  • foundation plan;
  • roofing design;
  • rafter plan;
  • wall sweeps;
  • specification of components;
  • knots, details.

2.1. Foundation device:
  • Pile metal foundation below the freezing depth with pouring concrete piles. Metal piles D = 108mm with a step of 2.5-3m > with a laying depth below the freezing depth.
2.3. Installation of external and internal load-bearing walls from a frame with a section of 140x35 mm with additional insulation of 50 mm and internal partitions 90x35 mm treated with NEOMID antiseptic:
  • The frame with a section of 140x35 mm is dry planed, with a device for overlapping insulation 50 mm, with a hydro-wind protection device on the outside, with an outer sheathing imitation of a bar 145x20 mm.
2. Optimal equipment

More about packaging

1. Development of project documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roofing design;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • specification of joinery products;
  • wall sweeps;
  • specification of components;
  • knots, details.

2. Construction and installation works at the facility:

2.1. Foundation device:
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical report based on the results of a soil survey.
2.2. Basement installation:
  • The basement floor is made of wooden beams with a section of 200x50 mm with a 25x100 mm subfloor, with a 150 mm insulation and a vapor barrier and hydro-wind protection device. The floors are made of dry planed tongue-and-groove boards 28 mm.
  • Frame with a section of 140x35 mm, dry planed with a ventilation gap, and filled with mineral wool insulation 200 mm., Vapor-tight membrane, on the inside of the room and hydro-wind protection on the outside, and cladding on the outside and inside with an imitation of timber 145x20 mm. The device of partitions from a bar with a section of 90x35 mm, filled with mineral wool insulation 100 mm.
2.4. Interfloor device:
  • Interfloor overlapping is carried out on wooden beams with a section of 200x50 mm, section and steps in accordance with the project, with a 150 mm insulation. and a vapor barrier and hydrowind protection device. The floors are made of dry planed tongue-and-groove boards 28 mm. Eurolining ceilings 12.5mm on the 1st floor.
2.5. Installation of the truss system and installation of metal roofing:
2.6. Joinery installation:
  • Installation in the openings of plastic windows 60 mm with a tilt-and-turn mechanism and two-chamber double-glazed windows, fittings, white;
  • Installation of an entrance external door.
2.7. Installation of a temporary interfloor staircase:
  • An internal interfloor wooden staircase with steps, without risers, with a railing and railings is made of planed softwood.
3. Equipment Comfort

More about packaging

1. Development of project documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roofing design;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • specification of joinery products;
  • wall sweeps;
  • specification of components;
  • knots, details.

2. Construction and installation works at the facility:

2.1. Foundation device:
  • The foundation is piled with a monolithic grillage with a reinforced section of 250 x 400 mm, made of concrete grade B22.5 (M300) with general reinforcement with reinforcement AIII ø 12 in the longitudinal direction and transverse and vertical lintels with reinforcement AIII ø 12 with a step of 400 mm. with a device for ventilation; reinforced concrete piles with a diameter of 250 mm with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical report based on the results of a soil survey.
2.2. Basement installation:
  • The basement floor is made of wooden beams with a section of 200x50 mm with a 25x100 mm subfloor, with a 200 mm insulation and a vapor barrier and hydrowind protection device. The floors are made of dry planed tongue-and-groove boards 36 mm.
2.3. Installation of external and internal load-bearing walls from a frame with a section of 140x35 mm with additional insulation of 50 mm and internal partitions 90x35 mm treated with NEOMID antiseptic:
  • Frame with a section of 140x35 mm, dry planed with a ventilation gap device, and filled with a 200 mm mineral wool insulation, a vapor-tight membrane, on the inside of the room and hydro-wind protection on the outside, and lining on the outside and inside with an imitation of a bar 145x20 mm. Arrangement of partitions from a bar with a section of 90x35 mm , filled with mineral wool insulation 100 mm, lined with imitation timber 145x20 mm.
2.4. Interfloor device:
2.6. Joinery installation:
  • Installation in the openings of plastic windows 60 mm with a tilt-and-turn mechanism and two-chamber double-glazed windows, fittings, white;
  • Installation of an entrance external door.
2.7. Installation of a temporary interfloor staircase:
  • An internal interfloor wooden staircase with steps, without risers, with a railing and railings is made of planed softwood.
1. Basic equipment

An excellent option for those who today are limited by finances, but unlimited by opportunities. By choosing this package, you can do the finishing yourself or order it later with a more favorable financial situation!

More about packaging

1. Development of project documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roofing design;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • specification of joinery products;
  • wall sweeps;
  • specification of components;
  • knots, details.

2. Construction and installation works at the facility:

2.1. Foundation device:
  • The foundation is piled with a monolithic grillage with a reinforced section of 250 x 400 mm, made of concrete grade B22.5 (M300) with general reinforcement with reinforcement AIII ø 12 in the longitudinal direction and transverse and vertical lintels with reinforcement AIII ø 12 with a step of 400 mm. with a device for ventilation; reinforced concrete piles with a diameter of 250 mm with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical report based on the results of a soil survey.
2.2. Basement installation:
  • The basement ceiling is made of wooden beams with a section of 200x50 mm.

Assembly of a ready-made wall kit from glued laminated timber with a section of 140x180 mm, manufactured at the enterprise, including:

2.4. Interfloor device:
  • Interfloor overlapping is carried out on wooden beams, section and steps in accordance with the project section 200x50 mm.
  • This stage includes the installation of a wooden rafter system, a bar with a section of 200x50 mm, with a hydro-wind protection device.
  • The roofing is made of metal tiles along a 40x40 mm bar with ventilation of the under-roof space, which excludes the formation of condensate and ensures compliance with SNiP.
2.6. Joinery installation:
  • Installation in the openings of plastic windows 60 mm with a tilt-and-turn mechanism and two-chamber double-glazed windows, fittings, white;
  • Installation of an entrance external door.
2.7. Installation of a temporary interfloor staircase:
  • An internal interfloor wooden staircase with steps, without risers, with a railing and railings is made of planed softwood.
2. Optimal equipment

An ideal option for those who want to get a ready-to-live-in home for reasonable money! The best price-quality option, in this configuration you will get a noble aesthetic appearance, comfort and ease of use.

More about packaging

1. Development of project documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roofing design;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • specification of joinery products;
  • wall sweeps;
  • specification of components;
  • knots, details.

2. Construction and installation works at the facility:

2.1. Foundation device:
  • The foundation is piled with a monolithic grillage with a reinforced section of 250 x 400 mm, made of concrete grade B22.5 (M300) with general reinforcement with reinforcement AIII ø 12 in the longitudinal direction and transverse and vertical lintels with reinforcement AIII ø 12 with a step of 400 mm. with a device for ventilation; reinforced concrete piles with a diameter of 250 mm with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical report based on the results of a soil survey.
2.2. Basement installation:
2.3. Installation of external and internal walls from factory parts of glued beams:

Assembly of a ready-made wall kit from glued laminated timber with a section of 140x180 mm, manufactured at the enterprise, including:

  • Primary antiseptic treatment of timber by dipping;
  • 100% prefabricated according to the size of a set of beam parts with cut mounting grooves that provide fixation of the beam in two directions, marked according to the project, as well as a control assembly of the kit on the covered area of ​​the plant to assess the quality.
  • The assembly of the crowns of the house is carried out on round wooden dowels (birch) with double insulation with lnovatin, using tie rods and clamping screws according to the project, installation of wooden casing structures for installing window and wooden blocks.
2.4. Interfloor device:
2.5. Installation of the truss system and installation of a roof made of metal tiles:
  • This stage includes the installation of a wooden rafter system, a bar with a section of 200x50 mm, with a hydro-wind protection device.
  • The roofing is made of metal tiles along a 40x40 mm bar with ventilation of the under-roof space, which excludes the formation of condensate and ensures compliance with SNiP.
2.6. Joinery installation:
  • Installation in the openings of plastic windows 60 mm with a tilt-and-turn mechanism and two-chamber double-glazed windows, fittings, white;
  • Installation of an entrance external door.
2.7. Installation of a temporary interfloor staircase:
  • An internal interfloor wooden staircase with steps, without risers, with a railing and railings is made of planed softwood.
3. Equipment Comfort

Turnkey construction of a country house for comfortable living using only the best, environmentally friendly finishing materials of the highest quality in order to emphasize the status of your home.

