________________________________________________________________
Commission decision
Works on installation, adjustment of the submitted installation are carried out in accordance with the project, standards, building codes and regulations, current technical conditions and meet the requirements for its acceptance for testing. The AUPS presented for acceptance, specified in paragraph 1 of this Act, is considered accepted from ________________ 199_ for testing __________________________________________________ with an assessment of the quality of the work performed _____________________________ (good, excellent, __________________________________________________________________ satisfactory)
Chairman of the commission ________________________ (signature) Representatives of involved organizations __________________________________ (signatures)
Handed over: Accepted: representatives of the general representatives of the customer contractor and subcontractor organizations __________________________ _______________________ (signatures) (signatures)
Conclusion on the results of testing the installation
The installation specified in paragraph 1 of this act was tested ______________________________________________________ from "__" ___________ 199_ to "__" ___________ 199_ for ____________ hours, days in accordance with the procedure established by the customer. The installation that has passed the testing, ____________________________ is considered ready for operation and accepted from "__" __________ 199_ with an assessment of the quality of the installation and commissioning work performed at _______________________________________________________________ (excellent, good, satisfactory) Defects identified during the testing process that do not interfere with the operation of the facility are subject to elimination organizations within the time limits specified in Appendix N __________ to this act.
Chairman of the commission ________________________ (signature) Members of the commission _______________________________ (signatures) Representatives of involved organizations __________________________________ (signatures)
In construction, the input inspection of the equipment being installed plays an important role. The input survey is the study of the qualitative characteristics of the goods received by the customer for its further use. The results of the examination are displayed in the act.
The document is drawn up and approved within 3 days after the examination of the arrived products. The act is signed by all members of the commission. The essence of the survey is to identify information about the condition of the goods and compare them with the parameters of regulatory documents. Based on the results of the survey, a conclusion is written on the compliance of products with standards and data is entered into the register. In the accompanying documents, the results of the survey are noted and labeling is performed. If the product meets the required parameters, it is sent for production. The defective item is returned to the supplier.
What is the purpose of an entrance examination? This event is carried out to check the quality of the supplied goods, which are intended for further use in a particular production. When equipment or materials arrive at the enterprise, the external condition of the received products is inspected, the compliance of the technical characteristics with the design documents is checked, and an appropriate protocol is drawn up. On the basis of such an accompanying protocol, equipment is received and put into operation. The information displayed in the act is recorded in a log, which must be present on each construction site. The log displays the name and number of arrived items per construction site.
The entrance examination can be:
The following persons are authorized to carry out an inspection at the entrance:
The act can be drawn up by specialists of the receiving party - an engineer, a foreman or a head of a department. To prevent bias towards the completed act, a special commission is created, consisting of two or more representatives.
Incoming equipment must be inspected and tested. After the examination, an act is filled in, showing the conformity of the goods with the requirements and signed by all members of the commission.
If the goods are found to be defective, this is recorded in the act, and a claim is sent to the supplier with the accompanying documents attached. Further actions are carried out in accordance with the contract for the supply of goods between the supplier and the recipient or existing legislation.
There is no standard form for drawing up an act. The document is filled out in free form or on the basis of a sample developed by the institution. The act is usually drawn up on an A4 sheet. Before the start of control, a set of accompanying documents is checked. If some of these documents are missing, the commission has the right to postpone the entrance examination.
Mandatory data required to fill out the act:
The document is created in one copy.
The information displayed in the acts must be recorded in a journal that displays the following:
When a marriage is detected, it is required to display each defective element in the act. Defective goods are sent to the supplier with accompanying documents attached. Such documents may include:
Below is an example of a packing list.
The main standards that must be followed when drawing up an act are GOST 24297-87 "Incoming control of products", which displays instructions for organizing the survey and displaying the results of the test. Articles 704, 713 and 745 of the Civil Code of the Russian Federation regulate that it is allowed to use materials from both the customer and the contractor in construction.
The purpose of the entrance survey is as follows:
Control is carried out in two stages:
Examination procedure:
An example of a completed act is shown below.
The execution of an act on the commissioning of equipment occurs whenever new equipment comes to the enterprise, since from the moment it arrives, it becomes necessary to record the beginning of its use and enter it into accounting as fixed assets.
FILES
If the equipment requires any tests and checks, then before drawing up this act, all such procedures must be carried out and completed.
As a rule, new equipment is checked for defects, flaws, marriage, malfunctions, as well as whether it complies with the norms and standards adopted by the enterprise, labor protection and fire safety requirements.
All these procedures are carried out by a specially created commission, consisting of at least two people, which is appointed by a separate order by the head of the organization.
This document does not have a unified, mandatory form, so it can be drawn up both in free form and according to a template developed and approved within the enterprises. The act can be written on a regular sheet of A4 format, or on the letterhead of the organization.
It must necessarily include information about the enterprise where the equipment is put into operation, as well as detailed information about its name, technical characteristics, conditions of use, etc. The more complex the equipment, the more detailed information about it needs to be prescribed and the more points the act may contain.