More about packaging

1. Development of project documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roofing design;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • specification of joinery products;
  • wall sweeps;
  • specification of components;
  • knots, details.

2. Construction and installation works at the facility:

2.1. Foundation device:
  • The foundation is piled with a monolithic grillage with a reinforced section of 250 x 400 mm, made of concrete grade B22.5 (M300) with general reinforcement with reinforcement AIII ø 12 in the longitudinal direction and transverse and vertical lintels with reinforcement AIII ø 12 with a step of 400 mm. with a device for ventilation; reinforced concrete piles with a diameter of 250 mm with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical report based on the results of a soil survey.
2.2. Basement installation:
2.3. Installation of external and internal walls from factory parts of glued beams:

Assembly of a ready-made wall kit from glued laminated timber with a section of 190x210 mm, manufactured at the enterprise, including:

  • Primary antiseptic treatment of timber by dipping;
  • 100% prefabricated according to the size of a set of beam parts with cut mounting grooves that provide fixation of the beam in two directions, marked according to the project, as well as a control assembly of the kit on the covered area of ​​the plant to assess the quality.
  • The assembly of the crowns of the house is carried out on round wooden dowels (birch) with double insulation with lnovatin, using tie rods and clamping screws according to the project, installation of wooden casing structures for installing window and wooden blocks.
2.4. Interfloor device:
  • Interfloor overlapping is carried out on wooden beams with a section of 200x50 mm, section and steps in accordance with the project, with the laying of a heater of 200 mm. and a vapor barrier and hydrowind protection device. The floors are made of dry planed tongue-and-groove boards 36 mm. Ceilings with an imitation of timber 145x20 mm on the 1st floor.
2.5. Installation of the truss system and installation of a roof made of metal tiles:
  • This stage includes the installation of a wooden truss system with a beam section of 200x50 mm, insulated with 200 mm thick basalt insulation, with a vapor barrier and hydro-wind protection.
  • The roofing is made of soft tile Shinglas ("SHINGLAS") on a solid flooring of oriented strand board (OSB) 9 mm with ventilation of the under-roof space with a bar with a section of 40x40 mm, which excludes the formation of condensate and ensures compliance with SNiP.
  • Hemming the overhangs with a STIHL clapboard, 14 mm thick.
2.6. Joinery installation:
  • Installation in the openings of plastic windows 60 mm with a tilt-and-turn mechanism and two-chamber double-glazed windows, fittings, white;
  • Installation of an entrance external door.
2.7. Installation of a temporary interfloor staircase:
  • An internal interfloor wooden staircase with steps, without risers, with a railing and railings is made of planed softwood.
1. Basic equipment

An excellent option for those who today are limited by finances, but unlimited by opportunities. By choosing this package, you can do the finishing yourself or order it later with a more favorable financial situation!

More about packaging

1. Development of project documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roofing design;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • specification of joinery products;
  • wall sweeps;
  • specification of components;
  • knots, details.

2. Construction and installation works at the facility:

2.1. Foundation device:
  • Pile metal foundation below the freezing depth with pouring concrete piles. Metal piles D = 108mm with a step of 2.5-3m with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical report based on the results of a soil survey.
2.2. Basement installation:
  • The basement ceiling is made of wooden beams with a section of 200x50 mm.
  • Primary antiseptic treatment of timber by dipping;
  • The assembly of the crowns of the house is carried out on round wooden dowels (birch) with double insulation with lnovatin, using tie rods and clamping screws according to the project, installation of wooden casing structures for installing window and wooden blocks.
2.4. Interfloor device:
  • Interfloor overlapping is carried out on wooden beams, section and steps in accordance with the project section 200x50 mm.
2.5. Installation of the truss system and installation of a roof made of metal tiles:
  • This stage includes the installation of a wooden rafter system, a bar with a section of 200x50 mm, with a hydro-wind protection device.
  • The roofing is made of metal tiles along a 40x40 mm bar with ventilation of the under-roof space, which excludes the formation of condensate and ensures compliance with SNiP.
2.6. Joinery installation:
  • Installation in the openings of plastic windows 60 mm with a tilt-and-turn mechanism and two-chamber double-glazed windows, fittings, white;
  • Installation of an entrance external door.
2.7. Installation of a temporary interfloor staircase:
  • An internal interfloor wooden staircase with steps, without risers, with a railing and railings is made of planed softwood.
2. Optimal equipment

An ideal option for those who want to get a ready-to-live-in home for reasonable money! The best price-quality option, in this configuration you will get a noble aesthetic appearance, comfort and ease of use.

More about packaging

1. Development of project documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roofing design;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • specification of joinery products;
  • wall sweeps;
  • specification of components;
  • knots, details.

2. Construction and installation works at the facility:

2.1. Foundation device:
  • The foundation is piled with a monolithic grillage with a reinforced section of 250 x 400 mm, made of concrete grade B22.5 (M300) with general reinforcement with reinforcement AIII ø 12 in the longitudinal direction and transverse and vertical lintels with reinforcement AIII ø 12 with a step of 400 mm. with a device for ventilation; reinforced concrete piles with a diameter of 250 mm with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical report based on the results of a soil survey.
2.2. Basement installation:
  • The basement ceiling is made with wooden beams with a section of 200x50 mm with a subfloor 25x100 mm along a cranial beam 50x50 mm, with a 150 mm insulation and a vapor barrier and hydro-wind protection device. The floors are made of dry planed tongue-and-groove boards 36 mm.
2.3. Installation of external and internal walls from factory parts of profiled timber:

Assembly of a ready-made wall kit from a profiled beam with a section of 145x145 mm, made including:

  • Preparation of timber for the manufacture of parts - its chamber drying of the timber;
  • Primary antiseptic treatment of timber by dipping;
  • 100% prefabrication according to the size of the kit with pre-cut mounting grooves, marked according to the project, as well as the control assembly of the kit on the covered area of ​​​​the factory to assess the quality.
  • The assembly of the crowns of the house is carried out on round wooden dowels (birch) with double insulation with lnovatin, using tie rods and clamping screws according to the project, installation of wooden casing structures for installing window and wooden blocks.
2.4. Interfloor device:
  • Interfloor overlapping is carried out on wooden beams with a section of 200x50 mm, section and steps in accordance with the project, with the laying of a heater of 200 mm. and a vapor barrier and hydrowind protection device. The floors are made of dry planed tongue-and-groove boards 36 mm. Eurolining ceilings 12.5mm on the 1st floor.
2.5. Installation of the truss system and installation of a roof made of metal tiles:
  • This stage includes the installation of a wooden truss system with a beam section of 200x50 mm, insulated with mineral wool 200 mm thick, with a vapor barrier and hydro-wind protection.
  • The roofing is made of metal tiles on a bar 40 * 40 with ventilation of the under-roof space, which excludes the formation of condensate and ensures compliance with SNiP.
2.6. Joinery installation:
  • Installation in the openings of plastic windows 60 mm with a tilt-and-turn mechanism and two-chamber double-glazed windows, fittings, white;
  • Installation of an entrance external door.
2.7. Installation of a temporary interfloor staircase:
  • An internal interfloor wooden staircase with steps, without risers, with a railing and railings is made of planed softwood.
3. Equipment Comfort

Turnkey construction of a country house for comfortable living using only the best, environmentally friendly finishing materials of the highest quality in order to emphasize the status of your home.

More about packaging

1. Development of project documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roofing design;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • specification of joinery products;
  • wall sweeps;
  • specification of components;
  • knots, details.

2. Construction and installation works at the facility:

2.1. Foundation device:
  • The foundation is piled with a monolithic grillage with a reinforced section of 250 x 400 mm, made of concrete grade B22.5 (M300) with general reinforcement with reinforcement AIII ø 12 in the longitudinal direction and transverse and vertical lintels with reinforcement AIII ø 12 with a step of 400 mm. with a device for ventilation; reinforced concrete piles with a diameter of 250 mm with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical report based on the results of a soil survey.
2.2. Basement installation:
  • A monolithic reinforced concrete slab reinforced in several rows with a thickness of 150 mm corrugated board, with a waterproofing device (Gidroizol), insulation with 150 mm extruded polystyrene foam and a reinforced screed with a thickness of 50 mm. for laying tiles, laminate, etc.
2.3. Installation of external and internal walls from factory parts of profiled timber:

Assembly of a finished wall kit from a profiled beam with a section of 190x190 mm, made including:

  • Preparation of timber for the manufacture of parts - its chamber drying of the timber;
  • Primary antiseptic treatment of timber by dipping;
  • 100% prefabrication according to the size of the kit with pre-cut mounting grooves, marked according to the project, as well as the control assembly of the kit on the covered area of ​​​​the factory to assess the quality.
  • The assembly of the crowns of the house is carried out on round wooden dowels (birch) with double insulation with lnovatin, using tie rods and clamping screws according to the project, installation of wooden casing structures for installing window and wooden blocks.
2.4. Interfloor device:
  • Interfloor overlapping is carried out on wooden beams with a section of 200x50 mm, section and steps in accordance with the project, with the laying of a heater of 200 mm. and a vapor barrier and hydrowind protection device. The floors are made of dry planed tongue-and-groove boards 36 mm. Eurolining ceilings 12.5mm on the 1st floor.
2.5. Installation of the truss system and installation of a roof made of soft tiles Shinglas ("SHINGLAS"):
  • This stage includes the installation of a wooden truss system with a beam section of 200x50 mm, insulated with 200 mm thick basalt insulation, with a vapor barrier and hydro-wind protection.
  • The roofing is made of soft tile Shinglas ("SHINGLAS") on a solid flooring of oriented strand board (OSB) 9 mm with ventilation of the under-roof space with a bar with a section of 40x40 mm, which excludes the formation of condensate and ensures compliance with SNiP.
  • Hemming the overhangs with a STIHL clapboard, 14 mm thick.
2.6. Joinery installation:
  • Installation in the openings of plastic windows 60 mm with a tilt-and-turn mechanism and two-chamber double-glazed windows, fittings, white;
  • Installation of an entrance external door.
2.7. Installation of a temporary interfloor staircase:
  • An internal interfloor wooden staircase with steps, without risers, with a railing and railings is made of planed softwood.
1. Basic equipment

An excellent option for those who today are limited by finances, but unlimited by opportunities. By choosing this package, you can do the finishing yourself or order it later with a more favorable financial situation!

More about packaging

1. Development of project documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roofing design;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • specification of joinery products;
  • wall sweeps;
  • specification of components;
  • knots, details.

2. Construction and installation works at the facility:

2.1. Foundation device:
  • The foundation is piled with a monolithic grillage with a reinforced section of 250 x 400 mm, made of concrete grade B22.5 (M300) with general reinforcement with reinforcement AIII ø 12 in the longitudinal direction and transverse and vertical lintels with reinforcement AIII ø 12 with a step of 400 mm. with a device for ventilation; reinforced concrete piles with a diameter of 250 mm with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical report based on the results of a soil survey.
2.2. Basement installation:
  • The basement ceiling is made of wooden beams with a section of 200x50 mm.
2.4. Interfloor device:
  • Interfloor overlapping is carried out on wooden beams, section and steps in accordance with the project section 200x50 mm.
2.5. Installation of the truss system and installation of a roof made of metal tiles:
  • This stage includes the installation of a wooden rafter system, a bar with a section of 200x50 mm, with a hydro-wind protection device.
  • The roofing is made of metal tiles along a 40x40 mm bar with ventilation of the under-roof space, which excludes the formation of condensate and ensures compliance with SNiP.
2.6. Joinery installation:
  • Installation in the openings of plastic windows 60 mm with a tilt-and-turn mechanism and two-chamber double-glazed windows, fittings, white;
  • Installation of an entrance external door.
2.7. Installation of a temporary interfloor staircase:
  • An internal interfloor wooden staircase with steps, without risers, with a railing and railings is made of planed softwood.
  • specification of joinery products;
  • wall sweeps;
  • specification of components;
  • knots, details.

2. Construction and installation works at the facility:

2.1. Foundation device:
  • The foundation is piled with a monolithic grillage with a reinforced section of 250 x 400 mm, made of concrete grade B22.5 (M300) with general reinforcement with reinforcement AIII ø 12 in the longitudinal direction and transverse and vertical lintels with reinforcement AIII ø 12 with a step of 400 mm. with a device for ventilation; reinforced concrete piles with a diameter of 250 mm with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical report based on the results of a soil survey.
2.2. Basement installation:
  • Monolithic reinforced concrete slab 150 mm thick reinforced in several rows with corrugated board.
2.3. Installation of external and internal walls from aerated concrete blocks 300 mm thick:
  • Assembly of load-bearing external and internal walls from aerated concrete blocks 625x250x300 mm, and internal partitions from aerated concrete blocks 625x250x100 mm density D500, assembly with glue with laying masonry mesh in rows, with reinforced monolithic belts of interfloor ceilings and lintels;
  • Installation of a decorative plaster facade with additional insulation 30 mm, CERESIT VWS INSULATION SYSTEMS BASED ON POLYSTEROL FOAM texture “bark beetle” 2.5 mm, Plaster Ceresit ST 35 “bark beetle” 2.5 mm color white.
2.4. Interfloor device:
2.5. Installation of the truss system and installation of a roof made of metal tiles:
  • This stage includes the installation of a wooden truss system with a beam section of 200x50 mm, insulated with mineral wool 200 mm thick, with a vapor barrier and hydro-wind protection.
  • The roofing is made of metal tiles on a bar 40 * 40 with ventilation of the under-roof space, which excludes the formation of condensate and ensures compliance with SNiP.
2.6. Joinery installation:
  • Installation in the openings of plastic windows 60 mm with a tilt-and-turn mechanism and two-chamber double-glazed windows, fittings, white;
  • Installation of an entrance external door.
2.7. Installation of a temporary interfloor staircase:
  • An internal interfloor wooden staircase with steps, without risers, with a railing and railings is made of planed softwood.
3. Equipment Comfort

Turnkey construction of a country house for comfortable living using only the best, environmentally friendly finishing materials of the highest quality in order to emphasize the status of your home.

More about packaging

1. Development of project documentation:

  • floor plans, facades, sections, axonometric 3D views;
  • foundation plan;
  • roofing design;
  • layout plan for basement beams;
  • layout plan for interfloor beams;
  • rafter plan;
  • specification of joinery products;
  • wall sweeps;
  • specification of components;
  • knots, details.