This document should indicate the compliance of the equipment being introduced with the internal requirements of the organization and the standards of the law, as well as the presence of comments or identified malfunctions. If the facts of marriage are confirmed, then a special certificate must be drawn up for the equipment and until the defects are eliminated, the equipment cannot be put into operation.
It should be remembered that after the signing of the act of putting the equipment into operation, the manufacturer's warranty begins to apply to it.
In conclusion, in this part, a separate paragraph should be summarized that the equipment has passed the test and is ready for operation.
The penultimate part of the document contains conclusions on the entire above procedure. If there are no complaints about the equipment, then it must be entered here that the equipment is put into operation from such and such a date at such and such an address (the address of the enterprises where it will be used is indicated).
If there are complaints, then you should write "not ready for use until the identified defects are eliminated." Next, you need to make a clause about warranty service.
After entering all the information into the act, links to all annexes to it with numbers and dates are entered.
The act must be certified by the signatures of the inspection commission. The document can also be certified with a seal, but not necessarily, since since 2016, the presence of a seal for legal entities is not a legal requirement, but is voluntary.
The act of incoming control is a document by which the customer confirms the quality of the feedstock. It confirms the implementation of the incoming control procedure, which makes it possible to ensure the quality of products manufactured by the customer.
To receive finished products, manufacturing companies need to conclude contracts with suppliers and provide themselves with raw materials, building products and other materials. The customer, accepting the order shipped by the supplier, conducts input control and confirms the compliance of the quality of raw materials with the standards, drawing up a special document - an act on the input control.
Incoming control and execution of an incoming control act is an obligatory part of the technological process. This is a guarantee that the customer will use high-quality raw materials and materials in the manufacture of his products and, subject to the technology, will be able to ensure that they comply with quality standards.
Incoming control of products accepted by the Quality Control Department and representatives of the customer must be carried out in any case, even if compliance with the standards of raw materials and materials supplied under the contract is confirmed by the accompanying documents. In the interests, first of all, of the customer himself, to carry out such a check and confirm the compliance of the supplied materials with the standards, he will draw up an act of incoming control.
The receiving specialist, who, when drawing up the act of incoming control, confirmed that the quality of the supplied raw materials, products or materials complies with the established standards, is also obliged to make an entry about this in special magazine input control. This record is a confirmation of the fact that the supplier's products have been checked, information about it and its quality is also entered into it.
If the quality of the raw material is confirmed by the act on the input control, it, by the decision of the receiver, is transferred for further use in production processes. In the event that during the input control it was revealed that the supplied materials did not comply with the standards, the raw materials are marked as defective and a complaint is filed with the supplier company.
Before drawing up an act of incoming control, the supplied raw materials, materials or products must undergo an inspection or test - incoming control.
Input control can be carried out in one of three ways:
Input control is carried out by a commission consisting of several people. In addition to the representatives of the customer, a representative of the supplier should also be included in it. It is allowed to include in the composition of the commission independent experts who have the necessary equipment and a license to conduct tests and such examinations.
Primary incoming control is carried out upon acceptance of the delivery:
As a rule, the procedure for further input control consists of several stages:
The company needs to develop local regulation, instructions or guidelines governing the conduct of input control and execution of an input control act. The document should establish the methods used and the procedure for conducting control tests, define a list of parameters that must be checked for compliance with the standards.
In addition, methodological guidelines or a local act must approve the form of the input control act. There is no unified form for this document, therefore, the employer can draw it up independently, taking into account the specifics of the production activity of the enterprise and the supplied raw materials and materials.
When developing the form of the input control act, it is necessary to reflect in it all the information that will allow you to get a complete picture of the procedure and results of the input control. Representatives of suppliers, inspectors, members of the commission conducting incoming control can be involved in the preparation of the form. In this case, it will be possible to avoid claims to the form of the incoming control act and take into account all the nuances of processing procedural issues.
Since the form of the input control act is not regulated by GOST, one should approach its preparation with particular responsibility and try to reflect all the necessary information in it, including:
In addition, in the act of incoming control, it is necessary to provide columns that will reflect data on the quality compliance tests carried out:
The act of input control, a sample is presented below.
The certificate of input control is filled out by specialists who took part in the acceptance of the delivered products. In addition to the representative of the supplier, this may be a process engineer, site foreman or head of a department. It must be signed by all members of the acceptance committee.
When filling out the act of incoming control, it is necessary to pay special attention to ensure that the technical information and labeling of products and materials coincide with those indicated in the accompanying documentation. If discrepancies are found, it is considered that the products do not meet the technical requirements and standards. In this case, the commission has the right to draw up an act on the incompleteness of the delivery or qualify it as defective products by filing complaints with the supplier.
In the event that a marriage is revealed as a result of the input control, this should also be reflected in the input control act.
As a rule, from the moment the product is accepted and the act of incoming control is signed, the warranty period begins, which is set by the supplier of products or materials.
The act of input control sample filling is presented below.