2. Construction and installation works at the facility:

2.1. Foundation device:
  • The foundation is piled with a monolithic grillage with a reinforced section of 250 x 400 mm, made of concrete grade B22.5 (M300) with general reinforcement with reinforcement AIII ø 12 in the longitudinal direction and transverse and vertical lintels with reinforcement AIII ø 12 with a step of 400 mm. with a device for ventilation; reinforced concrete piles with a diameter of 250 mm with a laying depth below the freezing depth.
  • Under special conditions and a separate need for construction, the type of foundation is determined in accordance with the technical report based on the results of a soil survey.
2.2. Basement installation:
  • A monolithic reinforced concrete slab reinforced in several rows with a thickness of 150 mm corrugated board, with a waterproofing device (Gidroizol), insulation with 150 mm extruded polystyrene foam and a reinforced screed with a thickness of 50 mm. for laying tiles, laminate, etc.
2.3. Installation of external and internal walls from aerated concrete blocks 300 mm thick:
  • Assembly of load-bearing external and internal walls from aerated concrete blocks 625x250x300 mm, and internal partitions from aerated concrete blocks 625x250x100 mm density D500, assembly with glue with laying masonry mesh in rows, with reinforced monolithic belts of interfloor ceilings and lintels.
  • Installation of a decorative plaster facade with additional insulation 100 mm, CERESIT VWS INSULATION SYSTEMS BASED ON POLYSTEROL FOAM texture “bark beetle” 3.5 mm, Plaster Ceresit ST 35 “bark beetle” 3.5 mm color white.
2.4. Interfloor device:
  • The interfloor ceiling is a monolithic reinforced concrete slab reinforced in several rows with a thickness of 150 mm corrugated board.
2.5. Installation of the truss system and installation of a roof made of soft tiles Shinglas ("SHINGLAS"):
  • This stage includes the installation of a wooden truss system with a beam section of 200x50 mm, insulated with 200 mm thick basalt insulation, with a vapor barrier and hydro-wind protection.
  • The roofing is made of soft tile Shinglas ("SHINGLAS") on a solid flooring of oriented strand board (OSB) 9 mm with ventilation of the under-roof space with a bar with a section of 40x40 mm, which excludes the formation of condensate and ensures compliance with SNiP.
  • Hemming the overhangs with a STIHL clapboard, 14 mm thick.
2.6. Joinery installation:
  • Installation in the openings of plastic windows 60 mm with a tilt-and-turn mechanism and two-chamber double-glazed windows, fittings, white;
  • Installation of an entrance external door.
2.7. Installation of a temporary interfloor staircase:
  • An internal interfloor wooden staircase with steps, without risers, with a railing and railings is made of planed softwood.


"Fairy Tale" - the best home for permanent residence. The area of ​​the house is 66.43 sq. m., and its dimensions are 5 by 7. A distinctive feature of the house is the attic.

Our company will be happy to build a house according to this project. The total cost of building a house depends on the configuration. Additionally, we are ready to redevelop the project for free or build a house according to any of your projects or sketches.

The cost of construction may differ slightly from that posted on the site.

Equipment options

Complete set of frame houses

Foundation

Pile-screw

Tape

  • Sand cushion: 300mm

Power frame

  • Frame strapping: timber 150 * 150 mm
  • Vertical racks from planed boards of chamber drying (14-18% humidity), 1 grade, 150*50 mm
  • Rack pitch no more than 580 mm, using a reinforced mounting system and additional protection of the frame from "cold bridges"
  • To protect the frame: the outer side is a four-layer diffusion membrane, the inner side is a three-layer polyethylene film

Interior partitions

  • Vertical racks made of planed chamber-drying boards (14-18% humidity), 1st grade, 100*50 mm.
  • On both sides of the frame racks are mounted with a vapor-permeable membrane Izospan.

Internal load-bearing walls and partitions

Thermal insulation from environmentally friendly slab basalt insulation ROCKWOOL LIGHT BATTS or Paroc EXTRA

  • External walls - in 3 layers (150 mm).
  • Interior partitions - in 2 layers (100 mm)
  • Interfloor ceilings - in 2 layers (100 mm)
  • Attic floor (ceiling of the second floor) - in 3 layers (150 mm)

Roof - metal tile

  • Steel thickness: 0.5mm
  • Assorted colors

Exterior finish of the facade

  • (Egger/Kalevala, class E1)

Interior wall decoration

Moisture resistant board OSB-3, 2500*1250*9 mm

Window

  • Profile thickness 70mm
  • Fittings: ROTO NT

Complete set of block houses

Foundation

  • Sand cushion: 400mm
  • High-strength rebar d12 mm class AIII
  • Prefabricated concrete, grade M300 (B22.5)

Double waterproofing of the foundation is used.

Domokomplekt

Basement and interfloor ceilings

External and internal bearing walls

All wooden structures are antiseptic in two layers, with a special fire-bio protective compound. The load-bearing frame of the house is mounted using a galvanized double-reinforced fastening system.

Roof - metal tile

  • Cover: polyester, with 15 years quality guarantee
  • First class galvanizing - 275 g/sq.m.
  • Steel thickness: 0.5mm
  • Assorted colors
  • Reinforced truss system from a board 200 * 50 mm, grade 1, with a step of 580 mm

Window

  • PVC window structures REHAU SIB-Design, standard sizes
  • Profile thickness 70 mm
  • 2-chamber double-glazed window (3 glasses), 5-chamber profile (white color), mosquito nets
  • Fittings: ROTO NT

Complete set of brick houses

Foundation

Tape monolithic heavily reinforced pile-grillage

  • Plinth height 600 mm, band width 400 mm
  • Bored reinforced piles with a diameter of 200 mm, a depth of 2000 mm
  • Sand cushion: 400mm
  • High-strength rebar d12 mm class AIII
  • Prefabricated concrete, grade M300 (B22.5)

Double waterproofing of the foundation is used.

Domokomplekt

Basement and interfloor ceilings

  • Reinforced basement and interfloor floor joists are made of board 50*200 mm, with a step of no more than 580 mm
  • Mounted draft floor of the first floor

External and internal bearing walls

  • External load-bearing walls made of aerated concrete (gas silicate) blocks, 300 mm thick (possibly 375 mm). Density D500
  • Internal load-bearing walls made of aerated concrete (gas silicate) blocks, 300 mm thick (possibly 375 mm). Density D500
  • Masonry reinforcement every three rows
  • Aerated concrete (gas silicate) blocks are placed on a special masonry adhesive
  • Decorated window and door openings
  • The device of brick reinforced belts for floors

All wooden structures are antiseptic in two layers, with a special fire-bio protective compound. The load-bearing frame of the house is mounted using a galvanized double-reinforced fastening system.

Roof - metal tile

  • Cover: polyester, with 15 years quality guarantee
  • First class galvanizing - 275 g/sq.m.
  • Steel thickness: 0.5mm
  • Assorted colors
  • Reinforced truss system from a board 200 * 50 mm, grade 1, with a step of 580 mm
  • A four-layer diffusion membrane is used to protect the roofing system

Window

  • PVC window structures REHAU SIB-Design, standard sizes
  • Profile thickness 70 mm
  • 2-chamber double-glazed window (3 glasses), 5-chamber profile (white color), mosquito nets
  • Fittings: ROTO NT

Complete set of houses from a bar

Wall material to choose from

Solid timber

Advantages:

  • Affordable price
  • Wide use
  • Minimum delivery times
  • Easy to build at home

Disadvantages:

  • Additional costs for finishing or guarding
  • Imperfect appearance
  • Additional costs for antiseptic
  • Increased cracking

Glued laminated timber

Advantages:

  • Excellent appearance
  • Very low shrinkage and shrinkage
  • Does not crack
  • Does not need additional processing

Disadvantages:

  • Increased price
  • Reduced vapor permeability of the material

Profiled timber

Advantages:

  • Great look
  • Making connections with departures (into the bowl)
  • Tighter connection between crowns and in corner joints

Disadvantages:

  • The need for a break to shrink
  • The appearance of cracks on the surface over time

Foundation

Pile-screw

  • VS-108/300/2500mm, TU 5260-001-84045723-2011
  • Piles are twisted using special equipment
  • Pile wall thickness 4 mm, blade thickness 5 mm
  • Inside the piles are filled with concrete mix M300
  • Welded metal head, 200 * 200 mm
  • The pile is covered with a 2-component factory protective composition

Tape

  • Plinth height 600 mm, band width 300 mm
  • Sand cushion: 300mm
  • High-strength rebar d12 mm class AIII
  • Prefabricated concrete, grade M300 (B22.5)

Double waterproofing of the foundation is used.

Domokomplekt

Basement and interfloor ceilings

  • Reinforced basement joists, made of board 50*200 mm, with a step of no more than 580 mm
  • Reinforced floor joists are made of chamber-drying planed boards of the 1st grade 50 * 200 mm (14-18% humidity), with a step of no more than 580 mm

External and internal bearing walls

  • Exterior walls and gables made of timber 150 * 150 mm (possibly 200 * 200 mm)
  • Internal bearing walls made of timber 150 * 150 mm (possibly 200 * 200 mm)
  • Between the timber, an interventional insulation "jute fiber" or "lnovatin" is laid in 2 layers
  • The assembly of the corners of the house is carried out using the "warm corner" technology
  • Installation of the crowns of the beam is carried out on a wooden dowel

All wooden structures are antiseptic in two layers, with a special fire-bio protective compound. The load-bearing frame of the house is mounted using a galvanized double-reinforced fastening system.

Roof

  • Reinforced truss system from a board 200 * 50 mm, grade 1, with a step of 580 mm
  • Step-by-step crate 100*25 mm
  • Temporary roofing made of ruberoid is installed

Complete set of log houses

Wall material to choose from

  • Rounded (calibrated) log
  • Carriage (Norwegian felling)
  • planed log
  • scraped log
  • debarked log

Foundation

Pile-screw

  • VS-108/300/2500mm, TU 5260-001-84045723-2011
  • Piles are twisted using special equipment
  • Pile wall thickness 4 mm, blade thickness 5 mm
  • Inside the piles are filled with concrete mix M300
  • Welded metal head, 200 * 200 mm
  • The pile is covered with a 2-component factory protective composition

Tape

  • Plinth height 600 mm, band width 300 mm
  • Sand cushion: 300mm
  • High-strength rebar d12 mm class AIII
  • Prefabricated concrete, grade M300 (B22.5)

Double waterproofing of the foundation is used.

Domokomplekt

Basement and interfloor ceilings

  • Reinforced basement joists, made of board 50*200 mm, with a step of no more than 580 mm
  • Reinforced floor joists are made of chamber-drying planed boards of the 1st grade 50 * 200 mm (14-18% humidity), with a step of no more than 580 mm

External and internal bearing walls

  • External walls and gables made of logs 240 mm (possibly 280 mm)
  • Internal load-bearing walls made of logs 240 mm (possibly 280 mm)
  • Interventional insulation "jute fiber" or "lnovatin" is laid between the logs in 2 layers
  • Dowels, sealing tape for sealing
  • Beams - treated with fire-retardant composition.

All wooden structures are antiseptic in two layers, with a special fire-bio protective compound. The load-bearing frame of the house is mounted using a galvanized double-reinforced fastening system.

Roof - metal tile

  • Cover: polyester, with 15 years quality guarantee
  • First class galvanizing - 275 g/sq.m.
  • Steel thickness: 0.5mm
  • Assorted colors
  • Reinforced truss system from a board 200 * 50 mm, grade 1, with a step of 580 mm
  • A four-layer diffusion membrane is used to protect the roofing system

Complete set of houses from SIP panels

Foundation

Pile-screw

  • VS-108/300/2500mm, TU 5260-001-84045723-2011
  • Piles are twisted using special equipment
  • Pile wall thickness 4 mm, blade thickness 5 mm
  • Inside the piles are filled with concrete mix M300
  • Welded metal head, 200 * 200 mm
  • The pile is covered with a 2-component factory protective composition

Tape

  • Plinth height 600 mm, band width 300 mm
  • Sand cushion: 300mm
  • High-strength rebar d12 mm class AIII
  • Prefabricated concrete, grade M300 (B22.5)

Double waterproofing of the foundation is used.

Internal load-bearing walls and partitions

  • Made using frame technology
  • Vertical racks from planed boards of chamber drying (14-18% humidity), 1 grade, 100*50 mm and 150*50 mm

Roofing system

  • To protect the roofing system: the outer side is a four-layer diffusion membrane, the inner side is a three-layer polyethylene film.

All wooden structures are antiseptic in two layers, with a special fire-bio protective compound. The load-bearing frame of the house is mounted using a galvanized double-reinforced fastening system.

thermal insulation

  • External walls - non-combustible polystyrene foam (150 mm)
  • Interior partitions - environmentally friendly slab basalt insulation (100 mm)
  • The floor of the first floor is non-combustible polystyrene foam (150 mm)
  • Attic floor (ceiling of the second floor) - environmentally friendly slab basalt insulation (100 mm)

Roof - metal tile

  • Cover: polyester, with 15 years quality guarantee
  • First class galvanizing - 275 g/sq.m.
  • Steel thickness: 0.5mm
  • Assorted colors

Exterior finish of the facade

  • Ventilated façade: 35*35 mm timber counter-lattice
  • Painted galvanized ebbs are mounted on the plinth along the outer perimeter

Interior wall decoration

Moisture resistant board OSB-3, 2500*1250*9 mm

Window

  • PVC window structures REHAU SIB-Design, standard sizes
  • Profile thickness 70mm
  • 2-chamber double-glazed window (3 glasses), 5-chamber profile (white color), mosquito nets
  • Fittings: ROTO NT

RUB 905,000

House from a bar TALE

Price: from 905,000 rubles.

Total area: 154 m²
Dimensions: 10.8 by 10.6 m

The porch of a country mansion according to this project is built into the main room. From it we pass into the vestibule, parallel to it is a dignity. node, and go out into the hallway. On the left is the living room, we use it at will, we directly enter the spacious living room with an area of ​​28 square meters. m, combined with a kitchen with a dining room. The entrance to the boiler room is located separately. On the attic floor there are four bedrooms and a bathroom.

The presence of many rooms will allow the owners and guests of the cottage to spend time, as in a "fairy tale".

You can FREE modify this project or order an individual one to your liking

Reviews and gallery of project works:

More

Options:

A set of houses made of timber 150x150 mm.


The house package includes:

House made of timber 150x150 mm.

Internal partitions - timber 100x150 mm.

Draft floor - board 25x150.

Roof gables - timber 150x150 mm.

Roof covering with ruberoid.


Delivery

Get a free consultation

RUB 905,000

House set made of profiled timber 140x140 mm.


The house package includes:

House made of profiled timber 140x140 mm.

Clear height of the 1st floor 2.7m.

Clear height of the 2nd floor 2.5m.

Connection of corners - in dressing with a root spike

Fastening of a bar - a wooden dowel.

Mezhventsovy heater - jute, flax fiber.

Floor and ceiling beams - timber 100x150.

Draft floor - board 25x150.

Roof gables - profiled timber 140x140 mm.

Rafter system, crossbar - board 50x150.

Roof sheathing - board 25x150.

Roof covering with ruberoid.

Add. materials - self-tapping screws, nails, roofing material, compensation screws.


Delivery.

Unloading material at the entrance of the truck.

Assembly of the house on the site of the customer.

Get a free consultation

RUB 1,025,000

House set made of profiled timber 190x140 mm.


The house package includes:

House made of profiled timber 190x140 mm.

Internal partitions - profiled timber 90x140 mm.

Clear height of the 1st floor 2.7m.

Clear height of the 2nd floor 2.5m.

Connection of corners - in dressing with a root spike

Fastening of a bar - a wooden dowel.

Mezhventsovy heater - jute, flax fiber.

Floor and ceiling beams - timber 100x150.

Draft floor - board 25x150.

Roof gables - profiled timber 190x140 mm.

Rafter system, crossbar - board 50x150.

Roof sheathing - board 25x150.

Roof covering with ruberoid.

Add. materials - self-tapping screws, nails, roofing material, compensation screws.

Good afternoon! I ordered the construction of a house from this company in 2015. Arnkell project. All this time the house stood mothballed. Now start decorating. The house is amazing. True, one of the bathrooms on the second floor is not very conveniently located, so I had to give up one room and make a bathroom in the room above the lower bathroom. On the ground floor, the boiler room had to be abandoned. If I left it, it would still not fit all the necessary equipment, but the stairs would turn out to be very steep. I would be grateful to the company's specialists if they answered the question: can a boiler and home heating equipment (electricity) be placed on the second floor? Will it damage the structure of the house? Thank you!

Healthy

Reply

7 495 989-63-95

Good afternoon! Thanks for the feedback! With your question, please contact the Company's office by phone +7 495 140 5575 to engineer Alexander Shvedov. It is necessary to understand the location, type, weight of the equipment to determine the possibility of its installation.

Reply

We do not build often, but so far there are a lot of oddities. Last year, 2018, the work was not completed, it was postponed to this year. The brigade arrived 2 weeks later than stated in the schedule, no one warned about the transfers. We arrived, we need to finish last year, it turned out that the cellar was built with an area of ​​​​1.45X1.45 instead of the declared 2x2x2, and the height has not yet been measured, because. water is standing in the cellar... there are no words... The team said that it was impossible to remake the cellar and began finishing the house. The company has been silent for a week, the manager, of course, was told ... what should we do with the pool instead of the cellar? I don’t understand, you need to constantly swear so that everything is fine for you and on time for your own money? and, by the way, I confirm that it is not always possible to get through to the office during business hours, checked.

Healthy

Reply

7 495 989-63-95 Russia, Moscow, sh Varshavskoye, 46

Dear Natalya Ivanovna! Well, why are you reporting to the public, to put it mildly, unreliable information ??? All work, according to the Contract, was completed. Evidence of this is the signed Acceptance Certificates. Only the rough floor was not completed, which you yourself asked the team not to do, because. communications will be brought into the house, and, accordingly, the upper part of the cellar. You and I had a verbal agreement to complete everything at the stage of finishing work - which is what we are doing at the moment !! Moreover, there was not even an Agreement for finishing work (by the way about the timing) - we promised to complete the finishing, we are doing it. Further. Cellar. Firstly, 5 days ago, when you called the office, the dimensions were 1850x1850 mm (which you yourself announced). "Shrunk" in 5 days? Or an undisguised FALSE??? We also had a conversation about water, during which it was decided to find out the origin of the water in the cellar - for almost a year the house was actually open, without windows / doors. And, if it turns out that the waterproofing layer does not hold, there was an assurance from the Company that the problem would be fixed. You currently have a team of CARPENTERS-FINISHERS who are not familiar with cellar technology at all ("The team said that it was impossible to remake the cellar"). Maybe you also have "claims" about the work of carpenters? So do not be silent, we always listen to the remarks of the Customers and adequately respond to them. And what should we tell you in a week, if until today you have not installed windows / doors, besides, the type of casing boxes has not yet been approved ??? But did we quarrel with you, or at least promised something and did not fulfill it ??? NO!!! Another LIE on your part!! Or in all of the above, there is a lie on our part??? Well, another confirmation that you can’t treat anyone with conscience ... Perhaps we will change the principles of our work, even if you, seemingly a decent person, begin to spread FALSE to the masses !!

Reply

Here is another demonstration of strangeness: such communication with clients who, despite the shortcomings and shortcomings in your work, pay everything on time. Clients have the right to know that the schedule is shifting, that problems are being solved. You will not believe it, but we, the clients, also have plans, schedules in a certain sense. And, yes, customers need to be warned, just out of respect, although ... after your letter, what am I talking about ... You are busy sorting customers into decent and dishonorable, you have no time. BUT, I note that it is your letter that shows your attitude towards your own customers and their problems. What does the subfloor, carpenters, cursing, etc. have to do with it? My letter says about non-compliance with the deadlines and the lack of desire to inform the client that the start dates of work are shifting. The cellar does not correspond to the size, why are your sarcasms about "shrunken"? Is there a mismatch? The arrival and freezing of a representative of the company decides everything, since you think that everyone around is lying, but only you live in good conscience. And "another lie" - what are you talking about? Where is the lie? Strangeness and silence are described for weeks when the problem has already been reported to the office. The principles really need to be changed, it can be more active to work with clients, not to be silent for weeks, to report shifts in schedules or actions taken to eliminate inconsistencies, so there will be no problems and your so emotional letters with accusations of everyone around ... And it seems that You are stuck on the keyboard "!" and "?" Or do you dislike your customers so much with their problems that this storm of hatred and indignation is expressed in you through punctuation marks? Usually, reputable companies that respect themselves and others respond in a similar way: "We apologize for the inconvenience caused. The client's opinion is very important for our company. At the moment, we have made efforts to eliminate the shortcomings of the work, we hope for further fruitful cooperation." And do not thank for the updated text of the letter for your future customers, use it to your health! Sincerely, Victoria Valerievna (daughter of Natalia Ivanovna)

Reply

Dear daughter Victoria Valerievna! Let's start at the end of your post. Nothing on the keyboard sinks and where do you see hatred and indignation? A few exclamation marks? Rave. I repeat once again - we, as a whole, and everyone, are not angels, even for 17 years of work there are minor shortcomings in its organization, there is no need to lie openly, especially since you have never been present at any discussions / conversations / negotiations. "Another lie" is this, from your first post: "you need to constantly swear so that everything is fine for you and on time for your own money." No one has ever quarreled with you or your mom/dad! Neither the foreman, nor the team, nor the employees in the office. Further. There really is a fact of size reduction, I never denied it! Here are just the actual measured size 1850x1860 mm. And, if it is YOU who do not know why this happened, I explain - the cellar should be located at a distance from the foundation tape. In the place where it is arranged, the distance between adjacent tapes is 2000 mm. As a "sorry" you made not a bad discount on the finishing work. And, by the way, your "pool" is made so high quality that it did not let the water from the rains and snow through it, which got into it during the construction of the house, for almost a calendar year! Well, the postponement of the start of work by 2 weeks. If you pay attention to clause 3.1. of the Agreement, then there is a PRELIMINARY DATE FOR THE START OF WORK, and further, according to the text of the same Agreement, "... notify the Customer 3 days before the start" ..., in this case, the delivery of the material. Which is what was done. And the work was completed on time, even a little ahead of schedule!

Reply

Wow, you are all so dissatisfied with your customers! yes, they are completely unbelted, they want their problems to be solved for their money. Brad, of course! agree! "Neither with you, nor with your mom / dad, no one ever cursed!" It's funny, why argue with us if we paid for everything last year? It was we who had to call and write to remember our problems, until mid-July your company could not answer us anything. Thank you for the information about the required distance of the cellar from the foundation tape, I didn’t know, not the builder. The only pity is that your specialists, it seems, also did not know, since they promised / designed other sizes of the cellar. Thanks for the discount, of course! But, firstly, it was provided for a reason, but because of the identified problems, and secondly, it is already almost on the verge of a scandal. No, well, thanks anyway, I understand that from the bottom of my heart! Yes, I was not present at the negotiations, but everyone talks, but when it comes down to it ... Therefore, only correspondence and facts. And it is interesting not only to build with you, but also to correspond with you.

Reply

I have been calling for the third day, the phones do not answer or are not serviced, it is not clear that they are encrypted, they may be hiding!

Healthy

Reply

7 495 989-63-95 Russia, Moscow, sh Varshavskoye, 46

Dear Clauser (almost a Clauser)! Working hours of the Company 10-20 hours. On the site 3!!! phone numbers that you can always call during working hours! Of course, if you have the desire to do so.

Reply

There were extremely positive impressions after the interaction, they built a one-and-a-half-story cottage from glued beams for us. We took the finished LIULF project, in which we made minor changes (they removed the balcony and increased the bathroom area at the expense of the nursery). After signing the contract, I didn't have to pay anything extra. The only negative is that there were very heavy showers before the start of construction, the road was completely washed out, and the deadline had to be postponed by a week and a half. For the rest, everyone is happy. And the foreman Sharikov V.G. and his team are real pros!

Healthy

Reply

7 495 989-63-95 Russia, Moscow, sh Varshavskoye, 46

I myself am from Sochi, I built a house there in the Upper Yurt. We practically do not have good companies for the construction of wooden houses, we had to look in the Central regions of our Russia. I negotiated with the company G * d-V * d, there is a price tag on it, so space, and when I learned that I was from Sochi, they counted me more overhead costs for almost 400 tr. Another company from Moscow was also a priority, well, I found a lot of bad reviews about their work. As a result, I settled on the PSK Dom-Skazka. To be honest, there were doubts about the veracity of some reviews from the Internet, and for almost 2000 km of distance I could only focus on the quality of work. But, one of the selection criteria was not the presence of positive reviews, but the practical absence of negative ones. I myself own a cargo transportation company and I know that they run to write not when everything is pleasant, but on the contrary, when even the slightest delay (in our area) is everything, negative, all goats. The project was chosen by Torr from glued laminated timber 175x185 mm in the "Turnkey" complex, only he ordered windows from the locals. The foundation was made by “poor Russian-speaking Sochi” craftsmen from Abkhazia (in the Fairy Tale they said that there was no experience in building in rocky soils - thanks for the honesty). The materials were brought back by their own trucks. The materials were accepted and paid for at the time of loading at the production site. I confirm that the prices correspond to those stated on the site, I only had to pay for the flight, accommodation and work of the foreman (150 tr. in total), as well as the compartment for the brigade (about 32 tr. in both directions). I took them to the bathhouse several times, and, of course, a thanksgiving dinner upon completion of the work. The house was built in 6 weeks, they worked from 6 am to 11-12 noon, and from 4 to 8 pm they ran to the sea in the afternoon. Additionally, I bought a German antiseptic, blew all the wood. In the south of the Russian Federation, it is customary to recommend only trusted people - so, I recommend this Company! He wrote everything from the bottom of his heart, without embellishment and emotions. My doors are always open to all employees of Dom-Skazka.

Healthy

Reply

7 495 989-63-95 Russia, Moscow, sh Varshavskoye, 46

On my behalf and on behalf of my parents, let me express my gratitude to all the employees of the company and, of course, mainly to the wonderful team of Murashov Evgeny, Murashov Ivan and Alexander. the house for the parents at the dacha was built just perfect without the slightest jambs and strictly on time. neat work. I don't even know what to add. I just want to recommend this company to everyone. they are honest and responsible workers.

Healthy

Reply

7 495 989-63-95 Russia, Moscow, sh Varshavskoye, 46

Fellow trolls and detractors! How disgusting it is to read your absolutely non-specific reviews about Dom-Skazka! Stop lying to them and stop trying to convince others of this! There are six houses built by Skazka starting from 2012 in our SNT Yuzhny Pushkinsky district alone! And I personally know 3 neighbors who left positive feedback about their work here. Come, see, communicate with those who really built their houses, and not yesterday or the day before yesterday, but over the past 5 years. Note that those who make a choice in favor of this contractor - no one writes that someone's wall collapsed or the foundation squinted, but they write real implausible nonsense about materials that are disgusting! And this despite the fact that we, consumers, pay for these materials only after they are unloaded at our sites, without making any prepayment! That their houses are expensive - well, go to Z ***, it's cheap there! So what if the floor shakes underfoot and the wall collapses at the touch, it's cheap. I had the finishing touches done a week ago. Before that, they did the wiring of all communications. The house was built last year according to their new technology. So, those neighbors who were built before its introduction are now very sorry that they did not wait. Materials at the highest level, the builders are also sensible. Special respect to the manager Nikitin D.V. and foreman Bazanov A.A. I recommend Dom-Skazka to everyone and do not look for an alternative - it simply does not exist!

Healthy

Reply

7 495 989-63-95 Russia, Moscow, sh Varshavskoye, 46

The team of the Dom-Skazka Company sincerely thanks you for leaving a review about our work! We build for you!

Reply

I want to warn everyone, since all the reviews are custom-made on the Internet for this company. We are building with them, frayed all our nerves, fell for the reviews too. There are many lawsuits against them, the management treats customers after they take the deposit, it is extremely inadequate. It’s impossible to get through on the phone, they hang up during a conversation, they don’t deliver materials, the workers are transferred to another facility and they say “wait for another team for 2 months, we put you on the waiting list.” If there is some kind of problem, only the customer is to blame, but not the company, for everything they have their own truth; they don’t pay attention to your words, you’re all lying :)) For example: you tell people that the roads along the thaw (from April 1 to April 25) in the villages of the Moscow region are closed for heavy equipment, import material either before or after these dates, they but it’s a rod in the very rain right after the snow has melted - and then it’s your fault that they broke your road. I don’t understand at all why such an attitude towards the client, take into account at least the fact that we pay in cash and always on time - for work and for materials. I’ll have to start a lawsuit, although I had hope to finish building at least somehow with them and exhale, but it didn’t work out. Bypass SK Dom Skazka and all the companies affiliated with it - storytellers work there, not professionals.

Healthy

Reply

7 495 989-63-95 Russia, Moscow, sh Varshavskoye, 46

And where are you building territorially? We are building a house with them, it remains to make windows and floors. It didn’t go smoothly on the road either, the driver was caught.

Reply

Dear Mr. M*kin and his wife (below, under the nickname Yana and subsequently deleted the continuation of the nickname Mokina). Your situation is comical, and causes nothing but laughter. Do you not meet at home and communicate here?? We put on public display one of the "honest and non-custom" reviews of an "adequate" customer. If you don't mind reading to the end, you have to deal with kamikmi clowns. So, yes, indeed, one of our dealers had the imprudence to build a credit house for Mr. M * kin (name is not disclosed in accordance with the requirements of Federal Law No. 152). From May 22, 2017, work began on the foundation, by May 28 everything was ready for pouring the concrete mixture. But, unfortunately, from the 27th (for sure, everyone remembers the anomalous summer of 17, when the sun shone only 4 days in 3 months, according to official data from Roshydromet). The road to the site was washed away so that not a single truck could pass on it. The team honestly sat for almost a week, after which the foreman found a tractor and agreed for 12 tr. drag the mixer with concrete to the site and back. Having voiced this proposal to the customer, the answer was received that "it does not burn for me, but for 12 tr I will fill it all the way." On that, they decided - the brigade left for the next object, to wait for the weather and the paved road. We waited until August, the road did not appear. Somehow August 15th!!! between the rains they drove the mixer and fulfilled their obligations. By the way, on September 1, the house was supposed to be handed over, naturally, the brigade planned for construction had already signed for other houses (this is to repost ""wait for another brigade for 2 months, we put you on the waiting list"). And, as you understand, Mr. M*kin did not give up a penny for it!!!, referring to the fact that the road is in municipal ownership and he will not pay (as it turned out later, the road has not yet been transferred to municipal ownership). Winter came. After long negotiations, we managed to persuade the customer to clear the road from snow. This happiness happened already on March 13, 2018. Moreover, once a week, he called the office and hysterically demanded that the foreman do this, subject to a clearly stated obligation to ensuring by the customer "unhindered access of vehicles with a capacity of 20 tons to the place of work". The foreman had to run for money for the supplied materials for almost a week ("we pay in cash and always on time - for work and for materials") - t o I didn’t order at the bank, then I had an emergency at work. We drove. We assembled the house, it's time to import roofing materials. We call the customer, so they say, and so, in 2 days we will bring the roof. April 14 outside. OK, bring it in! ("You tell people that the roads along the muddy roads (from April 1 to April 25) in the settlements of the Moscow region are closed for heavy equipment"). During this time, the neighbors put up a barrier, they managed to enter, it was open, they unloaded, they left, the neighbors pulled in 2 cars and did not let out, he never paid money for the road. A call to the customer did not give anything - your problems, as you drove in, so leave !!! I'm at work and can't come. Scandal. We call the police, so they say, and so, they do not allow to leave. And then the climax: the police major calls the customer to sort out the situation, to which he receives the answer: “I don’t know anything about any delivery, the car didn’t drive to me !!!” Can you imagine??? The car is standing at his site, unloaded material lies on the site and the team is building a house for him! There are three neighbors and two policemen standing around!! What were their faces? Adequate??? As a result, he turned off the phone, the foreman found a caterpillar tractor and he pulled the car onto the road for 2 km across the field. It is not known how this story ended now, until the moment the roof was handed over, both the customer and the team left the cars behind the barrier ... Believe me, this is only 1/10 of what this "respectable" citizen threw out to the contractor. Of course, after all this, the contract was immediately terminated, neither windows nor interior decoration were carried out. Why didn’t they send it right away, although there were prerequisites at the foundation stage? The bank transferred an advance payment under a loan agreement, and I did not want to spoil my reputation with unfulfilled obligations. These are the "clients" who write "honest" reviews about the work of "non-professional" construction companies. Every single thing described here is confirmed by telephone records and audio-video filming. Mr. Mo*in, we didn't lie??? Perhaps they slandered you in what ??? Where is the promised lawsuit? Maybe even in the courtroom you take off your cowboy hat, which you don’t part with even in a decent society??

Reply

Dom-Skazka is an excellent company that I am not ashamed to recommend to my friends and business partners. An open, honest approach to the client, I personally left only positive memories. They are well aware of their weaknesses and are not afraid to talk about it. Probably, this helps them to do their work on time, on time, conscientiously, as for themselves. Thank you and prosperity to your business

Healthy

Reply

7 495 989-63-95 Russia, Moscow, sh Varshavskoye, 46

2 years ago

I want to thank the employees of the company for the country house. Before that, I didn’t have a place to spend the night in my dacha, only a building for inventory. But the neighbor rebuilt last year and advised the House-Fairy Tale. Now he has a campaign on quiet evenings. Kudos to the construction team. Everything was done carefully, without damaging the garden and the old well.

Healthy

Reply

7 495 989-63-95 Russia, Moscow, sh Varshavskoye, 46

2 years ago

Having studied a large number of offers and visited all the exhibitions in Moscow and the Moscow Region, I came to the conclusion that the most important thing is not the number of bonuses that companies offer, but the quality of the material and work in the final result. As a result, my choice fell on the company Dom Skazka. A long search for exactly “my” project, the configuration I needed, dimensions, negotiations with specialists, coordination of redevelopment, consultations on all issues related to construction and other things, the manager of the company, a high professional in his field, Anatoly Kovalenko, helped me in all this. We worked with him continuously all the time while construction was underway. Due to bad weather conditions, the construction of the house was pushed back a little, and I was worried that we might not be in time before the onset of cold weather, but the team led by foreman Alexander Bazanov did an excellent job! As a result, I got a wonderful, warm home! I hope it performs well in use. I thank the Skazka House company under the leadership of Roman Golovanov, all the specialists who contributed to the construction of my house, and I wish you prosperity and success in business. Many thanks to Anatoly Kovalenko, Alexander Bazanov and the guys: Andrey, Sasha and Sergey!

Healthy

Reply

7 495 989-63-95 Russia, Moscow, sh Varshavskoye, 46

2 years ago

The Dom-Skazka company built a one-story house with a garage from glued beams for me. The work of the company is impressive, which means experience and work organization. In my work, I often contact construction companies and private contractors (in the finishing industry), but very few adhere to this approach to business. The result of the work in a good way surprised me - the quality of the material fully corresponds to the declared, the work is at the highest level. The house turned out to be truly a fairy tale - refer only to them.

Healthy

Reply

7 495 989-63-95 Russia, Moscow, sh Varshavskoye, 46

2 years ago

I keep my promise and leave my review about the company Skazka House. It was a pleasure to work with Dom Skazka. My brother and I built a small dacha for our parents. The idea of ​​building arose by chance, it was supposed to be a gift for the anniversary. There was not much time, and when choosing a developer, an important condition was compliance with the construction deadlines, which many companies guaranteed only in words, without prescribing it in the contract. It was necessary to build outside the summer season, and this is not the best time for dirt roads. In addition, it was necessary to save part of the buildings and leave the apple orchard undamaged. But, despite these difficulties, everything worked out, even better than expected. The surprise was a success, for which the guys and employees of the company bow low. Namely: foreman Bazanov Alexander, foreman Volkov Sergey and 3 members of the brigade - Ruslan, Sergey and Ivan. Parents could not believe it, because two and a half months ago it was not like home, there was not even a foundation. By the way, the parents asked to indicate the address of their site: Noginsk district, SNT Rassvet, uch. 124. Who wants to visually see the work of the company, you are welcome.

Healthy

Reply

7 495 989-63-95 Russia, Moscow, sh Varshavskoye, 46

2 years ago

For a year now I have been living in a house built of timber by the Skazka House company. I deliberately did not write a review immediately after the completion of construction. I am convinced that quality must be tested with time. By my standards, the house was built too quickly, almost instantly. I was not often at the construction site, and I simply did not believe it when, 2 weeks after the start of construction, the foreman called me and invited me to accept the power unit. And a week later they made the roof and put the windows. My doubts about the quality of construction were dispelled by an expert from an insurance company, although certain concerns still remained. But now I can say with confidence that my fears were in vain, which makes me very happy. Today I hung the last chandelier and remembered with my beloved wife how it all began .... I express my gratitude and wish the company success.

This is a close-knit team of specialists who know and love their work. We have established ourselves as a stable and reliable company that respects its customers and protects its reputation. The gratitude of our Customers for the excellent work on the design and construction of wooden houses is the best confirmation of our high level.

Construction company "Skazka"- performs a full cycle of work on the creation of a wooden house, we offer:

  • wooden house projects, cottages and baths,
  • construction of wooden houses for standard and individual projects,
  • construction of baths from a log and a bar.

Since January 1, 2010, the Russian construction industry has switched to self-regulation and the issuance of licenses for construction work has ceased. In accordance with the law, construction, design and survey companies must join self-regulatory organizations and obtain certificates of admission to certain types of work (Order of the Ministry of Regional Development dated December 30, 2009 N 624 "On approval of the list of types of work on engineering surveys, on the preparation of project documentation, on construction, reconstruction, overhaul of capital construction facilities that affect the safety of capital construction facilities").

Clause 2. This list does not include types of work on the preparation of project documentation, on construction, reconstruction, major repairs in relation to facilities for which the issuance of a construction permit is not required in accordance with "paragraphs 1 - 4", "5 of part 17 Article 51" of the Town Planning Code of the Russian Federation (Sobraniye Zakonodatelstva Rossiyskoy Federatsii, 2005, N 1, Art. 16; 2006, N 1, Art. 21; 2008, N 30, Art. 3616; 2009, N 48, Art. 5711; 2010 , N 48, item 6246; 2011, N 13, item 1688; N 27, item 3880; N 30, item 4563, item 4572, item 4591), as well as in relation to objects of individual housing construction (separately standing residential buildings with no more than three floors, intended for the residence of no more than two families); residential buildings with no more than three floors, consisting of several blocks, the number of which does not exceed ten and each of which is intended for one family, has a common wall (common walls) without openings with the neighboring block or neighboring blocks, is located on a separate land plot and has access to the common area (residential houses of blocked development); apartment buildings with no more than three floors, consisting of one or more block sections, the number of which does not exceed four, each of which contains several apartments and common areas and each of which has a separate entrance with access to the common area. (as amended by the "Order" of the Ministry of Regional Development of the Russian Federation of November 14, 2011 N 536) The types of work on the preparation of project documentation contained in the List can be performed by an individual entrepreneur independently (personally), and the types of work on engineering surveys, construction, reconstruction, overhaul - only with the involvement of employees in the manner prescribed by the "legislation" of the Russian Federation. (the paragraph was introduced by the "Order" of the Ministry of Regional Development of the Russian Federation of 06/23/2010 N 294)

Companies engaged exclusively in low-rise construction of dachas, cottages or townhouses, and falling under the exceptions of the order of the Town Planning Code, are not required to join the SRO.

Our builders have over 10 years of experience in building wooden houses. The construction of each object is constantly monitored by a qualified foreman-builder, he checks the quality of the work performed at different stages of construction, and also coordinates all emerging issues with the Customer. We always strive for mutual understanding with our Customers and strictly comply with our contractual obligations. If errors occur, we do not shy away from correcting them and provide a guarantee for all construction work. Payment for the construction work of houses in our company is carried out in several stages.

Construction company "Skazka" builds wooden houses all year round, takes into account all the wishes of the Customer, competently binds the object to the area. In our office, we are pleased to offer you ready-made projects of wooden houses, from which you can choose the most pleasant and convenient project. We will always help you choose the best equipment for your home and tell you in detail about the features of a particular solution. In the course of design and construction work, you will be provided with the most detailed information about their implementation.